Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20151A797 + (12:16:16, 11 December 2024)
- ML20151A789 + (12:16:17, 11 December 2024)
- ML20151A784 + (12:16:18, 11 December 2024)
- ML20151A779 + (12:16:19, 11 December 2024)
- ML20151A778 + (12:16:19, 11 December 2024)
- ML20151A775 + (12:16:20, 11 December 2024)
- PNO-I-88-072, on 880709,inboard MSIV Failed Full Closure Test.Subsequent Testing Indicated That Valve Stem May Be Separated from Valve Disc.Msiv Repair Estimated to Take 18 Days + (12:16:21, 11 December 2024)
- ML20151A770 + (12:16:21, 11 December 2024)
- ML20151A769 + (12:16:22, 11 December 2024)
- ML20151A768 + (12:16:22, 11 December 2024)
- PY-CEI-NRR-0835, Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) + (12:16:23, 11 December 2024)
- ML20151A758 + (12:16:24, 11 December 2024)
- ML20151A751 + (12:16:25, 11 December 2024)
- ML20151A757 + (12:16:25, 11 December 2024)
- IR 05000333/1988008 + (12:16:26, 11 December 2024)
- ML20151A745 + (12:16:27, 11 December 2024)
- ML20151A744 + (12:16:28, 11 December 2024)
- ML20151A737 + (12:16:29, 11 December 2024)
- ML20151A738 + (12:16:29, 11 December 2024)
- ML20151A730 + (12:16:30, 11 December 2024)
- ML20151A722 + (12:16:35, 11 December 2024)
- ML20151A724 + (12:16:35, 11 December 2024)
- ML20151A720 + (12:16:36, 11 December 2024)
- ML20151A717 + (12:16:36, 11 December 2024)
- PY-CEI-NRR-0830, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-22.Corrective Actions:Temporary Alteration Reevaluated & 10CFR50.59 Safety Evaluation Performed + (12:16:37, 11 December 2024)
- W3P88-0059, Advises That Exercise Objectives Meeting Scheduled for 880523 to Discuss 881012 Emergency Exercise Objective Prior to Submittal to NRC & FEMA + (12:16:38, 11 December 2024)
- ML20151A708 + (12:16:42, 11 December 2024)
- ST-HL-AE-2600, Requests That Encl Svc List Be Used for NRC Correspondence W/Util Re Facilities.List Replaces Previous Requests from Util for Distribution of Correspondence + (12:16:42, 11 December 2024)
- ML20151A705 + (12:16:43, 11 December 2024)
- ML20151A704 + (12:16:43, 11 December 2024)
- ML20151A702 + (12:16:44, 11 December 2024)
- ML20151A699 + (12:16:45, 11 December 2024)
- ML20151A695 + (12:16:45, 11 December 2024)
- BECO-88-063, Supersedes 870611 Response to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. All Valves on Encl Have Been Added to Inservice Testing Program & Satisfactorily Tested + (12:16:46, 11 December 2024)
- ML20151A693 + (12:16:46, 11 December 2024)
- ML20151A690 + (12:16:47, 11 December 2024)
- ML20151A688 + (12:16:48, 11 December 2024)
- ML20151A687 + (12:16:48, 11 December 2024)
- AECM-88-0066, Special Rept 88-001/0:on 880302,diesel Generator 12 Automatically Tripped on Low Lube Oil Pressure.Caused by Automatic Start Due to Lube Oil Pressure Fluctuations That May Occur During Engine Startup.Diesel Generator Tested + (12:16:49, 11 December 2024)
- ML20151A684 + (12:16:49, 11 December 2024)
- ML20151A682 + (12:16:50, 11 December 2024)
- ML20151A678 + (12:16:50, 11 December 2024)
- ML20151A674 + (12:16:51, 11 December 2024)
- ML20151A672 + (12:16:51, 11 December 2024)
- ML20151A671 + (12:16:52, 11 December 2024)
- ML20151A668 + (12:16:53, 11 December 2024)
- ML20151A670 + (12:16:53, 11 December 2024)
- ML20151A666 + (12:16:54, 11 December 2024)
- L-88-149, Forwards Response to NRC Re Violations Noted in Insp Repts 50-250/88-03 & 50-251/88-03.Interface Between Engineering & Const W/Security Being Improved.Response Withheld (Ref 10CFR2.790 & 73.21) + (12:16:55, 11 December 2024)
- ML20151A665 + (12:16:55, 11 December 2024)
- ML20151A663 + (12:16:56, 11 December 2024)
- ML20151A661 + (12:16:57, 11 December 2024)