ML20137S411

From kanterella
Jump to navigation Jump to search
Forwards Info Copy of Rev to COLR for Catawba Unit 2 Cycle 8
ML20137S411
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 04/04/1997
From: Mccollum W
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137S418 List:
References
NUDOCS 9704150124
Download: ML20137S411 (1)


Text

-.. -. - -..

- - ~ ~ -

s p

l i

DukeIbwer Company WworR %Cw11.Jo i

Catau ba Nuclear Generation Department l'xe1%i&rtt i

ISM ConcordRoad (801)S3132% Office

. Yod, SC29M (MI)83/4126 Fax DUKEPOWER April 4, 1997 I

i U.S. Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, D.C.

20555 i

Subject:

Catawba Nuclear Station Unit 2 Docket No.: 50-414 Core Operating Limits Report (COLR)

Attached, pursuant to Catawba Technical Specification 6.9.1.9, is.an information copy of a revision to the Core i

Operating Limits Report for Catawba Unio 2 Cycle 8.

This I

revision is being provided to update the maximum allowable boron concentrations in the Refueling Water ' Storage Tank j

(RWST) and Cold Leg Accumulators (CLA) for LCOs 3.1.2.5 and 3.1.2.6.

The new maximum boron concentration is 3075 ppm.

Please direct any questions or' concerns to Martha Purser at (803) 831-4015.

i Sincerely,

\\

W. R. McCollum,,J.

\\

b Xc w/

Attachment:

L. A. Reyes, Regional Administrator, Region II P.S. Tam, Senior Project Manager, ONRR R.

J.

Freudenberger, Senior Resident Inspector, CNS O==.

9704150124 970404 f

PDR-ADOCK 05000414

@,Nhh%%,E,EE

.,