ML20148G945
ML20148G945 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 03/24/1988 |
From: | Crutchfield D Office of Nuclear Reactor Regulation |
To: | Fraley R Advisory Committee on Reactor Safeguards |
References | |
IEB-88-002, IEB-88-2, NUDOCS 8803290272 | |
Download: ML20148G945 (2) | |
Similar Documents at Callaway | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K1051999-10-19019 October 1999
[Table view]Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS 1999-09-22 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20211H4441999-08-27027 August 1999
[Table view]Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20149G8571997-07-16016 July 1997 Notification of Licensee Meeting W/Util on 970815 to Discuss Failure to Perform SE IAW 10CFR50.59 Requirements Identified in Insp Rept 50-483/97-05 ML20141M0061997-05-30030 May 1997 Notification of Licensee Meeting W/Util in Steedman,Mo on 970702 to Discuss Results of Latest SALP ML20137X0131997-04-17017 April 1997 Notification of 970506-07 Meeting W/Une & Framatome Technologies in Toronto,Ontario,Canada to Discuss Destructive Exam Techniques Used at Ontario Hydro Technologies Pertaining to Installation of Electrosleeves ML20137W9811997-04-17017 April 1997 Notification of 970513-14 & 15 Meeting W/Une & Framatome Technologies in Lynchburg,Va to Witness Use of Ultrasonic Testing Equipment & Review Analysis Methods Pertaining to Framatome Electrosleeving Process ML20137Y2301997-04-16016 April 1997 Informs That Operator Licensing Exams Administered on 970224 -28 at Facility.Exam Rept Encl ML20137J6701997-04-0202 April 1997 Forwards Info Obtained Form 970402 Telcon Re GL-96-06 ML20137J6451997-04-0202 April 1997 Forwards Document on Docket 05000483 for Callaway Plant, Unit 1 ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134A8841997-01-24024 January 1997 Notification of 970220 Meeting W/Union Electric in Rockville MD to Discuss Union Preparation for 970609-12 Operational Safeguards Response Evaluation at Callaway Plant ML20134A0141997-01-22022 January 1997 Discusses 970115 Meeting W/Ue to Discuss Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Nonproprietary Version of Handout Matl Encl ML20132E2521996-12-18018 December 1996 Notification of 970114 Meeting W/Util in Rockville,Md to Discuss Union Electric Co Plans for Reload Design to Callaway Plant ML20132E5701996-12-17017 December 1996 Notification of 970115 Meeting W/Licensee in Rockville,Md to Discuss Nondestructive Exam Qualification Efforts to Date in Support of Staff Review of Amend Request That Would Allow Use of Framatome Electrosleeving Technology ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20056H0061993-08-31031 August 1993 Notification of 930908 Meeting W/Union Electric Company & Westinghouse Electric Corp in Rockville,Md to Discuss Licensee Plans & Scheduled Activities Re Upcoming Callaway Sixth Refueling Outage & 7 Cycle Reload ML20056G4341992-10-20020 October 1992 Informs That AIT Being Dispatched to Plant in Accordance W/ NRC Manual Chapter 0325.Forwards Final Charter to Evaluate Events Associated w/921016-17 Plant Loss of Annunciator Events ML20245L5291989-05-0303 May 1989 Summarizes NRR Insp of Noble Gas Monitors at Plant on 890412,to Obtain Understanding of Monitor Sys Improvement ML20245H8521989-04-28028 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Proposed Revs to Containment Vessel Structural Integrity Spec ML20245K2981989-03-0303 March 1989 Forwards FEMA Exercise Rept for 880606 partial-scale Exercise at Plant.Exercise Identified Six Deficiencies Which Have Been Adequately Corrected,Five Through Plan Revs & One Through Successful Remedial Exercise ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20154P3091988-09-27027 September 1988 Notification of 881005 Meeting W/Util in Rockville,Md to Discuss Licensee Presentation of Steam Generator Level Reactor Trip Mod for Plant ML20151H4281988-04-15015 April 1988 Informs of D Shepard Participation in Tabletop Review of Simulator Certification During Wk of 880425,per 880413 Telcon ML20148G9451988-03-24024 March 1988 Advises That ACRS Review of Proposed Power Uprating for Facility Complete,Based on Evaluation of Concern Raised in 880317 Memo.License Amend Will Be Issued Shortly 1999-08-27 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20211H4441999-08-27027 August 1999
