ML20137S411
| ML20137S411 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/04/1997 |
| From: | Mccollum W DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20137S418 | List: |
| References | |
| NUDOCS 9704150124 | |
| Download: ML20137S411 (1) | |
Text
-.. -. - -..
- - ~ ~ -
s p
l i
DukeIbwer Company WworR %Cw11.Jo i
Catau ba Nuclear Generation Department l'xe1%i&rtt i
ISM ConcordRoad (801)S3132% Office
. Yod, SC29M (MI)83/4126 Fax DUKEPOWER April 4, 1997 I
i U.S. Nuclear Regulatory Commission ATTENTION:
Document Control Desk Washington, D.C.
20555 i
Subject:
Catawba Nuclear Station Unit 2 Docket No.: 50-414 Core Operating Limits Report (COLR)
- Attached, pursuant to Catawba Technical Specification 6.9.1.9, is.an information copy of a revision to the Core i
Operating Limits Report for Catawba Unio 2 Cycle 8.
This I
revision is being provided to update the maximum allowable boron concentrations in the Refueling Water ' Storage Tank j
(RWST) and Cold Leg Accumulators (CLA) for LCOs 3.1.2.5 and 3.1.2.6.
The new maximum boron concentration is 3075 ppm.
Please direct any questions or' concerns to Martha Purser at (803) 831-4015.
i Sincerely,
\\
W. R. McCollum,,J.
\\
b Xc w/
Attachment:
L. A. Reyes, Regional Administrator, Region II P.S. Tam, Senior Project Manager, ONRR R.
J.
Freudenberger, Senior Resident Inspector, CNS O==.
9704150124 970404 f
PDR-ADOCK 05000414
@,Nhh%%,E,EE
.,