Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148N590 + (15:55:56, 11 December 2024)
- ML20148N583 + (15:55:56, 11 December 2024)
- 05000331/LER-1978-030-01, /01T-0 on 780617:water Leak Found in Area of B Recirculation Sys N2A Inlet Nozzle Caused by Wall Crack in Nozzle Safe End.Lab Analysis Will Be Performed to Determine Cause of Cracking + (15:55:58, 11 December 2024)
- ML20148N578 + (15:55:59, 11 December 2024)
- 05000293/LER-1988-009, :on 880304,documentation for Completion of Surveillance Procedure 8.9.13 Not Located for Diesel Generator B.Cause Undetermined.Operating Supervisor Required to Log Initiation & Completion of Tests + (15:56:01, 11 December 2024)
- ML20148N570 + (15:56:02, 11 December 2024)
- ML20148N559 + (15:56:03, 11 December 2024)
- ML20148N545 + (15:56:03, 11 December 2024)
- ML20148N542 + (15:56:05, 11 December 2024)
- ML20148N536 + (15:56:05, 11 December 2024)
- ML20148N530 + (15:56:06, 11 December 2024)
- ML20148N535 + (15:56:06, 11 December 2024)
- ML20148N515 + (15:56:08, 11 December 2024)
- ML20148N510 + (15:56:08, 11 December 2024)
- ML20148N509 + (15:56:09, 11 December 2024)
- ML20148N502 + (15:56:10, 11 December 2024)
- ML20148N499 + (15:56:10, 11 December 2024)
- ML20148N497 + (15:56:11, 11 December 2024)
- ML20148N495 + (15:56:12, 11 December 2024)
- ML20148N492 + (15:56:13, 11 December 2024)
- ML20148N481 + (15:56:14, 11 December 2024)
- ML20148N471 + (15:56:15, 11 December 2024)
- ML20148N467 + (15:56:16, 11 December 2024)
- ML20148N459 + (15:56:17, 11 December 2024)
- ML20148N460 + (15:56:17, 11 December 2024)
- ML20148N453 + (15:56:18, 11 December 2024)
- NRC-88-0076, Forwards Updated Response to SALP 8 Board Rept,Per NRC 880202 Request.Most Actions Described in Util for Improving Performance Complete.Completion of Tech Spec Improvement Program Extended to 881231 + (15:56:19, 11 December 2024)
- ML20148N423 + (15:56:21, 11 December 2024)
- ML20148N422 + (15:56:21, 11 December 2024)
- ML20148N417 + (15:56:22, 11 December 2024)
- 05000302/LER-1997-002, :on 970129,out-of-calibr Fuel Storage Pool Water Level Transmitters Invalidated TS Surveillance.Caused by Lack of Commitment to & Mgt Oversight of Preventive Maint Program.Night Order Was Issued + (15:56:24, 11 December 2024)
- ML20148N411 + (15:56:25, 11 December 2024)
- IR 05000312/1978015 + (15:56:28, 11 December 2024)
- ML20148N404 + (15:56:28, 11 December 2024)
- ML20148N401 + (15:56:29, 11 December 2024)
- ML20148N390 + (15:56:30, 11 December 2024)
- ML20148N384 + (15:56:31, 11 December 2024)
- ML20148N386 + (15:56:31, 11 December 2024)
- ML20148N383 + (15:56:32, 11 December 2024)
- B16519, Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 2 + (15:56:33, 11 December 2024)
- ML20148N379 + (15:56:33, 11 December 2024)
- ML20148N372 + (15:56:34, 11 December 2024)
- 05000259/LER-1988-011-02, :on 880304,three Emergency Equipment Cooling Water Pumps Inadvertently Started Due to Pressure Drop in Raw Cooling Water Sys.Caused by Personnel Error in Not Performing Valve Lineup.Personnel Counseled + (15:56:36, 11 December 2024)
- ML20148N367 + (15:56:37, 11 December 2024)
- ML20148N365 + (15:56:38, 11 December 2024)
- 05000456/LER-1997-006-05, :on 970522,TS 3.0.3 Was Entered & Unit 1 Cooled Down Due to ECCS Venting Issue.Caused by Mgt Deficiency. Weekly Ultrasonic Exams of Piping Will Be Performed Until TS Is Changed + (15:56:40, 11 December 2024)
- ML20148N355 + (15:56:41, 11 December 2024)
- ML20148N347 + (15:56:42, 11 December 2024)
- ML20148N340 + (15:56:43, 11 December 2024)
- ML20148N333 + (15:56:45, 11 December 2024)
- 05000266/LER-1997-025, :on 970520,pressurizer Level Was Controlled Higher than Assumed in Accident Analysis.Caused by Inappropriately Changing Procedures W/O Adequate Consideration.Listed Affected Procedures Will Be Revised + (15:56:46, 11 December 2024)