Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137W170 + (01:53:20, 12 December 2024)
- ML20137W173 + (01:53:20, 12 December 2024)
- PNO-III-85-095B, during Insp of Emergency Diesel Generator 11,degradation of Six Upper Crankshaft Bearings Noted.Cause Undetermined.Findings & Relation of Findings to Other Diesel Generators Being Evaluated + (01:53:21, 12 December 2024)
- PNO-IV-85-049, on 850928,cooldown Commenced to Replace Seal on Reactor Coolant Pump C.Seal Cartridge Developed Crack Where Middle Cavity Seal Pressure Sensing Line Joins Cartridge.Startup Scheduled for 851003 + (01:53:22, 12 December 2024)
- ML20137W166 + (01:53:22, 12 December 2024)
- ML20137W164 + (01:53:23, 12 December 2024)
- ML20137W161 + (01:53:26, 12 December 2024)
- ML20137W160 + (01:53:26, 12 December 2024)
- ML20137W157 + (01:53:27, 12 December 2024)
- ML20137W154 + (01:53:28, 12 December 2024)
- ML20137W153 + (01:53:28, 12 December 2024)
- 05000443/LER-1996-007, :on 961206,EFS Flow Delivery Delays Were Noted. Caused Because Requirements of W Accident Analyses Were Not Met.Operability Determination Was Completed & Accident Analyses Were Revised + (01:53:30, 12 December 2024)
- HL-5309, Forwards Rev 15A to Ei Hatch Nuclear Plant Units 1 & 2 FSAR & Rev 12A to Ei Hatch Nuclear Plant Units 1 & 2 Fire Hazards Analysis & Fire Protection Program + (01:53:32, 12 December 2024)
- ML20137W145 + (01:53:32, 12 December 2024)
- ML20137W140 + (01:53:33, 12 December 2024)
- ML20137W139 + (01:53:34, 12 December 2024)
- ML20137W137 + (01:53:34, 12 December 2024)
- ML20137W133 + (01:53:35, 12 December 2024)
- ML20137W130 + (01:53:36, 12 December 2024)
- ML20137W127 + (01:53:37, 12 December 2024)
- ML20137W126 + (01:53:37, 12 December 2024)
- ML20137W125 + (01:53:38, 12 December 2024)
- ML20137W121 + (01:53:38, 12 December 2024)
- PY-CEI-NRR-0412, Forwards App R Deviation Request,Representing Modified Plant Configuration Since Submittal of 850612 Deviations Package. Rev to Index Table of Deviations Also Encl + (01:53:39, 12 December 2024)
- ML20137W114 + (01:53:40, 12 December 2024)
- ML20137W112 + (01:53:41, 12 December 2024)
- IR 05000461/1985049 + (01:53:42, 12 December 2024)
- ML20137W109 + (01:53:43, 12 December 2024)
- 05000259/LER-1985-054, Advises That LER 85-054-00 Cancelled + (01:53:44, 12 December 2024)
- ML20137W101 + (01:53:45, 12 December 2024)
- ML20137W097 + (01:53:46, 12 December 2024)
- ML20137W098 + (01:53:46, 12 December 2024)
- 05000387/LER-1986-001, :on 860110,two Divs of Control Room Emergency Outside Air Supply Sys Declared Inoperable Resulting in Four Dampers Not Being Tested.Caused by Procedure Deficiency. Dampers Tested.Procedures Will Be Reviewed + (01:53:48, 12 December 2024)
- ML20137W092 + (01:53:49, 12 December 2024)
- LD-85-166, Notifies of Continuation of Spent Fuel Shipments from West Valley Nuclear Svcs to Re Ginna.Schedule Withheld + (01:53:50, 12 December 2024)
- ML20137W089 + (01:53:51, 12 December 2024)
- ML20137W086 + (01:53:52, 12 December 2024)
- ML20137W079 + (01:53:53, 12 December 2024)
- ML20137W080 + (01:53:53, 12 December 2024)
- ML20137W077 + (01:53:54, 12 December 2024)
- ML20137W075 + (01:53:55, 12 December 2024)
- ML20137W073 + (01:53:56, 12 December 2024)
- AECM-85-0351, Forwards FY87-89 Schedules for Operator Licensing Exams & Requalification Exams,In Response to 850927 Generic Ltr 85-18 + (01:53:57, 12 December 2024)
- ML20137W069 + (01:53:57, 12 December 2024)
- ML20137W065 + (01:53:58, 12 December 2024)
- ML20137W062 + (01:53:59, 12 December 2024)
- ML20137W058 + (01:53:59, 12 December 2024)
- IR 05000409/1985020 + (01:54:00, 12 December 2024)
- ML20137W055 + (01:54:01, 12 December 2024)
- ML20137W054 + (01:54:02, 12 December 2024)
- ML20137W053 + (01:54:03, 12 December 2024)