Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000373/1996011 + (03:25:32, 12 December 2024)
- ML20137Q548 + (03:25:34, 12 December 2024)
- ML20137Q546 + (03:25:35, 12 December 2024)
- ML20137Q545 + (03:25:36, 12 December 2024)
- 05000265/LER-1986-001, :on 860103,at 97% Power,Group I Isolation & Subsequent Reactor Scram Occurred.Caused by Air Hose Breaking Loose & Striking Instrument Rack Due to Failure of Hose Connection + (03:25:38, 12 December 2024)
- IR 05000413/1985047 + (03:25:40, 12 December 2024)
- ML20137Q538 + (03:25:41, 12 December 2024)
- ML20137Q536 + (03:25:42, 12 December 2024)
- 05000247/LER-1985-014, :on 851024,reactor Tripped Due to High Steam Generator Level.Caused by Operator Error,Including Inadequate Training & Operator inexperience.Long- & short-term Actions Planned + (03:25:44, 12 December 2024)
- ML20137Q533 + (03:25:45, 12 December 2024)
- ML20137Q531 + (03:25:45, 12 December 2024)
- 05000352/LER-1985-072, :on 850907,RWCU Sys Isolated Due to Outlet Vent Valve Failure.Caused by Rupture of Flow Glass Seals.Resin Discharged from Pressure Relief Valve.Startup Procedure S45.8.A Revised + (03:25:47, 12 December 2024)
- ML20137Q529 + (03:25:48, 12 December 2024)
- ML20137Q525 + (03:25:49, 12 December 2024)
- ML20137Q526 + (03:25:49, 12 December 2024)
- ML20137Q523 + (03:25:50, 12 December 2024)
- PY-CEI-NRR-0409, Forwards Application for Amend to CPPR-148,extending Const Completion Date to 860131 + (03:25:51, 12 December 2024)
- NUREG-0278, Forwards Documents Comprising Regulatory History of Rev to 10CFR35 (SECY-84-485),published for Comment on 850726 + (03:25:51, 12 December 2024)
- 05000458/LER-1985-020, :on 851028,Div I RWCU Isolation Occurred W/Plant in Operational Condition 4 (Cold Shutdown) & Prior to Initial Criticality.Caused by Blown Fuse + (03:25:53, 12 December 2024)
- IR 05000272/1985024 + (03:25:54, 12 December 2024)
- ML20137Q506 + (03:25:55, 12 December 2024)
- ML20137Q505 + (03:25:56, 12 December 2024)
- ML20137Q504 + (03:25:56, 12 December 2024)
- ML20137Q502 + (03:26:03, 12 December 2024)
- ML20137Q498 + (03:26:04, 12 December 2024)
- ML20137Q497 + (03:26:05, 12 December 2024)
- ML20137Q484 + (03:26:06, 12 December 2024)
- ML20137Q486 + (03:26:06, 12 December 2024)
- ML20137Q476 + (03:26:07, 12 December 2024)
- ML20137Q475 + (03:26:08, 12 December 2024)
- ML20137Q471 + (03:26:09, 12 December 2024)
- ML20137Q467 + (03:26:09, 12 December 2024)
- PY-CEI-NRR-0340, Forwards Rev 1 to Procedures Generation Package, Per SER Outstanding Issue 21 Re Development of Emergency Operation Procedures.Info Should Enable Closure of Outstanding Issue 21 in Next Sser + (03:26:10, 12 December 2024)
- B16349, Forwards Addendum 1 to Rev 9 to FSAR for Millstone Nuclear Power Station,Unit 3, Replacing Pages as Required + (03:26:11, 12 December 2024)
- IR 05000445/1985003 + (03:26:18, 12 December 2024)
- ML20137Q456 + (03:26:18, 12 December 2024)
- U-600249, Requests OL Be Granted for Term of 40 Yrs from Date of Issuance.Safety Margins Established W/Understanding of Limitations Imposed by 40 Yr Design Life.No Significant Adverse Environ Impact Associated W/Time Extension Noted + (03:26:20, 12 December 2024)
- ML20137Q440 + (03:26:21, 12 December 2024)
- ML20137Q432 + (03:26:22, 12 December 2024)
- ML20137Q427 + (03:26:23, 12 December 2024)
- 05000313/LER-1985-007-01, :on 850811,reactor Trip Occurred When High Thrust Bearing Wear Indication Caused Main Feedwater Pump (P-1B) Trip.Pumps Modified to Include Metering Valves to Mitigate Spurious Indications + (03:26:25, 12 December 2024)
- ST-HL-AE-1337, Responds to NRC Re Violations Noted in Insp Repts 50-498/85-01 & 50-499/85-01.Corrective Actions:Records Added to File W/Missing Documentation & Record W/Improperly Located Signature Corrected,Per Startup Training Form + (03:26:26, 12 December 2024)
- ML20137Q412 + (03:26:27, 12 December 2024)
- ML20137Q409 + (03:26:28, 12 December 2024)
- ML20137Q403 + (03:26:29, 12 December 2024)
- ML20137Q398 + (03:26:30, 12 December 2024)
- ML20137Q399 + (03:26:30, 12 December 2024)
- 05000293/LER-1978-002-01, /01X-1:on 780120,100-ft Shielding Mast Fell Across 345 Kv Yard Bus Works & Interrupted Power to Startup Transformer from Transmission Line 355.Caused by Cyclical Fatigue Cracking at Stress Points Due to Wind + (03:26:32, 12 December 2024)
- ML20137Q392 + (03:26:33, 12 December 2024)
- ML20137Q394 + (03:26:33, 12 December 2024)
- ML20137Q387 + (03:26:34, 12 December 2024)
- ML20137Q386 + (03:26:35, 12 December 2024)