Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000320/1986003 + (21:58:57, 11 December 2024)
- ML20140D108 + (21:58:57, 11 December 2024)
- 05000352/LER-1985-099, :on 851223,unplanned Actuation of Nuclear Steam Supply Shutoff Sys Occurred W/Unit in Operational Mode 1 at 72% Power.Caused by Signal Loss,Possibly Due to Disturbance to Rack Connectors + (21:59:00, 11 December 2024)
- IR 05000213/1997004 + (21:59:02, 11 December 2024)
- ML20140D104 + (21:59:02, 11 December 2024)
- ML20140D103 + (21:59:03, 11 December 2024)
- ML20140D102 + (21:59:05, 11 December 2024)
- ML20140D100 + (21:59:07, 11 December 2024)
- 05000352/LER-1985-098, :on 851219,w/unit in Startup Mode at 0% Power, RWCU Sys Isolation Occurred.Caused by Incorrect Procedure Rev During Installation of Plant Mod.Sys Restored to Svc & Procedure Rev Corrected + (21:59:09, 11 December 2024)
- ML20140D097 + (21:59:11, 11 December 2024)
- ML20140D096 + (21:59:12, 11 December 2024)
- ST-HL-AE-1615, Final Rept Re Interaction of safety-related & nonsafety- Related Instruments Connected to Same Process Taps.Initially Reported on 851009.Item Not Reportable Per 10CFR50.55(e) + (21:59:12, 11 December 2024)
- ML20140D092 + (21:59:14, 11 December 2024)
- ML20140D093 + (21:59:14, 11 December 2024)
- ML20140D091 + (21:59:15, 11 December 2024)
- ML20140D090 + (21:59:16, 11 December 2024)
- ML20140D089 + (21:59:17, 11 December 2024)
- ML20140D086 + (21:59:18, 11 December 2024)
- ML20140D088 + (21:59:18, 11 December 2024)
- ML20140D084 + (21:59:27, 11 December 2024)
- 05000373/LER-1997-013, :on 970320,identified Concern Regarding LaSalle Electrical Surveillance Isolation Logic Sys Functional Test. Caused by Misinterpretation of TS Surveillance Requirement 4.3.2.2.Procedures Revised + (21:59:29, 11 December 2024)
- 05000373/LER-1997-011, :on 970318,source Range Monitor Detector Retract Permit Enabled Lower than Allowed by TS Due to Nonconservative Setpoint in Inadequate Procedure.Setpoint Determination Was Performed + (21:59:32, 11 December 2024)
- IR 05000285/1997008 + (21:59:35, 11 December 2024)
- 05000306/LER-1997-002-02, :on 970318,discharge Valves to RCS Cold Legs Were Closed When RCS Was Above Shutdown Because of Administrative Error.Training Was Provided on Intent of Motherhood Clause to Operations Staff + (21:59:39, 11 December 2024)
- ML20140D076 + (21:59:41, 11 December 2024)
- 05000265/LER-1997-004-06, :on 970509,drywell Equipment Drain Sump & Floor Drain Sump Covers Were Not Constructed IAW Design Drawings, Due to Original Construction Error.Design Change Package Has Been Completed + (21:59:43, 11 December 2024)
- ML20140D072 + (21:59:44, 11 December 2024)
- ML20140D071 + (21:59:45, 11 December 2024)
- ML20140D069 + (21:59:46, 11 December 2024)
- NSD-NRC-97-5062, Forwards Rev 0 to WCAP-14837, AP600 Shutdown Evaluation Rept, Which Provides Evaluation Consistent W/Outline Defined in for Inclusion in SSAR + (21:59:48, 11 December 2024)
- ML20140D065 + (21:59:48, 11 December 2024)
- TXX-4675, Interim Deficiency Rept CP-85-42 Re Possible Adverse Effects of Substituting pre-formed Sections of Thermolag on Conduit & Conduit Support Installations.Initially Reported on 850920.Final Rept Will Be Submitted by 860516 + (21:59:55, 11 December 2024)
- ML20140D061 + (21:59:55, 11 December 2024)
- ML20140D060 + (21:59:56, 11 December 2024)
- ML20140D059 + (21:59:57, 11 December 2024)
- TXX-4674, Interim Deficiency Rept CP-85-36 Re Installation of nonsafety-related Conduit on nonsafety-related Dead Weight Supports Not in Compliance W/Reg Guide 1.29.Initially Reported on 850906.Final Rept Submitted by 860703 + (21:59:57, 11 December 2024)
- ML20140D056 + (21:59:58, 11 December 2024)
- TXX-4671, Interim Deficiency Rept CP-85-26 Re Steam Generator Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Concern Being Evaluated & Scheduled for Resolution by 860502.Final Rept Will Be Submitted by 860523 + (21:59:59, 11 December 2024)
- ST-HL-AE-1585, Forwards Response to Draft SER Item 10 Re Reactor Coolant Pump Protective Relaying.Capability of Pump Protective Relaying to Perform Function in Turbine Generator Bldg for Expected Temp Extremes Reconfirmed + (21:59:59, 11 December 2024)
- ML20140D052 + (22:00:00, 11 December 2024)
- TXX-4672, Interim Deficiency Rept CP-85-31 Re Possible Impact of Addl Weight on Electrical Raceway Support Sys.Initially Reported on 850827.Analysis Required to Resolve Issue Scheduled for Completion by 860615.Final Rept Will Be Submitted by 860707 + (22:00:01, 11 December 2024)
- ML20140D048 + (22:00:02, 11 December 2024)
- ML20140D046 + (22:00:02, 11 December 2024)
- 05000416/LER-1997-001-02, :on 970312, a Subsystem Was Declared Inoperable.Caused by Inappropriate Action. a Subsystem Was Retested W/No Malfuntions Identified + (22:00:04, 11 December 2024)
- ML20140D042 + (22:00:05, 11 December 2024)
- NSD-NRC-97-5163, Forwards Proprietary & non-proprietary Responses to NRC RAI 440.584,rev 1 on Osu Test SB05 & Affidavit.Proprietary Info Withheld,Per 10CFR2.790 + (22:00:06, 11 December 2024)
- ML20140D040 + (22:00:07, 11 December 2024)
- NPL-97-0177, Forwards Rept 97318-2, Suppl to Evaluation of EQ Impact of Wepc TS Change Request 192, Which Is Needed to Address Four Items + (22:00:08, 11 December 2024)
- LR-N970247, Special Rept 97-01:on 970317,test Failure of 1D-G-400, D Edg.Caused by Failed Emergency Start Preset Relay. Relay Was Immediately Replaced & Retest of D EDG Was Satisfactory + (22:00:09, 11 December 2024)
- ML20140D037 + (22:00:09, 11 December 2024)
- 05000369/LER-1985-038-01, :on 851222,reactor Tripped Due to Turbine Trip from 93% Power.Caused by Ground Fault within Motor Operated Disconnect (MOD) on Main Power Busline 1B.Unit Stabilized & MOD Repaired + (22:00:14, 11 December 2024)