Proposed Changes to Tech Spec 3/4.7.9,removing List of Snubbers to Facilitate Implementation of Reactor Coolant Pump Snubber Optimization
ML20140A453
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/16/1986
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20140A448 List:
References
NUDOCS 8601230104
Download: ML20140A453 (15)


Text

,

PUNr SYSHMS 3/4.7.9 HYORAULIC SNUHHERS LIMITDC CDNDITION FOR OPERATION 3.7.9.1 All hydraulic snubbers shall be OPERABLE.

'Ihe only snubbers excluded fran the requirement are those imtalled on nornafety related systems and then only if their failure or failure of the system on which they are installed would have m adverse of feet on any safety-relatal system.

APPLICABILITY:

10 DES 1, 2, 3, and 4.

ACTION:

1 With one or rcre hydraulic snubbers inoperable, replace or restore the iroperable snubber (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least FOT STANDBY within the next 6 tours and in 00LD SHLTIIIEN within the following 30 tours.

SURVEILLANCE REQUIREMDfl3 4.7.9.1 Hydraulic snubbus will tn denonstrated OPERN3IE by p!rforTnance of the following augmnted inservice inspection program and the requirenents of Specification 4.0.5.

[

a.

Each hydraulic snubber with seal material fabricated fran ethylene propylere or other materials demonstrated ccripatible with the op' rating environment and approved as such by the NRC, shall in deter:nined OPERN3LE at least once after rnt less than 4 nonths tut within 6 nonths of initial criticality and in accordance with the inspection schedule of Table 4.7-4 thereafter, by a visual inspection of the snubber.

Visual inspectiom of the snubber shall include, but am not necessarily limited to, inspection of the hydraulic fluid reservoirs, fluid connectiom, and linkage conmetiom to the pipirn and anchors.

Initiation of the Table 4.7-4 inspection schedule shall te made assumiry the unit was previously at the 6 renth inspection interval.

b.

Each hydraulic snubber with seal mitorial not fabricated frcrn ethylene propylene or other materials demonstrated conpatible with the operating envirormnt shall in determined OPERN3LE at least onm per 37 days by a visual impection of the snubber. Visual iro,ection of the snubtnm shall include but

),

are rnt mcossarily limited to, inspection of the hydraulic fluid reservoirs, fluid connectiom, and linkage conrections to the piping and anchors.

CRYSTAL RIVER - UNIT 3 3/4 7-25 8601230104 540116 DR ADOCM 0 g2

PUNT SYS11MS HYIRAULIC SN (Continued)

SERVEILUNCE REQUIRENDFIS (Continued) c.

At least once per 18 nonths during shutdown, a representative 1

sample of at least 10 hydraulic snubbers or at least 10% of all snubbers referenced in Specification 3.7.9.1, whichever is less, shall be selected and functionally tested to verify correct piston novement, lock up and bleed.

Snubbers greater than 50,000 lbs.

capacity my be excluded frm functional testing requirements.

Snubbers selected for functional testing shall be selected on a rotating basis.

Snubters identified as either "Especially l

Difficult to Rwwe" or in "High Radiation Zones" my be exempted from functional testing provided these snubbers were demonstrated OPERABIE during previous functional tests.

Snubbers found inoperable duriry) functional testiry shall be restored to OPERABIE status prior to resurting operation.

For each snubber found inoperable during these functional tests, an additional minimtn of 10% of all snubters or 10 snubbers, whichever is less, shall also be functionally tested until no more failures are found or all snublurs have been functionally tested, l

4 CRYSTAL RIVER - UNIT 3 3/4 7-26 1

e 4

CRYSTAL RIVER - UNIT 3 3/4 7-27

e q

e CRYSTM, RIVE 1 - UNIT 3 3/4 7-28 l

i

-mtsrED-CRYSTAL RIVER - UNIT 3 3/4 7-29

)

0 CRYSTAL RIVER - UNIT 3 3/4 7-30

T e

CRYSTAL RIVER - UNIT 3 3/4 7-31

4 t'

CRYSTAL RIVER - UNIT 3 3/4 7-32

9 9

e CRYSTAL RIVER - UNIT 3 3/4 7-33

9 9

CRYSTAL RIVER - UNIT 3 3/4 7-34 i

-DEIEIED-CRY 5fAL RIVER - UNIT 3 3/4 7-34a

4 O

CRYSTAL RIVER - UNIT 3 3/4 7-34b

-DEIEIED-CRYSTAL RIVER - UNIT 3 3/4 7-34c

g CRYSTAL RIVER - UNIT 3 3/4 7-34d l

-DEIEIED-t CRYSTAL RIVER - U'1IT 3 3/4 7-34e