Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148G979 + (16:35:23, 11 December 2024)
- ML20148G980 + (16:35:23, 11 December 2024)
- 05000395/LER-1987-030, :on 871229,fire Watch Not Established for Partially Open Fire Door.Caused by Personnel Error.Auxiliary Operator Involved Attended 880106 Mgt Review Board Meeting Re Incident & Will Brief Each Shift + (16:35:25, 11 December 2024)
- ML20148G974 + (16:35:27, 11 December 2024)
- ML20148G972 + (16:35:28, 11 December 2024)
- ML20148G970 + (16:35:29, 11 December 2024)
- NRC-88-3304, Forwards Proprietary Addendum 1 & Addendum 2 to Wapwr RESAR-SP/90 Pda Responses to NRC Questions 252.1-252.14 & 220.1-220.9,respectively.Encl Withheld (Ref 10CFR9.5(4)).Application for Withholding Encl + (16:35:29, 11 December 2024)
- ML20148G967 + (16:35:30, 11 December 2024)
- ML20148G964 + (16:35:31, 11 December 2024)
- ML20148G966 + (16:35:31, 11 December 2024)
- ML20148G963 + (16:35:32, 11 December 2024)
- PNO-I-88-010, on 880120,reactor Scrammed from 42% Power Based on Low Reactor Vessel Water Level.Caused by Equipment Operator Error.Nrc Dispatched Augmented Insp Team to Site to Review Generic Safety Implications of Event + (16:35:33, 11 December 2024)
- ML20148G960 + (16:35:33, 11 December 2024)
- 05000265/LER-1987-016-09, :on 871103,discovered That Steam Supply Valve Did Not Automatically Close as Required When Companion Steam Supply Valve Closed.Caused by Auxiliary Contact Binding. Contact Replaced + (16:35:35, 11 December 2024)
- ML20148G957 + (16:35:36, 11 December 2024)
- ML20148G955 + (16:35:38, 11 December 2024)
- ML20148G953 + (16:35:38, 11 December 2024)
- ML20148G952 + (16:35:39, 11 December 2024)
- ML20148G951 + (16:35:40, 11 December 2024)
- 05000373/LER-1988-001-09, :on 880222,RCIC Discovered That High Level Instrument 1B21-N101A Out of Tolerance,Per Tech Specs.Caused by Stripped Setpoint Locking Mechanism Screw.Temporary Sys Change Installed to Use Alternate Switch + (16:35:42, 11 December 2024)
- 05000458/LER-1987-034, :on 871221,full Reactor Scram Occurred Due to Manual half-scram & Intermediate Range Monitor Spike.Caused by Air Trapped in Instrument Ref Line.Unit Successfully Returned to Operation on 871223 + (16:35:44, 11 December 2024)
- ML20148G947 + (16:35:45, 11 December 2024)
- ML20148G945 + (16:35:46, 11 December 2024)
- ML20148G944 + (16:35:46, 11 December 2024)
- ML20148G943 + (16:35:47, 11 December 2024)
- ML20148G942 + (16:35:48, 11 December 2024)
- NPL-97-0301, Forwards Revs to Listed Sections of Pbnp Security Plan.Encl Withheld + (16:35:49, 11 December 2024)
- ML20148G941 + (16:35:49, 11 December 2024)
- 05000328/LER-1987-003, :on 870130,five Areas on Unit 2 Identified as Not Receiving Required ASME Section XI Pressure Test Insp. Caused by Procedural Error.Asme Section XI Procedures Revised + (16:35:54, 11 December 2024)
- ML20148G934 + (16:35:57, 11 December 2024)
- ML20148G936 + (16:35:57, 11 December 2024)
- ML20148G932 + (16:35:58, 11 December 2024)
- ML20148G930 + (16:36:02, 11 December 2024)
- ML20148G929 + (16:36:03, 11 December 2024)
- ML20148G927 + (16:36:04, 11 December 2024)
- 05000302/LER-1988-005, :on 880223,action Statement for Exceeding Containment Isolation Valve Stroke Time Not Entered.Caused by Personnel Error.Personnel Involved Counselled on Tech Spec Requirements + (16:36:05, 11 December 2024)
- ML20148G925 + (16:36:08, 11 December 2024)
- ML20148G924 + (16:36:11, 11 December 2024)
- ML20148G923 + (16:36:12, 11 December 2024)
- IR 05000322/1987020 + (16:36:14, 11 December 2024)
- IR 05000424/1988010 + (16:36:16, 11 December 2024)
- ML20148G919 + (16:36:17, 11 December 2024)
- ML20148G918 + (16:36:18, 11 December 2024)
- ML20148G916 + (16:36:18, 11 December 2024)
- ML20148G914 + (16:36:19, 11 December 2024)
- ML20148G913 + (16:36:19, 11 December 2024)
- CY-97-049, Forwards Rev 0 to Cyap Haddam Neck Plant Radiation Protection Improvement Plan, in Response to CAL 1-97-07 + (16:36:20, 11 December 2024)
- ML20148G911 + (16:36:21, 11 December 2024)
- 05000328/LER-1988-009-02, :on 880207 & 28,ESF Main Steam Line Isolation Actuation Occurred During Maint Activities.Caused by Improper Verification of Required Logic That Generates Signal.Operators Provided W/Addl Training + (16:36:23, 11 December 2024)
- ML20148G904 + (16:36:24, 11 December 2024)
- 05000346/LER-1988-006, :on 880222,Kaman Instrumentation Corp Notified Util of Software Algorithm Error in Kaman Radiation Monitors.Collection Time Counter Reset to Zero Every 48 H for Affected Monitors Until Software Corrected + (16:36:26, 11 December 2024)