Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137Q085 + (03:29:13, 12 December 2024)
- IR 05000334/1985028 + (03:29:14, 12 December 2024)
- ML20137Q082 + (03:29:14, 12 December 2024)
- 2CAN098504, Application for Amend to License NPF-6,deleting Requirements Re Core Protection Calculator Types I & II Constants from Tech Specs.Fee Paid + (03:29:16, 12 December 2024)
- ML20137Q077 + (03:29:16, 12 December 2024)
- ML20137Q068 + (03:29:18, 12 December 2024)
- ML20137Q066 + (03:29:18, 12 December 2024)
- IR 05000461/1985054 + (03:29:21, 12 December 2024)
- ML20137Q059 + (03:29:22, 12 December 2024)
- ML20137Q061 + (03:29:22, 12 December 2024)
- ML20137Q058 + (03:29:23, 12 December 2024)
- ML20137Q057 + (03:29:24, 12 December 2024)
- ML20137Q055 + (03:29:24, 12 December 2024)
- IR 05000443/1985033 + (03:29:25, 12 December 2024)
- A04858, Requests Exemption from Schedular Requirements of 10CFR50.71 Re FSAR Updates,Due to Significant Burden on Engineering Resources.Fsar Update Efforts Listed.Fee Paid + (03:29:26, 12 December 2024)
- B11880, Forwards Info Requested in 851112 Telcon Re Engineering Assurance Audit Items.Package Includes Updated Corrective Action Status Rept,Fsar Changes & Project Change Notice on Leakage Detection + (03:29:26, 12 December 2024)
- ML20137Q050 + (03:29:27, 12 December 2024)
- ML20137Q047 + (03:29:28, 12 December 2024)
- ST-HL-AE-1584, Final Deficiency Rept Re Design of Guide Shoe Attachments for Insulated Small Bore Piping Supports.Initially Reported on 851021.Field Installation Tolerances Revised.Item Not Reportable Per 10CFR50.55(e) + (03:29:28, 12 December 2024)
- ML20137Q046 + (03:29:29, 12 December 2024)
- ML20137Q041 + (03:29:30, 12 December 2024)
- ML20137Q040 + (03:29:30, 12 December 2024)
- ML20137Q036 + (03:29:31, 12 December 2024)
- ML20137Q037 + (03:29:31, 12 December 2024)
- ML20137Q034 + (03:29:32, 12 December 2024)
- ML20137Q032 + (03:29:33, 12 December 2024)
- ML20137Q029 + (03:29:34, 12 December 2024)
- ML20137Q027 + (03:29:34, 12 December 2024)
- ML20137Q026 + (03:29:35, 12 December 2024)
- ML20137Q025 + (03:29:35, 12 December 2024)
- ML20137Q024 + (03:29:36, 12 December 2024)
- 05000458/LER-1985-060, :on 851224,reactor Scrammed on Low Vessel Level 3 When Running Feedwater Pump Tripped & Discharge Valve on Standby Pump Failed to Open.Caused by Pump Bearing Failure & Incorrect Torque Switch Setting in Valve + (03:29:38, 12 December 2024)
- ML20137Q019 + (03:29:39, 12 December 2024)
- ML20137Q014 + (03:29:40, 12 December 2024)
- ML20137Q015 + (03:29:40, 12 December 2024)
- 05000267/LER-1985-030, :on 851226,helium Circulator a Tripped on Low buffer-mid-buffer Differential Pressure.Caused by Failure of Dryer Discharge Valve HV-21601 to Open Upon Actuation.Valve Manually Unseated & Operator Will Be Cleaned + (03:29:42, 12 December 2024)
- ML20137Q012 + (03:29:43, 12 December 2024)
- ML20137Q009 + (03:29:44, 12 December 2024)
- ML20137Q010 + (03:29:44, 12 December 2024)
- IR 05000298/1996027 + (03:29:45, 12 December 2024)
- 05000389/LER-1985-010-03, :on 851226,individual Control Element Assembly Declared Inoperable Causing Reactor Shutdown.Caused by Failure of Upper Gripper Coil.Coil Installed & Operators Counseled + (03:29:47, 12 December 2024)
- ML20137Q002 + (03:29:48, 12 December 2024)
- IR 05000458/1996017 + (03:29:49, 12 December 2024)
- 05000528/LER-1985-097, :on 851229,spurious Initiation of Automatic ESF Actuations Occurred.Caused by Component Failure on Computer Card Installed in Radiation Monitor.Defective Computer Card Replaced + (03:29:51, 12 December 2024)
- ML20137P993 + (03:29:52, 12 December 2024)
- 05000289/LER-1986-002, :on 860104,anticipatory Reactor Trip from Turbine Trip Occurred During Power Escalation.Caused by High Moisture Separator Level.Failed Controller Replaced & Power Escalation Recommenced + (03:29:54, 12 December 2024)
- 05000219/LER-1985-023, :on 851211 Re Emergency Svc Water Sys Seismic Concerns.Caused by Original Design Error.Procedures Used to Determine Pump Operability Revised to Change Min Acceptable Flow Rate & Engineering Evaluation Performed + (03:29:56, 12 December 2024)
- 05000250/LER-1985-044, :on 851230,turbine Runback Occurred.Caused by Failure of Primary Detector Coil in Rod Position Indicator for N-9.Applicable Plant Procedures Used to Verify N-9 Still Withdrawn at 228 Steps + (03:29:58, 12 December 2024)
- ML20137P982 + (03:29:59, 12 December 2024)
- ML20137P973 + (03:30:04, 12 December 2024)
- ML20137P970 + (03:30:05, 12 December 2024)
- 05000325/LER-1985-068, :on 851230,2 H Time Frame for Surveillance Testing of Reactor Level Instrument B21-LT-N024A-1 Exceeded & Instrument Not Placed in Tripped Condition.Caused by Technician Error.Technicians Counseled + (03:30:07, 12 December 2024)