Text

m Georgia Power Company Rcuta 2. Box 299A Waynesboro. Geor0ia 30830

  • Telephone 404 554 9961
  • ^

-404 724 8114 Southern Company Services, Inc.

Post Office Box 2625 Birmingham. Alabama 35202 Telephone 205 870-6011 Vogtle Proj.ect September 6, 1985 Director of Nuclear Reactor Regulation File: X7BC35 Attention: Ms. Elinor G. Adensam, Chief Log:

GN-702 Licensing Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CORRECTIONS

Dear Mr. Denton:

Attached for your staff's review is an errata sheet which documents errors which have appeared in the VEGP SER. If your staff agrees with the items listed, please note them in a supplement to the SER.

If your staff requires any additional information, please do not hesitate to contact me.

Sincerely, t

. (s.

J. A. Bailey Project Licensing Manager JAB /sm xc:

D. O. Foster G. Bockhold, Jr R. A. Thomas T. Johnson (w/o att.)

J. E. Joiner, Esquire D. C. Teper (w/o att.)

B. W. Churchill, Esquire L. Fowler M. A. Miller W. C._Ramsey B. Jones, Esquire (w/o att.)

L. T. Gucwa Vogtle Project File 0053V f

GDI e5,09130 M o I

E

E l

i

.e ATTACIDENT VEGP SER Corrections P3ge Paragraph Sentence Description of Change 1-3 5

1 Change fuel handling " buildings" to fuel handling " building" 1-5 4

3 Delete "the boron injection tank" 1-7 1

5 Change "that takes approximately 20 minutes" to "The capacity provides the operator at least 20 minutes before any operator action must be performed."

2-8 2

5 Delete " impulse lines" 2-20 last 4

Change " establish the seepage loss" to

" determine the seepage loss" 8-4 last 2

Change "will start" to "is designed to start" 9-46 2

all Delete paragraph (Information is covered by previous paragraph. The paragraph implies a separate Appendix R submittal) 9-50 9

1 Add "from the detection system to the suppression system" after "except for the circuits" 9-51 top 1

Change "4"-hour to "24"-hour.

Add "The fire alarm signaling system which transmits fire / trouble alarms to the control rooms has been provided with 24-hour battery backup as there is no access to the class 1E diesels." to end-of paragraph.

9-51 2

1 Change "as" to "is" and "did" to "do" 9-51 2

2 Change " located the detectors" to "will evaluate the detector locations" 9-58 6

2 Change "3"-hour to "2"-hour 9-54

-2

.2

' Change " control room cabinets and l

consoles" to " main control boara" 9-57 5

2 Change "ha t been provided" to "have been accomplished" i

_Page Paragraph' Sentence' Description of Change 15-2 1

1 Change'"3425" to "3411" (NSSS power including the RCPs is 3425) 15-2' 3

3 Add "non LOCA" between "For" and

" transients." (LOCA analysis used 3411' MWI per Table 15.6.5-1) 15-4 3'

1 Change "...startup times are..." to

"...startup times (125) are..." (See response to 440.83 for basis) 15-19 2

2 Change "38" to "15.3" 15-19 2

3 Change "18" to "15" 0118V i