Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140F044 + (21:36:25, 11 December 2024)
- ML20140F043 + (21:36:26, 11 December 2024)
- ML20140F041 + (21:36:27, 11 December 2024)
- TXX-4666, Responds to Request for Addl Info Re Response to Notice of Violation from Insp 50-445/85-11.Nonconforming Condition Outside Scope of Assigned Insp Will Be Noted by ERC Inspectors as out-of-scope Observation + (21:36:27, 11 December 2024)
- ML20140F038 + (21:36:28, 11 December 2024)
- ML20140F036 + (21:36:30, 11 December 2024)
- TXX-4653, Advises That Response to Findings Noted in Insp 50-445/85-11 Delayed Due to Planning & Participation in NRC Audits of Design Adequacy & Quality of Const Areas.Response Will Not Be Submitted Until 860115 + (21:36:31, 11 December 2024)
- ML20140F031 + (21:36:32, 11 December 2024)
- ML20140F026 + (21:36:33, 11 December 2024)
- ML20140F027 + (21:36:33, 11 December 2024)
- ML20140F024 + (21:36:34, 11 December 2024)
- 05000255/LER-1986-012, :on 860221,vol of Oil in Fuel Oil Storage Tank Reduced Below Tech Specs.Vendor Truck Arrived & Departed W/O Delivery Due to Adverse Road Conditions.Alternate Delivery Made.Security & Vendor Notified + (21:36:37, 11 December 2024)
- ML20140F015 + (21:36:39, 11 December 2024)
- ML20140F012 + (21:36:43, 11 December 2024)
- 05000278/LER-1986-003-02, :on 860219,partial Containment Isolation Occurred When Operator Removed Wrong Fuse While Applying Blocking Permit.Caused by Misleading Fuse Label & Lack of Adequate Operator Attention.Fuse Label Secured + (21:36:45, 11 December 2024)
- ML20140F009 + (21:36:47, 11 December 2024)
- 05000416/LER-1986-007, :on 860220,RHR Pump B & Standby Svc Water Pump B Automatically Started Due to Technician Connecting Test Switch to Wrong Terminal.Caused by Inadequate Verification by Contractor.Contract Terminated + (21:36:48, 11 December 2024)
- ML20140F007 + (21:36:50, 11 December 2024)
- 05000313/LER-1986-003, :on 850724,discovered Unsealed Openings in Ceiling of Control Room.On 860103,discovered Opening at ceiling-to-wall Interface in Control Room.On 860120, Discovered Gap in ceiling-to-wall Intersection + (21:36:52, 11 December 2024)
- 05000366/LER-1986-008-01, :on 860218,ESF Actuation Occurred.Caused by High RWCU Sys Differential Flow Due to Filter/Demineralizer Isolation Valves Opening Too Quickly When Manually Assisted During Maint.Engineering Review Underway + (21:36:57, 11 December 2024)
- ML20140E995 + (21:37:02, 11 December 2024)
- RBG-43892, Forwards Annual Effluent Release Rept for Jan-Dec 1996 & Rev 6 to RSP-0008, ODCM Procedure + (21:37:03, 11 December 2024)
- 05000295/LER-1986-008-01, :on 860221,negative Flux Rate Trip Discovered Calibr to Nonconservative Value.Caused by Discrepant Westinghouse Owners Group Procedure Restrictions.Tech Spec Approved by NRC + (21:37:05, 11 December 2024)
- ML20140E989 + (21:37:06, 11 December 2024)
- 05000323/LER-1986-005-01, :on 860222,main Turbine & Subsequent Reactor Trip Occurred Due to Generator Loss of Electrical Field Relay Actuation.Caused by Incorrect Polarity.Min Excitation Leads Reversed & Voltage Regulator Passed Test + (21:37:08, 11 December 2024)
- ML20140E986 + (21:37:09, 11 December 2024)
- ML20140E983 + (21:37:10, 11 December 2024)
- ML20140E982 + (21:37:10, 11 December 2024)
- GO2-86-218, Confirms Commitments Made During 860306 Conference Call Re Evacuation Warning in High Noise Areas.Alerting Devices & Strobe Light/Siren Sys Will Be Installed by 860917,as First Phase of Acoustic Study + (21:37:11, 11 December 2024)
- ML20140E981 + (21:37:11, 11 December 2024)
- ML20140E974 + (21:37:13, 11 December 2024)
- ML20140E972 + (21:37:14, 11 December 2024)
- ML20140E970 + (21:37:16, 11 December 2024)
- ML20140E971 + (21:37:16, 11 December 2024)
- ML20140E969 + (21:37:17, 11 December 2024)
- ML20140E967 + (21:37:19, 11 December 2024)
- ML20140E962 + (21:37:20, 11 December 2024)
- ML20140E966 + (21:37:20, 11 December 2024)
- ML20140E960 + (21:37:21, 11 December 2024)
- ML20140E959 + (21:37:22, 11 December 2024)
- ML20140E957 + (21:37:23, 11 December 2024)
- ML20140E955 + (21:37:24, 11 December 2024)
- ML20140E954 + (21:37:24, 11 December 2024)
- ML20140E948 + (21:37:25, 11 December 2024)
- ML20140E951 + (21:37:25, 11 December 2024)
- NUREG-1602, Requests Comments on Encl Draft Documents Including,Draft Regulatory Guide DG-1061, General Guidance, DG-1062, IST, Draft Std Review plan-general Guidance,Draft Std Review Plan - IST & Draft NUREG-1602 + (21:37:26, 11 December 2024)
- ML20140E944 + (21:37:27, 11 December 2024)
- ML20140E945 + (21:37:27, 11 December 2024)
- ML20140E941 + (21:37:28, 11 December 2024)
- ML20140E939 + (21:37:29, 11 December 2024)
- ML20140E937 + (21:37:30, 11 December 2024)