SEn tergy Entergy Nuclear Operations, Inc.
600 Rocky Hill Road Plymouth, MA 02360 Pilgrim Nuclear Power Station April 10, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Special Report - TS Table 3.2.F, Inoperable Reactor Building Vent Radiation Monitor LETTER NUMBER:
2.14.034
Dear Sir or Madam:
This special report is submitted in accordance with Pilgrim Station's Technical Specifications Table 3.2.F, "Surveillance Instrumentation", Note 7. Note 7 requires the submittal of a special report if the Reactor Building Vent Radiation Monitor RT-1001-609 becomes inoperable and is not restored to operable status within 7 days.
On March 30, 2014, during performance of daily calibration test in accordance with Pilgrim procedure 2.1.5, Attachment 2, the trip adjustment test for the Reactor Building Vent Radiation Monitor RT-1001-609 failed and the instrument was declared inoperable. Limiting Condition of Operability (LCO) ACT-1-14-0043 was activated to capture the inoperable status.
The instrument was repaired and restored to operable status on April 7, 2014. The cause of the inoperability was a failed transistor on the A2 power supply board which was replaced.
This letter contains no regulatory commitments.
Please contact Joseph Lynch, Regulatory Assurance Manager, at (508) 830-8403, if there are any questions regarding this subject.
David Noyes Director, Regulatory and Performance Improvement
Entergy Nuclear Operations, Inc Pilgrim Nuclear Station cc:
Ms. Nadiyah Morgan, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-F2 11555 Rockville Pike Rockville, MD. 20852 Letter Number 2.14.034 Page 2 of 2 Mr. William M. Dean Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 Senior Resident Inspector Pilgrim Nuclear Power Station