ML20140A464

From kanterella
Jump to navigation Jump to search
Forwards Summary Description & Evaluation of Impact of Changes to Final Deficiency Repts Evaluated as Substantive. Revs Evaluated as Not Substantive Noted in Internal Files
ML20140A464
Person / Time
Site: Palo Verde  
Issue date: 12/30/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-34325-EEVB, NUDOCS 8601230109
Download: ML20140A464 (3)


Text

h th Arizona Nuclear Ebwer Project 1-2 Fir (2 24 P O. BOX 52034

  • PHOENIX, art 2ONA 85072-2034 Y

ANPP-34352-EEVB/TDS/TP6 9D012,' fag December 30, 1985 U. 3. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:

Mr. D. F. Kirsch, Acting Director Division of Resident Recctor Projects and Engineering Program

Subject:

Deficiency Evaluation Report Revisions File:

85-006-216; D.4.33.2

Dear Sir:

ANPP has conducted a review of the revised final report, submitted by our A/E, after submittal of our Final Report to your office.

Attached is a summary description and evaluation of the impact of change to our Final Report which ANPP has evaluated as a substantive change.

Those revisions which have been evaluated as not substantive have been so noted in our files.

Very truly yours,

.. E. Van Br t, Jr.

Executive Vice President Project Director EEVB/TPS/ldf Attachment cc: See Page Two 8601230109 851230 PDR ADOCK 05000528 S

PDR

/

y

((4]

t

Mr. D. F. Kirsch DER Revisions Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 J. G. Haynes (4r60)

D. B. Karner (4060)

W. E. Ide (4074)

D. B. Fasnacht (6330)

A. C. Rogers (4056)

L. A. Souza (6195)

T. D. Shriver (6085)

D. E. Fowler (6260)

C. N. Russo (6330)

J. R. Bynum (6125)

J. M. Allen (6130)

D. Canady (6345)

A. C. Gehr (4141)

G. A. Hierzer (633)

W. G. Bingham (6330)

R. W. Welcher (Bechtel/Norwalk)

H. D. Foster (6330)

D. R. Hawkinson (6330)

R. P. Zimmerman (6241)

M. L. Clyde (6079)

B. T. Parker (6345)

J. Provasoli (4057)

D. N. Stover (4082)

J. D. Houchen (6291)

J. E. Kirby (6501)

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l

l l

i

=

1 ATTACHMENT DER Summary of Change Impact of Change 85-16 Cracked spoke in AIFJ Hubs have been Rather than a complete replaced in Units 1 replacement of all AHU and 2.

Unit 3 work I

hubs, the hub for AHU will be completed i

3M-HJB-ZO4 was replaced prior to fuel load.

with radiographed hub from Unit 2. AHU 1M-HJB-204 and 3M-HJA-204 were.or will be, replaced with on site fabricated hubs.

These have been tested satisfac-torily on site. The re-maining AHU hubs were or will be, replaced with new hubs supplied by AAF.