Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137M586 + (03:46:43, 12 December 2024)
- ML20137M585 + (03:46:44, 12 December 2024)
- AECM-85-0267, Responds to NRC Re SALP Repts 50-416/85-12 & 50-417/85-03 for Oct 1983 - Apr 1985.Corrective Actions: Procedure 10-S-01-05 Revised to Resolve NRC Concerns & Rev 10 to Emergency Plan Expected by Sept 1985 + (03:46:45, 12 December 2024)
- ML20137M581 + (03:46:45, 12 December 2024)
- ML20137M580 + (03:46:46, 12 December 2024)
- ML20137M577 + (03:46:47, 12 December 2024)
- ML20137M573 + (03:46:47, 12 December 2024)
- BECO-85-162, Application for Amend to License DPR-35 Consisting of Proposed Change 85-11,revising Section 3.3.8.3.a Allowing Substitution of Qualified Person for Rod Worth Minimizer at Power Levels Equal to or Less than 20%.Fee Paid + (03:46:48, 12 December 2024)
- ML20137M565 + (03:46:49, 12 December 2024)
- ML20137M562 + (03:46:49, 12 December 2024)
- IR 05000481/1996021 + (03:46:50, 12 December 2024)
- ML20137M555 + (03:46:51, 12 December 2024)
- ML20137M559 + (03:46:51, 12 December 2024)
- ML20137M552 + (03:46:55, 12 December 2024)
- ML20137M551 + (03:46:56, 12 December 2024)
- ML20137M543 + (03:46:57, 12 December 2024)
- ML20137M541 + (03:46:57, 12 December 2024)
- U-600230, Potential Part 21 Rept (21-85-11) Re Quality Deviation in Component of Technology for Energy Corp Model 914-1 Flow Monitor Modules Which Could Result in Failure of Indicator to Reset.Corrective Action Under Evaluation + (03:46:58, 12 December 2024)
- ML20137M534 + (03:46:59, 12 December 2024)
- ML20137M532 + (03:47:01, 12 December 2024)
- ML20137M531 + (03:47:02, 12 December 2024)
- CY-97-023, Informs NRC of Changes within Nuclear Group Which Affects Distribution of NRC Correspondence to Cyap & Neut + (03:47:03, 12 December 2024)
- 3F0885-18, Revises Response to Violations Noted in Insp Rept 50-302/85-17.Corrective Actions:Review of Sys Welds Conducted to Assure That Welding Processes Completed in Accordance W/Specified Requirements + (03:47:04, 12 December 2024)
- ML20137M521 + (03:47:04, 12 December 2024)
- IR 05000285/1997003 + (03:47:07, 12 December 2024)
- ML20137M509 + (03:47:08, 12 December 2024)
- ML20137M506 + (03:47:09, 12 December 2024)
- ML20137M507 + (03:47:09, 12 December 2024)
- ML20137M498 + (03:47:10, 12 December 2024)
- ML20137M495 + (03:47:11, 12 December 2024)
- RBG-22051, Forwards Results of Seismic Qualification Miniaudit, Conducted by Nutech Engineers,Inc on 850520-0809,concluding That Adequate Program Implemented That Conforms to NRC Criteria & Stds + (03:47:11, 12 December 2024)
- ML20137M491 + (03:47:12, 12 December 2024)
- 05000336/LER-1996-032, :on 961008,potential Failure of RCS Vent Sys to Perform Design Function Discovered.Caused by Inadequate Design of Reactor Head Vent Portion of RCS Vent Sys. Implemented Mods + (03:47:14, 12 December 2024)
- ML20137M487 + (03:47:15, 12 December 2024)
- ML20137M486 + (03:47:15, 12 December 2024)
- ML20137M480 + (03:47:17, 12 December 2024)
- ML20137M481 + (03:47:17, 12 December 2024)
- ML20137M476 + (03:47:18, 12 December 2024)
- 05000331/LER-1997-005, :on 970224,setpoint for Recirculation Flow Upscale Rod Block Greater than TS Allowable Limits.Caused by Inadequate Implementation of TS Amend 193.STP 42C006-SA Was Revised + (03:47:20, 12 December 2024)
- BECO-85-163, Forwards Rev 1 to Procedure 5.7.5, Estimating Core Damage, Per Request in 850701 SER Re post-accident Sampling Sys + (03:47:21, 12 December 2024)
- ML20137M474 + (03:47:21, 12 December 2024)
- ML20137M470 + (03:47:22, 12 December 2024)
- ML20137M463 + (03:47:23, 12 December 2024)
- ML20137M462 + (03:47:23, 12 December 2024)
- ML20137M458 + (03:47:24, 12 December 2024)
- ML20137M459 + (03:47:24, 12 December 2024)
- ML20137M457 + (03:47:25, 12 December 2024)
- B16301, Application for Amend to License NPF-43,re TS Surveillance 4.7.1.2.1.b,requiring Testing of AFW Motor Driven & Turbine Driven Pumps on Recirculation Flow at Least Once Per 92 Days + (03:47:29, 12 December 2024)
- IR 05000528/1985027 + (03:47:30, 12 December 2024)
- ML20137M443 + (03:47:30, 12 December 2024)
- ML20137M439 + (03:47:31, 12 December 2024)
- B16364, Revises Util Commitment Re Steam Supply Lines to Turbine Driven AFW Pump + (03:47:32, 12 December 2024)