--TlW T EC h-pf 4
UNITED STATES
[
NUCLEAR REGULATORY COMMisslON s
I y
REGION V Os SUITE 202 W ALNUT CREEK PLAZ A
't, 9
'N 0
1990 N. C ALIFORNIA BOULEVARD
+eee*
WALNUT CREEK, CALIFORNI A 94596 0CT 1 9 U m Docket No. 50-70 General Electric Company Vallecitos Nuclear Center P. O. Box 460 Pleasanton, California 94566 Attention: Mr. R. W. Darmitzel, Manager Irradiation Processing Product Section Gentlemen:
Subject:
NRC Inspection of GETR Modifications This refers to the inspection conducted by Messrs. T. W. Bishop and i
D. P. Haist of this office on September 26, 27 and 28,1978 of activities authorized by HRC License No. TR-1, and to the discussion of our findings held by the inspectors with Mr. R. W. Darmitzel and members of his staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection report.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, inter-views with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you submit a written application to this office, within 20 days of the date of this letter, requesting that such information be withheld from public disclosure.
The applica-tion must include a full statement of the reasons why it is claimed that the infonnation is proprietary. The application should be prepared so that any proprietary information identified is contained in an enclosure 7811270l>l
-- - - =
OCT 1 0 110 General Electric Company to the application, since the application without the enclosure will also be placed in the Public Document Room.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincerely, 1
m G. S. Spencer, Chief Reactor Construction and Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-70/78-08
-