Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14108A401 + (02:32:12, 11 January 2025)
- ML14108A399 + (02:32:13, 11 January 2025)
- ML14108A385 + (02:32:14, 11 January 2025)
- IR 05000327/2014007 + (02:32:35, 11 January 2025)
- ML14108A376 + (02:32:36, 11 January 2025)
- IR 05000321/2014002 + (02:32:50, 11 January 2025)
- ML14108A338 + (02:32:50, 11 January 2025)
- RC-14-0069, Revision to License Amendment Request - LAR 13-02396 Request for NRC Approval of Radiation Emergency Plan Change + (02:32:51, 11 January 2025)
- 05000331/LER-2014-002, Regarding Both Doors in Secondary Containment Airlock Opened Concurrently + (02:32:53, 11 January 2025)
- ML14108A328 + (02:32:54, 11 January 2025)
- ML14108A327 + (02:32:54, 11 January 2025)
- 05000259/LER-2013-006-02, Regarding B Standby Liquid Control Pump Inoperable for Longer than Allowed by the Technical Specifications + (02:32:56, 11 January 2025)
- ULNRC-06104, Request for Interpretation of Technical Specification Surveillance Requirement 3.7.11.1, Verify Each Cracs Train Has the Capability to Remove the Assumed Heat Load + (02:32:57, 11 January 2025)
- L-14-107, Core Operating Limits Report, Cycle 19 + (02:32:58, 11 January 2025)
- Press Release-14-028, NRC Seeks Public Comment on Proposed Procedures for New Reactor Pre-Operation Hearings; Meeting May 21 + (02:32:59, 11 January 2025)
- ML14108A210 + (02:33:00, 11 January 2025)
- ML14108A206 + (02:33:01, 11 January 2025)
- ML14108A202 + (02:33:01, 11 January 2025)
- ML14108A201 + (02:33:02, 11 January 2025)
- ML14108A164 + (02:33:06, 11 January 2025)
- ML14108A135 + (02:33:08, 11 January 2025)
- ML14108A142 + (02:33:08, 11 January 2025)
- ML14108A134 + (02:33:09, 11 January 2025)
- Press Release-I-14-017, NRC Issues White Inspection Finding for Ginna Nuclear Plant; Level of Oversight to Be Increased + (02:33:10, 11 January 2025)
- ML14108A104 + (02:33:10, 11 January 2025)
- ML14108A091 + (02:33:14, 11 January 2025)
- ML14108A080 + (02:33:15, 11 January 2025)
- NLS2014031, Revisions to NFPA 805 License Amendment Request and Response to a Request for Additional Information + (02:33:15, 11 January 2025)
- ML14108A068 + (02:33:16, 11 January 2025)
- ZS-2014-0098, Occupational Radiation Exposure Annual Report for 2013 + (02:33:17, 11 January 2025)
- ZS-2014-0099, 2013 Occupational Radiation Exposure Individual Report + (02:33:17, 11 January 2025)
- ML14108A064 + (02:33:18, 11 January 2025)
- ZS-2014-0075, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister + (02:33:18, 11 January 2025)
- ML14108A061 + (02:33:19, 11 January 2025)
- ML14108A060 + (02:33:20, 11 January 2025)
- ML14108A058 + (02:33:21, 11 January 2025)
- ML14108A059 + (02:33:21, 11 January 2025)
- ML14108A057 + (02:33:22, 11 January 2025)
- ML14108A045 + (02:33:22, 11 January 2025)
- ML14108A044 + (02:33:23, 11 January 2025)
- LIC-14-0063, Radiological Effluent Release Report and Radiological Environmental Operating Report + (02:33:24, 11 January 2025)
- ML14108A042 + (02:33:24, 11 January 2025)
- ML14108A005 + (02:33:25, 11 January 2025)
- IR 05000133/2014007 + (02:33:26, 11 January 2025)
- ML14108A004 + (02:33:26, 11 January 2025)
- 05000456/LER-2014-001, Regarding Inadequate Procedural Guidance Results in Non-Compliance with Technical Specification 3.4.3 - RCS Pressure and Temperature (P/T) Limits + (02:33:29, 11 January 2025)
- PNP 2014-045, 2013 Annual Non-radiological Environmental Operating Report + (02:33:29, 11 January 2025)
- ML14107A421 + (02:33:30, 11 January 2025)
- ML14107A396 + (02:33:32, 11 January 2025)
- ML14107A410 + (02:33:32, 11 January 2025)
- L-PI-14-012, Request for Deferral of the Experience Eligibility Guidelines for Initial Licensed Operator Candidate for the Prairie Island Nuclear Generating Plant (PINGP) + (02:33:38, 11 January 2025)
- ML14107A384 + (02:33:38, 11 January 2025)