Final Part 21 & Deficiency Rept NCR 3511 Re Lambda Power Supplies Installed in Bailey Controls Co Cabinet.Initially Reported on 841025.Deficiency Not Generic Condition Adverse to Quality
ML20137Q505
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 11/08/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-85, REF-PT21-85-482-000 NCR-3511, NRC-3511, PT21-85-482, PT21-85-482-000, NUDOCS 8512050286
Download: ML20137Q505 (2)


Text

.

e TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 hstnutStreetTowerII November 8, 1985 h

PLRD-50-438/84-53 BLRD-50-439/84-49 U.S. Nuclear Regulatory Commission Region II Attn:

Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - VARIOUS DEFICIENCIES INVOLVING LAMBDA POWER SUPPLIES - BLRD-50-438/84-53 AND BLRD-50-439/84 FINAL REPORT The subject deficiency was initially reported to NRC-OIE Inspector P. E. Fredrickson on October 25, 1984 in accordance w} th 10 CFR 50.55(e) as NCR 3511. Our interim reports were submitted on November 20, 1984 and February 27 and May 21, 1985. Enclosed is our final report. We consider 10 CFR Part 21 applicable to this deficiency.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY

. 4. L

. W. Hufham, Manager Licensing and Rick Protection Enclosure cc:

Mr. Jamen Taylor, Director (Enclosure)

Office of Inspection and 2nforcement U.S. Nuclear Regulatory Comnission Washington, D.C.

20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8512050286 851100 gDR ADDCK 05000438 PDR An Eqeal Opportunity Employer g

g

.e

. e ENCLOSURE BELLEFONTE NUCLEAR 'LANf~ UNITS 1 AND 2 VARIOUS DEFICIENCIES INVGL /INC LAMBDA POWER SUPPLIES BLRD-50-438/84-53, BLRD-50-439/84-49 NCR 3511 10 CFR 50.55(e)

FINAL REI:0RT Description of Deficiency Various deficiencies have been identified with the Lambda power supplies installed in Bailey Controls Company (BCCo) cabinets at Bellefonte Nuclear Plant (BLN). The BCCo cabinets were supplied to TVA by Babcock and Wilcox (B&W) of Lynchburg, Virginia, on the NSSS contract for BLN.

The Lambda power supplies are components of the reactor protection system (RPS), engineered safety features actuation system (ESFAS), essential controls and instrumentation (ECI) system, and the non-nuclear instrumentation (NNI) system. The RPS, ESFAS, ECI, and NNI systems are primary safety-related systems which, among other essential functions, provide protection to the reactor core during a loss of coolant accident (LOCA), a steam line break, or a feedwater line break. The subject deficiencies involve missing components, loose connections, incorrectly sized capacitors, corroded transformers, and others. The root cause of the power supply failures can be summarized in the following categories:

(a) Storage related problems, due to storage of power supplies in high humidity and in an unenergized state, resulting in transformer corrosion and failed l

capacitors.

(b) Documentation related problems where components were apparently missing or improperly sized due to improper correlation of different revisions of the power supplies to different revisions of the instruction manual data, resulting in an apparent discrepancy between the component and the documentation.

(c) Manufacturing quality problems, due to insufficient quality controls, resulting in missing or improperly installed components.

i (d) Power supply electrical problems, due to high stress on the power supplies caused by re-energization after long periods of storage, and random component failures, resulting in improper regulation, excessive ripple, and improper output voltage.

L (e) Miscellaneous problems, primarily due to improper handling, resulting in component damage.

1

[

TVA has determined that this deficiency is not a generic condition adverse to j

quality (CAQ) for TVA. The Lambda power supplies are used only at BLN in the BCCo_ instrumentation systems.

l t

I t

4

,.-y._yv.

-._,,-.-__ef.-

,,--.m.s

-g.-

w.*_

9--.

r-y,

e Srfety Implic*tiens The subject deficiencies could have rendered an affected system inoperable or unable to perform a specific required safety function. The functicns of

- the affected system are necessary for protection of the plant and/or the i

mitigation of the consequences of some design basis accidents.

Therefore, these deficiencies could have adversely affected the safe operation of the plant.

Corrective Action TVA has returned the defective power supplies to the vendor for repair or replacement and to test them to ensure correctness and acceptability. TVA will reinstall the power supplies after they are returned from the vendor.

1 This corrective action will be completed for unit 1 and unit 2 by one year before fuel load of the applicable unit.

TVA has. coordinated the following action to prevent recurrence with the i

vendor:

(a) For storage-related problems, B&W will add procedures to the instruction manual requiring that power supplies be stored in an energized. state; and if de-energized for extended periods, power will be resupplied at reduced levels.

(b) For documentation related problems, B&W will add guidelines to the instruction manual to allow site personnel to identify the version of each power supply and relate it to the proper version of the instruction manual.

This addition will also include a standardized i

test procedure and specific acceptance criteria to ensure that a power 4

i supply is not mistakenly identified as defective.

4 (c) For manufacturing quality problems, BCCo will improve its internal procedures for handling Lambda power supplies, including inspection of all power supplies before return shipment, testing of power supplies

-in accordance with the new test procedure, and improving the method of control and inspection of returned power supplies.

i (d) For power supply electrical problems B&W will add procedures to the i

instruction manual providing power supply startup guidance (i.e.,

resupply power at reduced levels if power supplies have been l

de-energized for an extended period).

(e) For miscellaneous problems, BCCo will implement additional inspections of the power supplies in the shop to preclude broken j

components.

This action to prevent recurrence is scheduled to be complete by.

July 1, 1986.

t

.