[Table view]Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation ML20207C3391999-05-26026 May 1999 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal for Retake Exam Administered on 990416 ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl ML20205R8791999-04-20020 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Staff Review of Util Amend Application Requesting Approval of Electrosleeve Steam Generator Tube Repair ML20205K5601999-04-0707 April 1999 Notification of 990422 Meeting with Util in Rockville,Md to Discuss NRC Draft Safety Evaluation for Union Electric Co Amend Application Requesting Approval of Electrosleeve SG Tube Repair ML20204B3001999-03-15015 March 1999 Notification of Licensee Meeting with Util in Steedman,Mo on 990401 to Discuss Results of Plant Performance Review Completed on 990211.Meeting Open to Public ML20196F7121998-12-0101 December 1998 Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants ML20154B7031998-09-29029 September 1998 Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants ML20249C1321998-06-23023 June 1998 Notification of 980707 Meeting W/Union Electric Co in Rockville,Md to Discuss Status of NRC Review of Util Proposed Amend to Allow Use of Framatome Electrosleeve in Callaway Plant Sg,As Outlined in from NRC ML20248M0741998-06-0303 June 1998 Notification of Cancellation of 980611 Meeting W/Util in Rockville,Md to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway SG as Outlined in from NRC to Ue ML20248J6191998-06-0303 June 1998 Notification of 980615 Meeting W/Util in Region IV Ofc to Discuss Update on Maint Rule Program Changes & Improvements. Agenda Attached ML20248J0741998-06-0303 June 1998 Notification of 980611 Meeting W/Union Electric Co in Rockville,Maryland to Discuss Status of NRC Review of Ue Proposed Amend to Allow Use of Framatome Electrosleeves in Callaway Sgs,As Outlined in from NRC to Ue ML20248F6311998-05-29029 May 1998 Notification of Significant Licensee Meeting W/Util on 980616 in Arlington,Tx to Discuss Licensee Performance ML20217Q6011998-04-29029 April 1998 Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway ML20217F9511998-03-30030 March 1998 Notification of 980402 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Changes Made to Callaway Emergency Plans ML20236N6081998-03-11011 March 1998 Responds to Task Interface Agreement Re Callaway Performance of During Shutdown Surveillance Test Requirements W/Unit at-power ML20199C1531998-01-16016 January 1998 Notification of 980129 Meeting W/Util in Rockville,Md to Discuss NRC Staff Questions Re Licensee Interpretation of TS Required Shutdown Surveillance Testing ML20198C3801998-01-0202 January 1998 Notification of Licensee Meeting W/Util on 980121 to Discuss Radiation Protection Activities ML20203C4321997-12-0505 December 1997 Notification of 971209 Meeting W/Util to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20202B0711997-11-21021 November 1997 Notification of 980106 Meeting W/Util in Arlington,Texas to Discuss EP Plan Activities ML20199F5021997-11-14014 November 1997 Notification of 971120 Meeting W/Union Electric Co & Framatome Technologies in Rockville,Maryland to Discuss NRC Staff Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20212E8361997-10-30030 October 1997 Notification of Licensee Meeting W/Util on 971110 to Discuss Emergency Preparedness Plan Activities