Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148A557 + (17:32:20, 11 December 2024)
- ML20148A550 + (17:32:21, 11 December 2024)
- ML20148A547 + (17:32:22, 11 December 2024)
- ML20148A549 + (17:32:22, 11 December 2024)
- ML20148A543 + (17:32:23, 11 December 2024)
- ML20148A540 + (17:32:24, 11 December 2024)
- ML20148A539 + (17:32:27, 11 December 2024)
- B16360, Submits Corrections to 1993 Annual Rept for Unit 3, Describing Changes Made,Per 10CFR50.59 & Section 6.9.1.2 of App a to License NPF-49 + (17:32:28, 11 December 2024)
- ML20148A535 + (17:32:29, 11 December 2024)
- ML20148A533 + (17:32:30, 11 December 2024)
- PNO-IV-97-026A, on 970507,shutdown Greater than 72 H After Manual Scram Update Made.Workers Removing Fire Seal Matl from Penetration in Turbine Bldg to Run Addl Cable Through Penetration in Accordance W/Authorized Station Mod + (17:32:31, 11 December 2024)
- ML20148A525 + (17:32:32, 11 December 2024)
- ML20148A531 + (17:32:32, 11 December 2024)
- ML20148A524 + (17:32:33, 11 December 2024)
- 05000424/LER-1987-072, :on 871121,Tech Spec Surveillance Re Readings from Plant Safety Monitoring Sys Data Displays Inadequately Performed.Caused by Inadequate Training of Auxiliary Plant Operator.Training Will Be Enhanced + (17:32:35, 11 December 2024)
- 05000267/LER-1978-030-03, /03L-0:on 780912,five Hydraulic Snubbers Found Inoperable.Caused by Empty Oil Reservoirs.Reservoirs Filled & Surveillance Interval Adjusted + (17:32:38, 11 December 2024)
- ML20148A507 + (17:32:42, 11 December 2024)
- ML20148A506 + (17:32:43, 11 December 2024)
- ML20148A503 + (17:32:44, 11 December 2024)
- 05000298/LER-1978-030-03, /03L-0:on 780815,13 Primary Containment Penetrations Not Leak Tested.Caused by Penetrations Not Identified During Preoperational Testing.Penetrations Will Be Added to Tech Spec Table 3.7.2 & Will Be Tested + (17:32:46, 11 December 2024)
- ML20148A500 + (17:32:47, 11 December 2024)
- ML20148A493 + (17:32:48, 11 December 2024)
- ML20148A496 + (17:32:48, 11 December 2024)
- ML20148A492 + (17:32:49, 11 December 2024)
- ML20148A489 + (17:32:50, 11 December 2024)
- ML20148A488 + (17:32:50, 11 December 2024)
- 05000298/LER-1978-030, Forwards LER 78-030/03L-0 + (17:32:52, 11 December 2024)
- ML20148A485 + (17:32:52, 11 December 2024)
- ML20148A481 + (17:32:53, 11 December 2024)
- 05000336/LER-1997-010-02, :on 970112,heavy Dummy Fuel Assembly & Handling Tool Weight Exceeded TS Limit Occurred.Caused by Weight of Handling Tool Never Considered to Be Part of Load.Temporary Measure & Appropriate Procedures Revised + (17:32:55, 11 December 2024)
- SNRC-1424, Forwards Shoreham Nuclear Power Station PRA W/Supplemental Containment Sys, in Response to NRC Questions.Requests Concurrence W/Quality Group Categorization by 880408 + (17:32:56, 11 December 2024)
- 05000336/LER-1997-010, Forwards LER 97-010-00,documenting Event Occurred at Unit 2 on 970112.Commitments Made within Ltr Listed + (17:32:57, 11 December 2024)
- ML20148A474 + (17:32:57, 11 December 2024)
- 05000267/LER-1988-003, :on 880211,reactor Scram Actuated on Neutron Flux Rate of Change High.Caused by Electrical Noise Induction in Wide Range Nuclear Instrumentation Channels. Noises Will Be Investigated & Suppressed + (17:32:59, 11 December 2024)
- ML20148A470 + (17:33:00, 11 December 2024)
- ML20148A467 + (17:33:01, 11 December 2024)
- ML20148A464 + (17:33:02, 11 December 2024)
- ML20148A466 + (17:33:02, 11 December 2024)
- ML20148A462 + (17:33:07, 11 December 2024)
- ML20148A461 + (17:33:07, 11 December 2024)
- ML20148A460 + (17:33:08, 11 December 2024)
- ML20148A459 + (17:33:08, 11 December 2024)
- ML20148A455 + (17:33:09, 11 December 2024)
- ML20148A454 + (17:33:09, 11 December 2024)
- ML20148A452 + (17:33:10, 11 December 2024)
- ML20148A450 + (17:33:11, 11 December 2024)
- ML20148A447 + (17:33:12, 11 December 2024)
- ML20148A448 + (17:33:12, 11 December 2024)
- NSD-NRC-97-5104, Forwards Rev 1 to PRA-GSR-004, Assessment of Potential Impact of Diffusion Flames on AP600 Containment Wall & Penetrations. Rept Revised to Incorporate Comments Received from NRC During 970207 Telcon + (17:33:13, 11 December 2024)
- ML20148A443 + (17:33:14, 11 December 2024)
- ML20148A442 + (17:33:14, 11 December 2024)
- ML20148A432 + (17:33:15, 11 December 2024)