Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149G868 + (14:29:53, 11 December 2024)
- B14720, Requests NRC Review & Approval of Revised Basis for Fire Protection Exemption + (14:29:57, 11 December 2024)
- ML20149G863 + (14:29:58, 11 December 2024)
- LIC-94-0227, Advises of Extension of Schedule for Performance of EDG Hot Weather Testing at Plant from During Summer of 1994 to Summer of 1995,or Subsequent Summers,As Conditions Permit + (14:29:58, 11 December 2024)
- ML20149G862 + (14:29:59, 11 December 2024)
- ML20149G858 + (14:30:00, 11 December 2024)
- ML20149G860 + (14:30:00, 11 December 2024)
- ML20149G856 + (14:30:02, 11 December 2024)
- ML20149G855 + (14:30:03, 11 December 2024)
- ML20149G853 + (14:30:03, 11 December 2024)
- ML20149G851 + (14:30:08, 11 December 2024)
- ML20149G849 + (14:30:09, 11 December 2024)
- ML20149G850 + (14:30:09, 11 December 2024)
- ML20149G847 + (14:30:10, 11 December 2024)
- ML20149G842 + (14:30:11, 11 December 2024)
- 05000498/LER-1988-005, :on 880110,inadequate Surveillance Performed on Control Room Intake Air Radioactivity Monitor.Caused by Procedure & Operator Errors.Procedures Will Be Revised & Addl Guidance Will Be Given to Operators + (14:30:13, 11 December 2024)
- ML20149G837 + (14:30:14, 11 December 2024)
- ML20149G834 + (14:30:15, 11 December 2024)
- ML20149G836 + (14:30:15, 11 December 2024)
- IR 05000413/1997007 + (14:30:16, 11 December 2024)
- ML20149G831 + (14:30:17, 11 December 2024)
- ML20149G828 + (14:30:18, 11 December 2024)
- ML20149G827 + (14:30:18, 11 December 2024)
- 05000440/LER-1988-005, :on 880107,reactor Protection Sys Bus Power Supply Transfer Resulted in RHR Shutdown Cooling Isolation. Caused by Personnel Error.Operating Personnel Counseled & Plant Instructions Will Be Enhanced + (14:30:20, 11 December 2024)
- ML20149G825 + (14:30:21, 11 December 2024)
- ML20149G823 + (14:30:22, 11 December 2024)
- ML20149G822 + (14:30:23, 11 December 2024)
- ML20149G820 + (14:30:24, 11 December 2024)
- NRC-94-4318, Forwards non-proprietary WCAP-14191, Scaling Analysis for AP600 Passive Containment Cooling Sys, & Proprietary WCAP-14190, Scaling Analysis for AP600 Passive Containment Cooling Sys.Proprietary Portion of Doc Sent to Westinghouse + (14:30:25, 11 December 2024)
- ML20149G814 + (14:30:25, 11 December 2024)
- B14999, Requests to Use Alternative to Section XI of ASME Boiler & Pressure Vessel Code for Unit 1,per 10CFR50.55a(a)(3) + (14:30:26, 11 December 2024)
- ML20149G813 + (14:30:26, 11 December 2024)
- ML20149G811 + (14:30:27, 11 December 2024)
- 05000312/LER-1987-048, :on 871228,discovered That Procedure Methodology Failed Adequately to Measure Actual Water Flow from Spray & Sprinkler Header.Caused by Misinterpretation of Tech Spec Requirements.Procedure Revised + (14:30:29, 11 December 2024)
- U-602359, Submits Response to Violations Noted in Insp Rept 50-461/94-14.Corrective Actions:B Diesel Fire Pump Fuel Oil Sampled & Analyzed for Presence of Particulate & None Found + (14:30:30, 11 December 2024)
- ML20149G806 + (14:30:31, 11 December 2024)
- ML20149G808 + (14:30:31, 11 December 2024)
- IR 05000327/1987075 + (14:30:33, 11 December 2024)
- ML20149G804 + (14:30:34, 11 December 2024)
- IR 05000424/1997004 + (14:30:35, 11 December 2024)
- ML20149G800 + (14:30:36, 11 December 2024)
- ML20149G798 + (14:30:37, 11 December 2024)
- ML20149G797 + (14:30:37, 11 December 2024)
- ML20149G795 + (14:30:38, 11 December 2024)
- ML20149G796 + (14:30:38, 11 December 2024)
- ML20149G792 + (14:30:39, 11 December 2024)
- ML20149G790 + (14:30:40, 11 December 2024)
- ML20149G787 + (14:30:40, 11 December 2024)
- ML20149G785 + (14:30:42, 11 December 2024)
- ML20149G786 + (14:30:42, 11 December 2024)
- ML20149G781 + (14:30:43, 11 December 2024)