ML20137S396

From kanterella
Jump to navigation Jump to search
Forwards Revised NRC Form 398 Requiring All Info to Be Completed in Total W/Each new,renewal,upgrade,multi-unit & Reapplication Operator License Submittal.W/O Encls
ML20137S396
Person / Time
Site: University of Wisconsin
Issue date: 02/11/1986
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Cashwell R
WISCONSIN, UNIV. OF, MADISON, WI
References
NUDOCS 8602180037
Download: ML20137S396 (2)


Text

,

'i i

FEB 11 m Docket No. 50-156 University of Wisconsin ATTN: Mr. R. J. Cashwell Reactor Director Nuclear Engineering Department Madison, WI 53705 Gentlemen:

Enclosed is a copy of the revised NRC Form 398. This revised form requires that all information be completed in total with each new, renewal, upgrade, multi-unit, and reapplication license submittal. Applicants requesting a renewal and reapplication will also need to indicate the additional training received since the last application under Item 15. Please note that the training section will no longer be cumulative. Other changes are detailed in.. Enclosure 3 is a set of instructions for the completion of all items on the NRC Form 398.

Please ensure that all applications for licenses received after April 1,1986, are submitted on this revised form. On that date, the NRC Operator Licensing Tracking System will be modified to reflect these changes, and submittals using the previous form will not be accepted.

Additional copies of the form can be obtained from Vivian Miller, U. S. Nuclear Regulatory Commission, Document Management Branch, Mail Stop W-548. Washington, DC 20555.

A meeting will be held with all Region III licensees in late March or early April to discuss this and other operator licensing matters.

You will be notified of the details of this meeting at a later date.

If you have any questions regarding these changes, please call our office.

ORIGINAL SIGNED BY LUIS A. REYES Luis A. Reyes, Chief Operations Branch

Enclosures:

As stated See Attached Distribution 8602180037 860211 PDR ADOCK 05000156 V

PDR RIII RIII RII b

Q:{iili e[,n

- ' e es orthy/mab g

p g 02/11/86

) ll 9 6 96#

' g. _

b.

4 LUniversity of-Wisconsin 2~

pgg 11. py, Distribution:--

-cc w/ enclosures:

S. Matusewic, Reactor Supervisor cc w/o enclosures:

.DCS/RSB (RIDS)

Licensing Fee Management Branch LJohn J. Duffy, Chief-Boiler Section-Ness Flores, Chairperson Wisconsin Public. Service Commission l

~

l

., _ _, _ _ _ ~.. _ _ _. _.. _ _,.., _.,. _ _ _ _ _. _ _ _,. -.

.