Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140A565 + (22:32:16, 11 December 2024)
- PNO-III-86-024, on 860317,backup Reactor Protection Sys Trip Breaker Failed to Trip During Bus a Transfer from Primary Electrical Supply.Caused by Repeated Testing.Manual Scram Inserted.Investigation Underway + (22:32:17, 11 December 2024)
- ML20140A562 + (22:32:18, 11 December 2024)
- ML20140A557 + (22:32:19, 11 December 2024)
- ML20140A553 + (22:32:20, 11 December 2024)
- ML20140A551 + (22:32:21, 11 December 2024)
- ML20140A550 + (22:32:22, 11 December 2024)
- ML20140A547 + (22:32:23, 11 December 2024)
- ML20140A546 + (22:32:24, 11 December 2024)
- 05000260/LER-1997-001-05, :on 970424,reactor Scram Occurred During Surveillance Testing.Caused by Personnel Error.Affected Sys Were Restored to pre-event Conditions,Administered Personnel Corrective Actions & Briefed Maintenance + (22:32:25, 11 December 2024)
- ML20140A540 + (22:32:27, 11 December 2024)
- ML20140A539 + (22:32:28, 11 December 2024)
- IR 05000423/1985063 + (22:32:29, 11 December 2024)
- ML20140A536 + (22:32:29, 11 December 2024)
- NRC-86-3112, Forwards Results of Bart Evaluation Model Large Break LOCA 10CFR50.46 Analysis,Demonstrating Acceptability of upper-head Injection Removal in Support of License Amend. Info Re Sys Behavior W/ & W/O upper-head Injection Encl + (22:32:30, 11 December 2024)
- ML20140A528 + (22:32:31, 11 December 2024)
- 05000260/LER-1997-001, Forwards LER 97-001-00,providing Details Concerning Reactor Scram from 100 Percent Power Resulting from Personnel Error During Surveillance Testing + (22:32:32, 11 December 2024)
- ML20140A526 + (22:32:33, 11 December 2024)
- ML20140A524 + (22:32:34, 11 December 2024)
- ML20140A523 + (22:32:35, 11 December 2024)
- PNO-II-86-021, on 860310,unit Returned to Operation After Being Out of Svc Since 860307 for Repair of Leaking Sludge Lance Cover on Steam Generator.Unit Operating at 100% Power + (22:32:36, 11 December 2024)
- ML20140A519 + (22:32:36, 11 December 2024)
- ML20140A516 + (22:32:37, 11 December 2024)
- PNO-IV-86-009, on 860313,overfill of 10-ton UF6 Cylinder Occurred.Cause Apparently Due to Scale Malfunction.Excess Matl Being Removed.Scale Being Disassembled.No UF6 Released + (22:32:40, 11 December 2024)
- ML20140A513 + (22:32:40, 11 December 2024)
- AECM-86-0015, Monthly Operating Rept for Dec 1985 + (22:32:41, 11 December 2024)
- ML20140A506 + (22:32:42, 11 December 2024)
- ML20140A502 + (22:32:43, 11 December 2024)
- ML20140A500 + (22:32:45, 11 December 2024)
- 05000263/LER-1985-021, :on 851218,25 & 28,EFT Sys Transferred to Emergency Mode.Caused by Spurious Trip of Ammonia Monitor & Chlorine Monitor Tape Break.License Amend Requested to Remove Ammonia Monitor + (22:32:49, 11 December 2024)
- 05000320/LER-1986-001, :on 851220,no Remote Speed Control Existed on Emergency Diesel Generator DF-X-1B.Caused by Defective Solenoid in Replacement Governor.Governor & Solenoid Returned to Mfg for Analysis + (22:32:53, 11 December 2024)
- ML20140A489 + (22:32:54, 11 December 2024)
- ML20140A487 + (22:32:54, 11 December 2024)
- ML20140A485 + (22:32:55, 11 December 2024)
- 05000382/LER-1985-056, :on 851219,reactor Trip Occurred Due to Low Water Level in Both Steam Generators.Caused by Inadvertent Isolation of Air Evacuation Pump Suction Valve.Personnel Reinstructed Re Operating Errors + (22:32:57, 11 December 2024)
- ML20140A481 + (22:32:58, 11 December 2024)
- ML20140A480 + (22:32:59, 11 December 2024)
- ML20140A477 + (22:33:00, 11 December 2024)
- ST-HL-AE-1617, Safety Balance for Elimination of Pressurizer Surge Line Break Protective Devices + (22:33:01, 11 December 2024)
- ML20140A476 + (22:33:01, 11 December 2024)
- ML20140A470 + (22:33:02, 11 December 2024)
- 05000295/LER-1985-040-04, :on 851219,penetration Pressurization Air Compressors Auto Started.Caused by Low Supply Pressure from Instrument Air Sys Due to Air Dryer Malfunction.Consequences of Loss of Pressure Stressed to Personnel + (22:33:04, 11 December 2024)
- ST-HL-AE-1569, Final Deficiency Rept Re Pipe Support Deficiencies.Initially Reported on 850530.Pipe Support Const & QC Insp Procedures Consolidated Into Std Site Procedure & Implemented in mid-Dec + (22:33:05, 11 December 2024)
- ML20140A464 + (22:33:07, 11 December 2024)
- ML20140A465 + (22:33:07, 11 December 2024)
- IR 05000320/1985013 + (22:35:36, 11 December 2024)
- ML20140A458 + (22:35:37, 11 December 2024)
- ML20140A457 + (22:35:39, 11 December 2024)
- ML20140A454 + (22:35:41, 11 December 2024)
- ML20140A453 + (22:35:41, 11 December 2024)
- ML20140A451 + (22:35:42, 11 December 2024)