Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137S685 + (03:01:45, 12 December 2024)
- 05000285/LER-1985-005, :on 850823,during Containment Pressure Reduction,Ventilation Isolation Actuation Sys Actuated. Caused by Technician Error in Repositioning Low/High Setpoint Selector Switch.Personnel Counseled + (03:01:48, 12 December 2024)
- ML20137S679 + (03:01:49, 12 December 2024)
- ML20137S675 + (03:01:50, 12 December 2024)
- ML20137S674 + (03:01:51, 12 December 2024)
- ML20137S672 + (03:01:51, 12 December 2024)
- ML20137S669 + (03:01:52, 12 December 2024)
- A04826, Submits Supplementary Response to Generic Ltr 83-28,Item 4.5.3,per 850417 Request.Response Based on C-E Owners Group Evaluation of Recommended Reactor Trip Sys Test Intervals for C-E Plants,Published in CE NPSD-277, Reactor.. + (03:01:53, 12 December 2024)
- ML20137S667 + (03:01:53, 12 December 2024)
- ML20137S664 + (03:01:54, 12 December 2024)
- ML20137S659 + (03:02:00, 12 December 2024)
- A05377, Reaffirms Certification of Changes to Final Draft Tech Specs,Including Additions to Meteorological Monitoring Instrumentation Tables 3.3-8 & 4.3-5 & Snubber Surveillance Functional Test Requirement + (03:02:01, 12 December 2024)
- 05000327/LER-1997-003-02, :on 970305,failed to Properly Perform Surveillance Testing on Centrifugal Charging Pump Inlet Isolation Valve Logic.Caused by Inadequate Surveillance Instruction.Prepared Special Test Procedure + (03:02:03, 12 December 2024)
- ML20137S653 + (03:02:04, 12 December 2024)
- ML20137S652 + (03:02:05, 12 December 2024)
- 05000327/LER-1985-033-01, :on 850827,during Weekly Train B Chlorine Detector Function Testing,Esf Actuation Occurred for Main Control Room Isolation.Caused by Personnel Error.Personnel Counseled + (03:02:07, 12 December 2024)
- BVY-97-042, Monthly Operating Rept for Mar 1997 for Vermont Yankee Nuclear Power Station + (03:02:08, 12 December 2024)
- ML20137S641 + (03:02:10, 12 December 2024)
- ML20137S644 + (03:02:10, 12 December 2024)
- ML20137S639 + (03:02:13, 12 December 2024)
- ML20137S640 + (03:02:13, 12 December 2024)
- 05000323/LER-1985-006-01, :on 850824,during Startup,Random Failure of Rod Drive Motor Generator Set Relays Resulted in Rod Insertion & Manual Reactor Trip.Caused by Burned Out Coil on Auxiliary Relay & Relay Drift.Relays Replaced + (03:02:18, 12 December 2024)
- ML20137S635 + (03:02:19, 12 December 2024)
- ML20137S631 + (03:02:26, 12 December 2024)
- ML20137S628 + (03:02:27, 12 December 2024)
- IR 05000395/1986001 + (03:02:29, 12 December 2024)
- ML20137S624 + (03:02:32, 12 December 2024)
- ML20137S623 + (03:02:32, 12 December 2024)
- ML20137S622 + (03:02:33, 12 December 2024)
- NSD-NRC-97-5031, Forwards Formal Transmittal of mark-up SSAR Sections Open Items & Draft Responses to NRC Questions Previously Submitted Informerly + (03:02:34, 12 December 2024)
- ML20137S618 + (03:02:34, 12 December 2024)
- ML20137S611 + (03:02:40, 12 December 2024)
- ML20137S610 + (03:02:40, 12 December 2024)
- ML20137S609 + (03:02:41, 12 December 2024)
- B11766, Submits Isap Topic 1.11, Post-Accident Hydrogen Monitor Per 850517 Commitment.Installation of Redundant Containment Hydrogen Monitor Unnecessary.Addl Info Will Be Provided by 860131 + (03:02:42, 12 December 2024)
- ML20137S605 + (03:02:43, 12 December 2024)
- ML20137S601 + (03:02:46, 12 December 2024)
- ML20137S599 + (03:02:47, 12 December 2024)
- ML20137S597 + (03:02:48, 12 December 2024)
- ML20137S593 + (03:02:49, 12 December 2024)
- ML20137S591 + (03:02:50, 12 December 2024)
- ML20137S589 + (03:02:51, 12 December 2024)
- ML20137S587 + (03:02:51, 12 December 2024)
- ML20137S586 + (03:02:52, 12 December 2024)
- ML20137S585 + (03:02:53, 12 December 2024)
- ML20137S584 + (03:02:53, 12 December 2024)
- ML20137S582 + (03:02:54, 12 December 2024)
- ML20137S583 + (03:02:54, 12 December 2024)
- BSEP-86-0103, Special Rept 2-SR-86-001:on 860113,7-day Time Frame for Fire Barrier Limiting Condition for Operation Exceeded for Fire Door in Common Emergency Ac Diesel Generator Bldg.Hole in Door Repaired.Part 21 Related + (03:02:55, 12 December 2024)
- ML20137S578 + (03:02:56, 12 December 2024)
- U-600339, Forwards 21 Pump & Valve Operability Assurance Review Checklists for Listed Component Packages at Time of Reaudit + (03:02:56, 12 December 2024)
- ML20137S574 + (03:02:57, 12 December 2024)