Provides Summary of Activities at TMI-2 During First Quarter of 1997.Activities Included Completion of Surveillance Insp & Testing of RB Passive Breather Sys,Replacement of RB Fire Protection Sys W/New RB Fire Wire Detection Sys
ML20141G548
Person / Time
Site: Crane 
Issue date: 06/30/1997
From: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6710-97-2188, NUDOCS 9707090272
Download: ML20141G548 (2)


Text

.

L 0

/'

l GPU Nuclear. Inc.

(

Houte 441 South NUCLEAR Post Office Box 480 Middletown. PA 17057-0400 Tel 717-944-7621 June 30,1997 6710-97-2188 TO:

U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555 4

Dear Sir:

SUBJECT:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Possession Only License No. DPR-73 Docket No. 50-320 PDMS Quarterly Report The purpose of this letter is to provide the NRC a summary of the activities at TMI-2 during the 1st quarter of1997.

There was no inspection of the TMI-2 Reactor Building during the 1st quarter of 1997. The next inspection of the TMI-2 Reactor Building has been scheduled for June 1997.

1 Routine radiological surveys of the Auxiliary and Fuel Handling buildings during the 1st quarter did not i

identify any significant adverse radiological trends.

The Reactor Vessel temperature monitoring system reported the Reactor Vessel temperatures ranged from 49.9"F on January 8,1997 to 43.5* F on Febmary 20,1997. The Reactor Building temperature ranged from 40.l* F on January 22,1997 to 47.1* F on March 31,1997. The largest temperature difference between the Reactor Building and the Reactor Vessel occurred on January 20 and 21,1997, when the Reactor Building temperature was 5.6* F less than the Reactor Vessel temperature.

l

.A 00 I o

9707090272 970630 Su I!IlllllIllllltIlli,llijllll!

^**

=

080135 l

l

r l

.e, t

I l

Significant work activities conducted. during the 1st quarter of 1997 included completion of surveillance inspection and testing of the Reactor Building passive breather system, replacement of the l ~

Reactor Building Fire Protection System with the new Reactor Building Fire Wire Detection System and the performance' of routine preventative and corrective maintenance of the Auxiliary and Fuel Handling buildings ventilation systems. In addition, there were some minor repairs to the electrical distribution system. Dismantlement of non-radiological equipment continued with the dismantlement l

and removal of the Neutralizing tanks and other miscellaneous equipment from the Turbine Building.

t Please contact John Schork TMI Licensing Engineer (717) 948-8832 if you have any questions

~ recarding this report.

Sincerely, 1

Ws t

J. W. Langenbach JSS Vice President and Director, TMI -

L l