Text

.

1 i

.' Docket No:

50-321 Mr. J. T. Beckham, Jr.

Vice President - Nuclear Generation JAN 211986 Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302

Dear Mr. Beckham:

Re:

Edwin I. Hatch Nuclear Plant, Unit 1 10 CFR 50.55a(g) requires that applicable ASME Code components of a boiling water-cooled nuclear power facility meet the requirements set forth in Section

~

XI of the ASME Boiler and Pressur~e Vessel Code.

Each facility is required to have an inspection program plan which is updated every ten years to meet the requirements of the latest approved applicable edition and addenda of Section XI.

By letter dated July.18,1985, Georgia Power Company (GPC) stated its intention to complete the examinations for the Hatch Unit 1 fi'rst 10 year inspection interval, basing the examinations on a program written to the 1980 Edition of the ASME Code Section XI with Addenda through Winter 1980.

The [[letter::05000321/LER-1984-025, :on 841215,linear through-wall Crack Approx 2 3/4 Inches Long Discovered in Weld 1T48-2CPI-18-P1D-6. Caused by Thermally Induced Stress.Crack Ground Out,Weld Repaired & Addl Welds Inspected|July 18, 1985 letter]] also requested relief for Hatch Unit 1 from certain of these Section XI Code requirements.

We responded by letter dated November 7, 1985 stating some of the relief requests were granted, some conditionally granted and others denied. We I

subsequently met with your staff on November 19, 1985 and discussed the i

requests that were denied and your plans for submitting additional information i

in support of these denied requests.

By letter dated November 27, 1985 you j

submitted this additional information. We have reviewed this information, and j

as indicated in the enclosed Safety Evaluation which includes the details of this review, we have concluded relief from examining supports of ASME Class 1 lines, 2-inch nominal pipe diameter and less_and of ASME Class 2 and 3 lines, 4-inch nominal pipe diameter and less during the completion of the Hatch Unit 1 first 10 year inspection interval should be granted.

1

)

4 1

I i

1 l

l fDR6012gogg7 860121 o

ADOCK 05000321 i

PDR

Mr. J. T. Beckham, Jr. -

t We have determined pursuant to 10 CFR Part 50.55a(g)(6)(i), that the granting of this relief is authorized by law and will not endanger life or property or l

the common defense and security and is otherwise in the public interest.

In making this determination, we have given due consideration to the burden that could result if these requirements were imposed on your facility.

Sincerely, C.

.::! G ud by L;as..ul ;?. i!.u;Q Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page l

DISTRIBUTION:

.Destet. [He;;i EJordan NRC PDR BGrimes Local POR JPartlow PD#2 R/F GRivenbark DMuller SNorris OELD ACRS (10)

PD plant-specific d

i 0FFICIAL RECORD COP"

)

fd i

DB PD#2 DBLfRD#2 OELD DE

D 1

SN ris GRivenbark (1 LLi.A D14 le 1/f/86 1/,,' /86 1////86 1/

86 f

4 Mr. J. T. Beckham, Jr.

Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 cc:

G. F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge i

1800 M Street, N.W.

Washington, D.C.

20036 Mr. L. T. Gutwa Engineering Department.

Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. 4. C. Nix, Jr., General Manager Edwin I. Hatch huclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 2625 4

Birmingham, Alabama 35202 Resident Inspector i

U.S. Nuclear Regulatory Commission Route 1, P. O. Box 279 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, Suite 3100 Atlanta, Georiga 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 i

Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.

l Atlanta, Georgia 30334 i

Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 l

l

. -,