Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CEO-88-113, Part 21 Rept Re Mfg Defect W/Gould Model PD3200 Pressure Transmitters.Three Failed Units Removed from Svc & Returned to Mfg for Analysis.Engineering Action Plan Formulated to Monitor Subj Transmitters & Replace Any Defective Devices + (10:02:23, 11 December 2024)
- ST-HL-AE-2568, Application for License to Receive,Possess,Return & Store Unirradiated Fuel Assemblies Required for Operation Per 10CFR50 Requirements + (10:02:25, 11 December 2024)
- ML20151U171 + (10:02:25, 11 December 2024)
- B12894, Advises That Tech Spec Rev Re Specific Distance for Taking Radiation Measurements in Areas Where Dose Rates Exceed 1,000 Mrem/H Will Be Processed & Submitted to NRC to Provide Improved & Consistent Program on High Radiation Areas + (10:02:26, 11 December 2024)
- ML20151U167 + (10:02:27, 11 December 2024)
- ML20151U169 + (10:02:27, 11 December 2024)
- ML20151U166 + (10:02:28, 11 December 2024)
- RBG-28434, Forwards Licensing Activities in Support of Facility Second Refueling outage.Nonoutage-related Activities Also Encl + (10:02:29, 11 December 2024)
- ST-HL-AE-2626, Responds to 880325 Notice of Violation 8804-01 Per 10CFR2.201.Corrective Actions Taken:Applicable Procedures for Filling Steam Generators Revised & Operators Trained & Confirmatory Testing Completed on Revised Procedures + (10:02:29, 11 December 2024)
- IR 05000348/1988002 + (10:02:30, 11 December 2024)
- ML20151U161 + (10:02:30, 11 December 2024)
- ML20151U158 + (10:02:31, 11 December 2024)
- ML20151U155 + (10:02:32, 11 December 2024)
- ML20151U157 + (10:02:32, 11 December 2024)
- ML20151U153 + (10:02:33, 11 December 2024)
- NLS8800416, Forwards Long-Term Plan for Code Qualification of Seismic Class 1S Pipe Supports Cooper Nuclear Station + (10:02:33, 11 December 2024)
- ML20151U150 + (10:02:34, 11 December 2024)
- ML20151U148 + (10:02:35, 11 December 2024)
- ML20151U146 + (10:02:37, 11 December 2024)
- ML20151U145 + (10:02:41, 11 December 2024)
- ML20151U144 + (10:02:41, 11 December 2024)
- ML20151U141 + (10:02:42, 11 December 2024)
- ML20151U140 + (10:02:43, 11 December 2024)
- ML20151U139 + (10:02:43, 11 December 2024)
- ML20151U137 + (10:02:44, 11 December 2024)
- ML20151U135 + (10:02:45, 11 December 2024)
- ML20151U134 + (10:02:46, 11 December 2024)
- ML20151U133 + (10:02:47, 11 December 2024)
- ML20151U128 + (10:02:48, 11 December 2024)
- ML20151U127 + (10:02:49, 11 December 2024)
- HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes + (10:02:50, 11 December 2024)
- ML20151U124 + (10:02:50, 11 December 2024)
- 05000324/LER-1985-014-02, :on 851231 & 860101,testing of Mod to Automatic Depressurization Sys Revealed That Sys Logic Timing Relays Out of Timing.Cause Not Determined.Relays Replaced.Setpoint Drift Will Be Evaluated in Future Testing + (10:02:52, 11 December 2024)
- ML20151U120 + (10:02:53, 11 December 2024)
- ML20151U118 + (10:02:54, 11 December 2024)
- ML20151U113 + (10:02:55, 11 December 2024)
- ML20151U111 + (10:02:55, 11 December 2024)
- ML20151U108 + (10:02:56, 11 December 2024)
- ML20151U107 + (10:02:57, 11 December 2024)
- LD-88-061, Provides Overview of Further Anticipated Changes to Facilities,Proposed for Next Two Yrs & Independent of Current Commitments to Upgrade Facilities.Requests Encl Be Withheld Per 10CFR2.790 + (10:02:58, 11 December 2024)
- 05000368/LER-1985-007, :on 850311,failure of Fire Door 448 to Meet Insp Acceptance Criteria Discovered.Caused by High Usage. Door Repaired.Frequency of Fire Door Insps for High Use Doors Implemented + (10:03:00, 11 December 2024)
- ML20151U104 + (10:03:01, 11 December 2024)
- ML20151U103 + (10:03:03, 11 December 2024)
- ML20151U102 + (10:03:04, 11 December 2024)
- ML20151U100 + (10:03:05, 11 December 2024)
- ML20151U098 + (10:03:05, 11 December 2024)
- 05000458/LER-1985-062, Corrected Ltr Forwarding LER 85-062-00.Tracking Number Changed to RBG-23042 + (10:03:06, 11 December 2024)
- ML20151U092 + (10:03:07, 11 December 2024)
- ULNRC-03889, Forwards Proposed Tech Specs Sections 1.0,2.0 & 3.0, Converting to Improved Tech Specs,In Response to NRC 980707 & 09 Rais.Response to Comment Number 1.1-4 Will Be Provided Separately After 980817 NRC Ltr to NEI Has Been Evaluated + (10:03:07, 11 December 2024)
- BSEP-88-0426, Forwards Vols I-III of Environ Surveillance Rept for 1987 + (10:03:08, 11 December 2024)
- ML20151U087 + (10:03:09, 11 December 2024)