Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RC-97-0087, Submits 30-day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations, as It Applies to VC Summer Nuclear Station + (00:26:18, 12 December 2024)
- ML20138G124 + (00:26:19, 12 December 2024)
- ML20138G123 + (00:26:20, 12 December 2024)
- ML20138G120 + (00:26:20, 12 December 2024)
- ML20138G117 + (00:26:21, 12 December 2024)
- ML20138G116 + (00:26:21, 12 December 2024)
- ML20138G110 + (00:26:22, 12 December 2024)
- BSEP-97-0168, Application for Amends to Licenses DPR-71 & DPR-62,revising Surveillance Requirements to Require Testing of Control Room Emergency Ventilation Sys Charcoal & Revising Acceptance Criteria for Subject Charcoal Testing + (00:26:23, 12 December 2024)
- B16446, Submits Change to Commitment Made in Response to 970404 NOV Re Insp Repts 50-245/96-09,50-336/96-09 & 50-423/96-09 + (00:26:23, 12 December 2024)
- IR 05000259/1991012 + (00:26:25, 12 December 2024)
- ML20138G103 + (00:26:25, 12 December 2024)
- ML20138G101 + (00:26:26, 12 December 2024)
- ML20138G100 + (00:26:27, 12 December 2024)
- ML20138G097 + (00:26:27, 12 December 2024)
- ML20138G096 + (00:26:28, 12 December 2024)
- ML20138G095 + (00:26:29, 12 December 2024)
- ML20138G093 + (00:26:29, 12 December 2024)
- ULNRC-03570, Forwards Rev 3 to Callaway Cycle 9 COLR, Which Has Been Updated W/Addl W(Z) Surveillance Factors to Cover Wider Range of Measured Axial Offset Values,Per TS 6.9.1.9 + (00:26:30, 12 December 2024)
- ML20138G090 + (00:26:30, 12 December 2024)
- PNO-IV-97-024A, on 970502,licensee Initiated Recovery of New Fuel Assembly That Had Been Dropped on 970428.Licensee Recommenced Refueling Reactor on 970504.Reconstitution Process Expected to Take 7 to 10 Days + (00:26:31, 12 December 2024)
- ML20138G083 + (00:26:32, 12 December 2024)
- ML20138G080 + (00:26:33, 12 December 2024)
- ML20138G082 + (00:26:33, 12 December 2024)
- ML20138G078 + (00:26:34, 12 December 2024)
- IR 05000259/1991002 + (00:28:59, 12 December 2024)
- RBG-22402, Forwards Updated Table Reflecting Environ Qualification Summary Listing of Justifications for Interim Operation. Rev 4 to Srn 247433-1, Flow Detecting Elements by Fluid Components,Inc, Complete + (00:29:00, 12 December 2024)
- ML20138G069 + (00:29:01, 12 December 2024)
- ST-HL-AE-1443, Forwards Response to Draft SER or FSAR Item D 0.0-8 Re Methodology Used to Establish Tech Spec Trip Setpoints & Allowable Values + (00:29:02, 12 December 2024)
- ML20138G068 + (00:29:02, 12 December 2024)
- ML20138G065 + (00:29:03, 12 December 2024)
- ML20138G060 + (00:29:04, 12 December 2024)
- ML20138G063 + (00:29:04, 12 December 2024)
- 0CAN049703, Forwards Annual Radiological Environ Operating Rept for 1996. All Radionuclides Detected by Radiological Environ Monitoring Program During 1996 Were Significantly Below Regulatory Limits + (00:29:05, 12 December 2024)
- ML20138G057 + (00:29:05, 12 December 2024)
- PNO-IV-97-025, on 970502,excessive Dose Rates on Incoming Package Containing I-131 Capsule Occurred.Initial Surveys of Package,Performed in Accordance W/Hosp Procedures,Revealed Surface Dose Rate of Greater than 10 M/H + (00:29:06, 12 December 2024)
- ML20138G053 + (00:29:07, 12 December 2024)
- ML20138G047 + (00:29:08, 12 December 2024)
- ML20138G046 + (00:29:08, 12 December 2024)
- ML20138G043 + (00:29:09, 12 December 2024)
- ML20138G039 + (00:29:10, 12 December 2024)
- ML20138G035 + (00:29:11, 12 December 2024)
- ML20138G037 + (00:29:11, 12 December 2024)
- PNO-I-97-017, on 970319,Units 1 & 2 Experienced Dual Unit Reactor Trip from Full Power Due to Electrical Fault Protection Signal from 345 Kv Bus in Onsite Switchyard. Signal Tripped Both Main Generators + (00:29:12, 12 December 2024)
- ML20138G029 + (00:29:13, 12 December 2024)
- 05000318/LER-1997-001-01, :on 970401,refueling Machine Overload Protective Circuitry Was Inoperable Due to Failure to Correctly Translate Refueling Machine Circuitry Design Into Ts.Mod to Overload Bypass Was Installed + (00:29:15, 12 December 2024)
- ML20138G027 + (00:29:16, 12 December 2024)
- ML20138G023 + (00:29:17, 12 December 2024)
- ML20138G015 + (00:29:23, 12 December 2024)
- ML20138G017 + (00:29:23, 12 December 2024)
- PNO-II-97-014, on 970305,Unit 3 Experienced Loss of Offsite Power & Declared Notification of Unusual Event.Unit 2 Operating at 100 Percent During Event & Unaffected.Unit 1 in Long Term Shutdown Condition & Also Unaffected + (00:29:24, 12 December 2024)
- ML20138G010 + (00:29:25, 12 December 2024)