ML20217E0951997-09-26026 September 1997 Notification of 971007 & 08 Meeting W/Une in Monroeville,Pa to Discuss Shutdown Margin & Other Calculations Affected by Axial Offset Anomaly Being Experienced by Plant IR 05000483/19973011997-08-20020 August 1997 Forwards NRC Operator Licensing Exam Rept 50-483/97-301 (Including Completed & Graded Tests) for Tests Administered on 970627 ML20217H4351997-08-0101 August 1997 Notification of 970813 Meeting W/Listed Participants in Rockville,Md to Discuss NRC Questions Re Recent Licensee Submittals Associated W/Use of Framatome Electrosleeves ML20149G8571997-07-16016 July 1997 Notification of Licensee Meeting W/Util on 970815 to Discuss Failure to Perform SE IAW 10CFR50.59 Requirements Identified in Insp Rept 50-483/97-05 ML20141M0061997-05-30030 May 1997 Notification of Licensee Meeting W/Util in Steedman,Mo on 970702 to Discuss Results of Latest SALP ML20137X0131997-04-17017 April 1997 Notification of 970506-07 Meeting W/Une & Framatome Technologies in Toronto,Ontario,Canada to Discuss Destructive Exam Techniques Used at Ontario Hydro Technologies Pertaining to Installation of Electrosleeves ML20137W9811997-04-17017 April 1997 Notification of 970513-14 & 15 Meeting W/Une & Framatome Technologies in Lynchburg,Va to Witness Use of Ultrasonic Testing Equipment & Review Analysis Methods Pertaining to Framatome Electrosleeving Process ML20137Y2301997-04-16016 April 1997 Informs That Operator Licensing Exams Administered on 970224 -28 at Facility.Exam Rept Encl ML20137J6701997-04-0202 April 1997 Forwards Info Obtained Form 970402 Telcon Re GL-96-06 ML20137J6451997-04-0202 April 1997 Forwards Document on Docket 05000483 for Callaway Plant, Unit 1 ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20134A8841997-01-24024 January 1997 Notification of 970220 Meeting W/Union Electric in Rockville MD to Discuss Union Preparation for 970609-12 Operational Safeguards Response Evaluation at Callaway Plant ML20134A0141997-01-22022 January 1997 Discusses 970115 Meeting W/Ue to Discuss Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Nonproprietary Version of Handout Matl Encl ML20132E2521996-12-18018 December 1996 Notification of 970114 Meeting W/Util in Rockville,Md to Discuss Union Electric Co Plans for Reload Design to Callaway Plant ML20132E5701996-12-17017 December 1996 Notification of 970115 Meeting W/Licensee in Rockville,Md to Discuss Nondestructive Exam Qualification Efforts to Date in Support of Staff Review of Amend Request That Would Allow Use of Framatome Electrosleeving Technology ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20058G5441993-11-30030 November 1993 Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co ML20058F4391993-11-26026 November 1993 Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports ML20056H0061993-08-31031 August 1993 Notification of 930908 Meeting W/Union Electric Company & Westinghouse Electric Corp in Rockville,Md to Discuss Licensee Plans & Scheduled Activities Re Upcoming Callaway Sixth Refueling Outage & 7 Cycle Reload ML20056G4341992-10-20020 October 1992 Informs That AIT Being Dispatched to Plant in Accordance W/ NRC Manual Chapter 0325.Forwards Final Charter to Evaluate Events Associated w/921016-17 Plant Loss of Annunciator Events ML20245L5291989-05-0303 May 1989 Summarizes NRR Insp of Noble Gas Monitors at Plant on 890412,to Obtain Understanding of Monitor Sys Improvement ML20245H8521989-04-28028 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Proposed Revs to Containment Vessel Structural Integrity Spec ML20245K2981989-03-0303 March 1989 Forwards FEMA Exercise Rept for 880606 partial-scale Exercise at Plant.Exercise Identified Six Deficiencies Which Have Been Adequately Corrected,Five Through Plan Revs & One Through Successful Remedial Exercise ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20154P3091988-09-27027 September 1988 Notification of 881005 Meeting W/Util in Rockville,Md to Discuss Licensee Presentation of Steam Generator Level Reactor Trip Mod for Plant ML20151H4281988-04-15015 April 1988 Informs of D Shepard Participation in Tabletop Review of Simulator Certification During Wk of 880425,per 880413 Telcon ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda 1999-08-27 Category:NRC TO ACRS MONTHYEARML20148G9451988-03-24024 March 1988
