Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140D994 + (21:46:37, 11 December 2024)
- ML20140D992 + (21:46:37, 11 December 2024)
- ML20140D991 + (21:46:38, 11 December 2024)
- ML20140D990 + (21:46:40, 11 December 2024)
- ML20140D988 + (21:46:41, 11 December 2024)
- ML20140D986 + (21:46:42, 11 December 2024)
- ML20140D984 + (21:46:43, 11 December 2024)
- ML20140D982 + (21:46:44, 11 December 2024)
- ML20140D981 + (21:46:46, 11 December 2024)
- ML20140D980 + (21:46:46, 11 December 2024)
- B16304, Application for Amend to License NPF-49,incorporating Encl Proposed Changes to Plant TS 3.4.9.3.Proposed Changes Would Revise Setpoint of Residual Heat Removal Suction Relief Valves + (21:46:47, 11 December 2024)
- IR 05000295/1996020 + (21:46:48, 11 December 2024)
- IR 05000284/1984001 + (21:46:49, 11 December 2024)
- ML20140D975 + (21:46:50, 11 December 2024)
- ML20140D973 + (21:46:51, 11 December 2024)
- ML20140D972 + (21:46:51, 11 December 2024)
- ML20140D969 + (21:46:52, 11 December 2024)
- ML20140D967 + (21:46:53, 11 December 2024)
- ML20140D966 + (21:46:53, 11 December 2024)
- ML20140D965 + (21:46:57, 11 December 2024)
- ML20140D962 + (21:46:58, 11 December 2024)
- B16355, Application for Amend to License NPF-49,incorporating Encl Proposed Changes to Plant TS 3.7.14.Proposed Changes Would Clarify Actions Taken When Temp Exceeds Limit by Amount Equal to 20 F & Period Equal to 8 H + (21:46:59, 11 December 2024)
- ML20140D960 + (21:46:59, 11 December 2024)
- ML20140D958 + (21:47:00, 11 December 2024)
- ML20140D957 + (21:47:00, 11 December 2024)
- ML20140D955 + (21:47:01, 11 December 2024)
- RBG-23-007, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-74.Corrective Actions:Records Concerning Certified Matl Test Rept Obtained from GE for Master Parts List Item C41-F004A & B,Serial Numbers 464 & 465,respectively + (21:47:02, 11 December 2024)
- ML20140D954 + (21:47:02, 11 December 2024)
- ML20140D952 + (21:47:03, 11 December 2024)
- ML20140D950 + (21:47:04, 11 December 2024)
- ML20140D948 + (21:47:09, 11 December 2024)
- ML20140D945 + (21:47:11, 11 December 2024)
- ML20140D944 + (21:47:12, 11 December 2024)
- U-602747, Forwards Summary of CPS Improvement Actions & Results Completed Since Sept 1996 Plant Shutdown Following Event Involving Failure of B Reactor Recirculation Pump Seal + (21:47:13, 11 December 2024)
- ML20140D939 + (21:47:14, 11 December 2024)
- ML20140D941 + (21:47:14, 11 December 2024)
- ML20140D935 + (21:47:15, 11 December 2024)
- B11955, Forwards Clarifying Info to Re Impact of Release of Superheated Steam from Postulated Main Steam Line Break on Environ Qualification of Equipment Located Outside Containment,Per 860108 Meeting + (21:47:16, 11 December 2024)
- ML20140D931 + (21:47:17, 11 December 2024)
- U-602753, Discusses 970522 Inspector Exit Re 970309 Event Involving Actions by Operation Department Personnel That Were Contrary to Approved Station Procedures + (21:47:18, 11 December 2024)
- ML20140D928 + (21:47:18, 11 December 2024)
- ML20140D923 + (21:47:19, 11 December 2024)
- ML20140D926 + (21:47:19, 11 December 2024)
- ST-HL-AE-1381, Informs of Revised Program to Assure That Design Info Input for Seismic Analyses Kept Consistent w/as-built Configuration Per IE Bulletin 79-14.Revised Program Requires safety-related Piping Sys Walkdown by Dedicated Group + (21:47:20, 11 December 2024)
- ML20140D918 + (21:47:21, 11 December 2024)
- ML20140D919 + (21:47:21, 11 December 2024)
- ML20140D917 + (21:47:22, 11 December 2024)
- ML20140D916 + (21:47:22, 11 December 2024)
- ML20140D914 + (21:47:23, 11 December 2024)
- 05000266/LER-1950-266, Responds to NRC Re Violations Noted in Insp Repts 50-266/97-07 & 50-301/97-07.Corrective actions:30-day Security LER 50-266/97-S01-00,was Submitted to Commission on 970304 + (21:47:24, 11 December 2024)
- ML20140D912 + (21:47:25, 11 December 2024)
- B11797, Submits Schedule for Upcoming Isap Milestones,Including Collecting Info for NRC Integrated Assessment,Corrective Actions Needed as Result of Isap Evaluation Process & Completion of Ranking Process + (21:47:26, 11 December 2024)