Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137S454 + (03:04:03, 12 December 2024)
- ML20137S450 + (03:04:04, 12 December 2024)
- B11885, Discusses Cycle 13 Coastdown,Specifically,Turbine Overspeed Protection Sys Surveillance.Addl Stroke Testing of Turbine Stop & Control Valves in Coastdown Operation Presently Unwarranted.Sep Topic III-4.B Discussed + (03:04:05, 12 December 2024)
- ML20137S448 + (03:04:06, 12 December 2024)
- ML20137S446 + (03:04:07, 12 December 2024)
- ML20137S445 + (03:04:07, 12 December 2024)
- ML20137S444 + (03:04:08, 12 December 2024)
- ML20137S443 + (03:04:09, 12 December 2024)
- ML20137S441 + (03:04:10, 12 December 2024)
- ML20137S440 + (03:04:11, 12 December 2024)
- B11896, Forwards Change to FSAR Table 3.9B-10,clarifying Stress Allowable to Be Used W/Asme Equation 9 for Emergency Condition,Per 851121 Telcon + (03:04:12, 12 December 2024)
- ML20137S438 + (03:04:13, 12 December 2024)
- ML20137S436 + (03:04:13, 12 December 2024)
- ML20137S435 + (03:04:14, 12 December 2024)
- ML20137S433 + (03:04:15, 12 December 2024)
- A04582, Clarifies Commitment in 850225 Response to Insp Rept 50-213/84-26.All Components Listed in Mepl Will Have Production Maint Mgt Sys QA Indicators Verified as Properly Reflecting QA Status + (03:04:15, 12 December 2024)
- ML20137S431 + (03:04:16, 12 December 2024)
- ML20137S430 + (03:04:17, 12 December 2024)
- ML20137S427 + (03:04:18, 12 December 2024)
- ML20137S424 + (03:04:19, 12 December 2024)
- ML20137S425 + (03:04:19, 12 December 2024)
- ML20137S423 + (03:04:20, 12 December 2024)
- ML20137S420 + (03:04:21, 12 December 2024)
- ML20137S417 + (03:04:22, 12 December 2024)
- ML20137S416 + (03:04:22, 12 December 2024)
- ML20137S414 + (03:04:23, 12 December 2024)
- ML20137S412 + (03:04:24, 12 December 2024)
- ML20137S411 + (03:04:25, 12 December 2024)
- ML20137S408 + (03:04:26, 12 December 2024)
- IR 05000322/1985040 + (03:04:26, 12 December 2024)
- ML20137S404 + (03:04:27, 12 December 2024)
- ML20137S403 + (03:04:28, 12 December 2024)
- PY-CEI-NRR-2154, Forwards Rev 23 to PNPP Security Plan IAW 10CFR50.54(p)(2). Encl Withheld + (03:04:29, 12 December 2024)
- ML20137S399 + (03:04:32, 12 December 2024)
- ML20137S397 + (03:04:33, 12 December 2024)
- ML20137S396 + (03:04:34, 12 December 2024)
- ML20137S394 + (03:04:34, 12 December 2024)
- ML20137S387 + (03:04:37, 12 December 2024)
- ML20137S391 + (03:04:37, 12 December 2024)
- ML20137S386 + (03:04:38, 12 December 2024)
- ML20137S383 + (03:04:39, 12 December 2024)
- ML20137S381 + (03:04:40, 12 December 2024)
- ML20137S379 + (03:04:41, 12 December 2024)
- ML20137S380 + (03:04:41, 12 December 2024)
- B11884, Forwards Revised Response to SER Confirmatory Item 58 Re Emergency Engine Fuel Oil Storage & Transfer Sys.Encl Revised Table 8.3-1 Provides Listing of Loads to Be Shed or Placed Onto Bus + (03:04:42, 12 December 2024)
- ML20137S373 + (03:04:43, 12 December 2024)
- ML20137S372 + (03:04:44, 12 December 2024)
- ML20137S370 + (03:04:45, 12 December 2024)
- ML20137S369 + (03:04:46, 12 December 2024)
- B11888, Responds to 851118 Request for Addl Info Re Generic Ltr 85-12 Concerning Reactor Coolant Pump Trip Criterion for non-LOCA Events.Using Trip Criterion,Reactor Coolant Pumps Would Not Be Tripped in non-LOCA Events + (03:04:47, 12 December 2024)
- ML20137S366 + (03:04:47, 12 December 2024)