Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13331B453 + (05:44:42, 11 January 2025)
- ML13331B452 + (05:44:46, 11 January 2025)
- ML13331B451 + (05:44:49, 11 January 2025)
- ML13331B450 + (05:44:50, 11 January 2025)
- ML13331B449 + (05:44:51, 11 January 2025)
- ML13331B448 + (05:44:53, 11 January 2025)
- ML13331B446 + (05:44:58, 11 January 2025)
- ML13331B445 + (05:45:07, 11 January 2025)
- ML13331B443 + (05:45:09, 11 January 2025)
- ML13331B442 + (05:45:11, 11 January 2025)
- ML13331B440 + (05:45:17, 11 January 2025)
- ML13331B439 + (05:45:24, 11 January 2025)
- ML13331B438 + (05:45:25, 11 January 2025)
- ML13331B437 + (05:45:26, 11 January 2025)
- ML13331B436 + (05:45:27, 11 January 2025)
- ML13331B435 + (05:45:28, 11 January 2025)
- ML13331B434 + (05:45:29, 11 January 2025)
- ML13331B433 + (05:45:30, 11 January 2025)
- 05000206/LER-1980-031-03, /03L-0:on 800728,during Routine Equipment Rotation,South Saltwater Cooling Pump Discharge Valve Failed to Open Automatically.Caused by Installation of Solenoid Valve Operator W/Wrong Size Spring.Valve Replaced + (05:45:32, 11 January 2025)
- 05000206/LER-1980-031, Forwards LER 80-031/03L-0 + (05:45:33, 11 January 2025)
- 05000206/LER-1980-032-03, /03L-0:on 800717,during Cold Shutdown Conditions, Isolation Valve for Svc Water to Containment Failed to Close Upon Demand.Caused by Small Amount of Desiccant Which Entered Solenoid During Removal of Air Dryer Desiccant + (05:45:35, 11 January 2025)
- 05000206/LER-1980-032, Forwards LER 80-032/03L-0 + (05:45:37, 11 January 2025)
- 05000206/LER-1980-014, Has Been Cancelled + (05:45:39, 11 January 2025)
- ML13331B424 + (05:45:42, 11 January 2025)
- ML13331B423 + (05:45:43, 11 January 2025)
- ML13331B422 + (05:45:44, 11 January 2025)
- 05000206/LER-1980-028-01, /01T-0:on 800612,during IE Bulletin 79-14 Insp, Inadequate Pipe Guides Discovered in Safety Injection Sys Injection Lines.Caused by Improper Installation.Guides Will Be Modified Before Return to Svc + (05:45:45, 11 January 2025)
- 05000206/LER-1980-028, Forwards LER 80-028/01T-0 + (05:45:47, 11 January 2025)
- PNO-V-80-053, on 800619,film Badge Data of Subcontractor Employee Indicated Exposure Exceeding Quarterly limit.Self- Reading Dosimeter Readings Indicated Significantly Lower Exposure.Validity of Data Being Examined + (05:45:49, 11 January 2025)
- ML13331B417 + (05:45:50, 11 January 2025)
- 05000206/LER-1980-027-03, /03L-0:on 800528,radiographic Examination of Feedwater Sys Welds Inside Containment Found Seven Unacceptable Defects Including Lack of Penetration,Porosity & Slag Inclusion.Caused by Original Const Defects + (05:45:52, 11 January 2025)
- 05000206/LER-1980-027, Forwards LER 80-027/03L-0 + (05:45:54, 11 January 2025)
- 05000206/LER-1980-023-03, /03L-0:on 800523,during Refueling Outage,Flaw Detected Extending Below Min Wall Thickness in Heat Exchanger E-20B.Caused by Improper Clearance of Previously Repaired Flaw.Flaw Repaired + (05:45:55, 11 January 2025)
- 05000206/LER-1980-023, Forwards LER 80-023/03L-0 + (05:45:57, 11 January 2025)
- 05000206/LER-1980-026-01, /01T-0:on 800609,preliminary Results of Main Steam Line Break Accident Scenarios to Determine Containment Response Required Corrective Actions to Reduce Calculated Peak Containment Pressures.Rept Re 800513 Meeting Encl + (05:45:59, 11 January 2025)
- 05000206/LER-1980-026, Forwards LER 80-026/01T-0 & Rept Re Automatic Initiation of Auxiliary Feedwater Sys,Per 800513 Meeting W/Nrc + (05:46:01, 11 January 2025)
- 05000206/LER-1980-025-99, /99X-0:on 800505,during Dye Penetrant Insp of Reactor Coolant Pump Flywheel Bores in Refueling Outage, Linear Indications Found in Welds.Cause Unstated.Welds in Bore of Flywheels Installed to Prevent Relative Motion + (05:46:03, 11 January 2025)
- 05000206/LER-1980-025, Forwards LER 80-025/99X-0 + (05:46:05, 11 January 2025)
- 05000206/LER-1980-019-01, /01T-0:on 800510,during Insp Re IE Bulletin 79-14, U-bolt Support Missing on RHR Cooling Water Return Line. Subsequent Analysis Showed Seismic Stresses Excessive W/O Support.New Support Installed 800510 + (05:46:07, 11 January 2025)
- 05000206/LER-1980-019, Forwards LER 80-019/01T-0 + (05:46:09, 11 January 2025)
- 05000206/LER-1980-021-01, /01T-0:on 800515,while Conducting Visual Examinations of Feedwater Sys Per IE Bulletin 79-13,three Deficient Supports Were Identified.Caused by Broken Rod Hanger Clamp & Deformed Guide.Supports Will Be Repaired + (05:46:11, 11 January 2025)
- 05000206/LER-1980-021, Forwards LER 80-021/01T-0 + (05:46:13, 11 January 2025)
- 05000206/LER-1980-020-01, /01T-0:on 800513,two Failed Hydraulic Shock & Sway Suppressors Found During Functional Testing Performance. Caused by Operator Error & Excessive Hydraulic Fluid Leakage,Leading to Abnormal Wear + (05:46:14, 11 January 2025)
- 05000206/LER-1980-024-01, /01T-0:on 800516,while Performing Radiographic Exams of Selected Main Steam Lines Inside Containment,Four Welds Were Found W/Indications Consisting of Slag Inclusions,Porosity &/Or Lack of Penetration + (05:46:16, 11 January 2025)
- 05000206/LER-1980-024, Forwards LER 80-024/01T-0 + (05:46:19, 11 January 2025)
- ML13331B392 + (05:46:22, 11 January 2025)
- ML13331B391 + (05:46:23, 11 January 2025)
- ML13331B390 + (05:46:24, 11 January 2025)
- 05000206/LER-1980-022-01, /01T-0:on 800507,during Inservice Insp of Reactor Coolant Pump Loop B Seal Injection Piping,Rounded Indication in Excess of Allowable Limits Was Found.Caused by Small Pin Hole Extending Below Min Wall of Pipe + (05:46:26, 11 January 2025)
- 05000206/LER-1980-022, Forwards LER 80-022/01T-0 + (05:46:27, 11 January 2025)
- 05000206/LER-1980-016-03, /03L-0:on 800420,during Refueling,Source Range Nuclear Instrument Channels 1201 & 1202 Failed.Caused by Water Leakage Through Refueling Canal Flange Seal.Flange Resealed.Affected Instrumentation Repaired + (05:46:29, 11 January 2025)