Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141G592 + (20:03:28, 11 December 2024)
- ML20141G591 + (20:03:29, 11 December 2024)
- ML20141G590 + (20:03:30, 11 December 2024)
- ML20141G589 + (20:03:32, 11 December 2024)
- 05000482/LER-1997-012, :on 970605,section 6.2.2 TS Violation Re Shift Compliment Was Noted.Caused by Lack of Administrative Controls to Ensure SCBA Corrective Lenses Were Available for Licensed Operators.Purchased Corrective Lenses + (20:03:33, 11 December 2024)
- IR 05000458/1997007 + (20:03:37, 11 December 2024)
- ML20141G584 + (20:03:38, 11 December 2024)
- ML20141G582 + (20:03:39, 11 December 2024)
- ML20141G583 + (20:03:39, 11 December 2024)
- 05000414/LER-1997-004-03, :on 970424,inadequate Test of Containment Isolation Valve Identified.Caused by Inadequate Work Practices.Personnel Involved Counseled Re Improved Performance + (20:03:41, 11 December 2024)
- ML20141G579 + (20:03:42, 11 December 2024)
- ML20141G580 + (20:03:42, 11 December 2024)
- ML20141G577 + (20:03:43, 11 December 2024)
- ML20141G574 + (20:03:44, 11 December 2024)
- PNO-III-97-058, on 970708,two Packages Exceeding DOT & NRC Radiation Limits Received by Mallinckrodt Nuclear Pharmacies at Two Different Locations.Readings Taken by Licensee Upon Receipt of Packages + (20:03:44, 11 December 2024)
- ML20141G572 + (20:03:45, 11 December 2024)
- 05000413/LER-1997-004-02, :on 970514,inadequate Surveillance Determined. Caused by Interpretation of Conflicting TS Requirements. Station Procedures Revised to Ensure TS Surveillance 4.5.3.2 Is Met + (20:03:47, 11 December 2024)
- ML20141G569 + (20:03:48, 11 December 2024)
- ML20141G568 + (20:03:48, 11 December 2024)
- NRC-97-0064, Responds to NRC Re Violations Noted in Insp Rept 50-341/97-02.Corrective Actions:Returned Switch TCO/6 & CM & CF Breakers to pre-event Configuration + (20:03:49, 11 December 2024)
- ML20141G565 + (20:03:50, 11 December 2024)
- NG-97-1149, Forwards Response to RAI Re Resolution of Unresolved Safety Issue A-46 at DAEC + (20:03:50, 11 December 2024)
- ML20141G563 + (20:03:51, 11 December 2024)
- 0CAN079702, Informs That Bl Garrison,SOP-3087-6 & La McCarty,SOP-43073-3 No Longer Have Need to Maintain Operating License at Plant & Requests That Licenses Be Withdrawn + (20:03:52, 11 December 2024)
- ML20141G562 + (20:03:52, 11 December 2024)
- 05000312/LER-1986-004, :on 860215,review of Fire Door Refueling Interval Surveillance Test Results Revealed That Fire Doors Determined to Be Inoperable & Fire Watches Not Posted within 1 H.Caused by Personnel Error.Watches Posted + (20:03:54, 11 December 2024)
- FVY-85-123, Forwards Rev 11 to Physical Security Plan.Changes Made in Response to Stating That Portions of Change 10 Unacceptable Per 10CFR50.54(p).Rev Withheld (Ref 10CFR73.21) + (20:03:55, 11 December 2024)
- ML20141G557 + (20:03:55, 11 December 2024)
- ML20141G554 + (20:03:56, 11 December 2024)
- ML20141G553 + (20:03:57, 11 December 2024)
- ML20141G549 + (20:03:58, 11 December 2024)
- B16531, Part 21 Rept Re GE Commercial Grade Dedication Program Being Determined to Be Inadequate in Ability to Demonstrate Seismic Capability of Specific Relay.Returned Relays to GE Facility for Repair + (20:03:59, 11 December 2024)
- ML20141G548 + (20:03:59, 11 December 2024)
- ML20141G545 + (20:04:01, 11 December 2024)
- ML20141G546 + (20:04:01, 11 December 2024)
- IR 05000295/1985030 + (20:04:02, 11 December 2024)
- ML20141G542 + (20:04:02, 11 December 2024)
- 0CAN059701, Responds to NRC Re Violations Noted in Insp Repts 50-313/97-10 & 50-368/97-10.Corrective Actions:Info on Lessons Learned Issued to Sros,Tsc Directors & EOF Directors & Training Provided During Operations Training Cycle + (20:04:03, 11 December 2024)
- 05000277/LER-1997-003-03, :on 970601,HPCI Was Inoperable.Caused by Lifting of Common Power Wire Lug in HPCI Electrical Power Logic as Part of GP-25 Activity.Hpci Sys Was Restored to Operable Condition + (20:04:05, 11 December 2024)
- ML20141G538 + (20:04:06, 11 December 2024)
- ML20141G537 + (20:04:07, 11 December 2024)
- ML20141G533 + (20:04:07, 11 December 2024)
- 05000277/LER-1997-003, Forwards LER 97-003-00,concerning Inoperability of Hpcis When Wire Lug Was Lifted in Control Circuit on 970601 + (20:04:08, 11 December 2024)
- ML20141G529 + (20:04:10, 11 December 2024)
- 05000423/LER-1996-050, Revises Commitments Previously Submitted to NRC in LER 96-050-00 Re Range of Control Bldg Chilled Water Pump Gauges Used for Surveillance Not in Accordance W/Asme Chapter XI Requirements + (20:04:11, 11 December 2024)
- 05000245/LER-1996-009-01, :on 960109,isolation Condenser Makeup Water Temperature Below Design Basis Limit,Determined.Caused by Inadequate Design Specification.Preliminary Assessment of non-ductile Failure of Isolation Condenser Sys Performed + (20:04:16, 11 December 2024)
- ML20141G521 + (20:04:17, 11 December 2024)
- ML20141G519 + (20:04:18, 11 December 2024)
- 05000285/LER-1985-009, :on 851018,potential nonsingle-failure Proof Circuit Identified.Circuitry for MSIV Will Be Modified.Other Mods Performed During 1982-1983 Refueling Outage Will Be Examined + (20:04:19, 11 December 2024)
- ML20141G517 + (20:04:21, 11 December 2024)
- ML20141G509 + (20:04:22, 11 December 2024)
- ML20141G516 + (20:04:22, 11 December 2024)