Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141G695 + (20:02:24, 11 December 2024)
- ML20141G694 + (20:02:24, 11 December 2024)
- IR 05000482/1997005 + (20:02:25, 11 December 2024)
- ML20141G688 + (20:02:26, 11 December 2024)
- 05000301/LER-1997-002-01, :on 970415,potential Reactor Coolant Sys Branch Connection Stresses Beyond Design Basis,Indicated.Caused by Mod Initiated to Remove RTD Bypass Line Isolation Valves. Stress Analysis Conducted on RTD Bypass Piping + (20:02:28, 11 December 2024)
- ML20141G684 + (20:02:30, 11 December 2024)
- ML20141G683 + (20:02:31, 11 December 2024)
- ML20141G678 + (20:02:31, 11 December 2024)
- ML20141G675 + (20:02:32, 11 December 2024)
- ML20141G677 + (20:02:32, 11 December 2024)
- ML20141G674 + (20:02:33, 11 December 2024)
- ML20141G670 + (20:02:36, 11 December 2024)
- ML20141G669 + (20:02:37, 11 December 2024)
- ML20141G668 + (20:02:37, 11 December 2024)
- ML20141G663 + (20:02:38, 11 December 2024)
- ML20141G659 + (20:02:39, 11 December 2024)
- ML20141G661 + (20:02:39, 11 December 2024)
- ML20141G658 + (20:02:40, 11 December 2024)
- 3F0797-09, Responds to NRC Re Violations Noted in Insp Rept 50-302/97-05.Corrective actions:Short-Term Instruction 97-010 Was Issued on 970404 to Restrict Issuance of Clearances + (20:02:43, 11 December 2024)
- ML20141G655 + (20:02:43, 11 December 2024)
- ML20141G651 + (20:02:44, 11 December 2024)
- ML20141G650 + (20:02:44, 11 December 2024)
- ML20141G648 + (20:02:45, 11 December 2024)
- ML20141G647 + (20:02:49, 11 December 2024)
- ML20141G643 + (20:02:53, 11 December 2024)
- ML20141G644 + (20:02:53, 11 December 2024)
- ML20141G641 + (20:02:54, 11 December 2024)
- RC-97-0131, Forwards Response to Violations Noted in Insp Rept 50-395/97-03.Corrective Actions:Slow Decrease in Reactor Bldg Pressure Was Observed by CR Operator Approx 25 Minutes After Alignment Error + (20:02:54, 11 December 2024)
- ML20141G639 + (20:02:55, 11 December 2024)
- ML20141G636 + (20:02:56, 11 December 2024)
- ML20141G634 + (20:02:57, 11 December 2024)
- ML20141G635 + (20:02:57, 11 December 2024)
- 05000369/LER-1985-034-01, :on 851102,reactor/turbine Trip on Steam Generator 1A lo-lo Level Occurred.Caused by Loss of Instrument Air Due to Rupture of Welded Seam on Flexible Pipe on Discharge Air Compressor B + (20:02:59, 11 December 2024)
- ML20141G628 + (20:03:00, 11 December 2024)
- ML20141G630 + (20:03:00, 11 December 2024)
- IR 05000305/1985018 + (20:03:06, 11 December 2024)
- ML20141G625 + (20:03:06, 11 December 2024)
- ML20141G620 + (20:03:10, 11 December 2024)
- ML20141G614 + (20:03:11, 11 December 2024)
- ML20141G616 + (20:03:11, 11 December 2024)
- ML20141G613 + (20:03:12, 11 December 2024)
- TAC:59830 + (20:03:12, 11 December 2024)
- ML20141G612 + (20:03:13, 11 December 2024)
- ML20141G611 + (20:03:14, 11 December 2024)
- ML20141G610 + (20:03:14, 11 December 2024)
- ML20141G601 + (20:03:20, 11 December 2024)
- 05000278/LER-1997-003-01, :on 970404,TS Noncompliance Due to Loss of 3C RFP High Water Level Trip,Occurred.Caused by Failure to Correlate Turbine/Reset Light Problem to Inoperability. Operating Shift Procedures Revised + (20:03:22, 11 December 2024)
- ML20141G598 + (20:03:23, 11 December 2024)
- 05000370/LER-1986-003-03, :on 860313,excessive RCS Leakage Discovered When Water Found Spraying from Valve 2NV-801.Valve 2NV-322 Also Found Leaking.Caused by Failed Valves 2NV-322,2NV-801, 2WL-1B & 2WL-2A + (20:03:25, 11 December 2024)
- LIC-97-0103, Responds to NRC Re Violations Noted in Insp Rept 50-285/97-11 on 970519-23.Corrective Actions:Revised Procedure OP-2A to Address Procedural Deficiency & Informed Plant Personnel of Event on 970611 + (20:03:26, 11 December 2024)
- ML20141G595 + (20:03:27, 11 December 2024)
- ML20141G593 + (20:03:27, 11 December 2024)