[Table view]Advises That ACRS Review of Proposed Power Uprating for Facility Complete,Based on Evaluation of Concern Raised in 880317 Memo.License Amend Will Be Issued Shortly ML20238D9481987-09-0909 September 1987 Forwards Util 870331 Application for Amend to License NPF-30,revising Tech Specs to Support Operating at Increased Power Level from 3,411 to 3,565 Mwt.Acrs Rept Requested by 871015 Should Committee Elect to Review Application 1988-03-24 |
Text
,,
i
-t pn tec
- 'o UNITED STATES g
[\ g NUCLEAR REGULATORY COMMISSION 5oy.t . tj WASHINGTON, D. C. 20555
\j *N ****
/, March 24, 1988 MEMORANDUM FOR: Raymond F. Fraley, Executive Director Advisory Committee on Reactor Safeguards FROM: Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
SUBJECT:
COMPLETION OF ACRS REVIEW REGARDING THE CALLAWAY PLANT POWER UPRATING LICENSE AMENDMENT By memorandum dated February 23, 1988, NRR transmitted the draft Safety Evaluation Report for the subject license amendment to you for ACRS review.
In your March 17, 1988 memorandum to the Executive Director for Operations, you indicated that the Connittee had decided not to review the subject amendment, provided that concerns regarding steam generator performance at the higher power level were addressed by the staff.
The specific question raised by the Chairman of the ACRS Subcommittee on Reactor Operations in a March 11, 1988 telephone call with NRR staff concerned the implications of the July 15, 1987 steam generator tube rupture event at North Anna Unit 1 on the proposed power uprating for the Callaway plant. On February 5,1988, the staff issued NRC Bulletin No. 88-02, "Rapidly Prcpagating Fatigue Cracks in Steam Generator Tubes" to all licensees or applicants with plants of Westinghouse or Combustion Engineering design. In that ducument, the staff determined that steam generator tube denting at the upper support plate was a primary cause of the North Anna event. Specific-ally, steam generators having carbon steel support plates have been determined to be susceptible to tube denting, and only those Westinghouse plants with carbon steel support plates are required to take action in response to the bulletin. The Callaway plant steam generators have stainless steel upper support plates which greatly reduce the potential for tube denting and consequent tube rupture due to excessive vibration. The staff has therefore determined that the proposed uprating will not result in a measurable increase in the potential for a steam generator tube rupture at the Callaway plant. !
Contact:
T. Alexion, NRR/DRSP 492-1387 gDReo3290272 880324 p ADOCK 05000483 PDR
)
Raymond F. Fraley Based on our evaluation of the concern raised in your March 17, 1988 memorandum, we consider ACRS review of the proposed power uprating for the Callaway plant to be complete. We plan to issue the license amendment shortly.
4 Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation cc: T. Rehm, ED0 T. Alexion, NRR R. Hall, NRR A. Cappucci, NRR R. Savio, ACRS H. Alderman, ACRS ,
i u
j Distribution j
', Docket files; "s
,NRC & Local"PDRs j PDIII-3 r/f '
XEPerkins RHall PXreutzer TMurley JSniezek TMartin. NRR FMiraglia DMossburg(YT-889056)
- SEE PREVIOUS CONCURRENCE OFFICE: PDIII-3 PDIII-3 PDTSS/PTSB PDIII-3 SURNAME: PKreutzer* RHall/rl* Acappucc1* KEPerkins*
DATE: 03/15/88 03/18/88 03/21/88 03/18/88 0FFICE: AD/DRSP D/DRSP SURNAME: GHolahan* DCrutchfield*