WRRATIVE SGt9RY OF MJNIHLY OPERATING EXPERIENCE UNIT I JULY 1988 July 1 The Unit operated at a ncminal value of 100% output.
through July 17 July 18 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, the Unit's output was reduced to 85% cutput to repair a seal on the 'A' Cooling Tower Punp.
July 19 The Unit remained at 85% output.
July 20 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, the Unit was returned to a ncainal value of 100% cutput, July 21 The Unit operated at a ntninal value of 100% output.
through July 22 July 23 At 0941 hours0.0109 days <br />0.261 hours <br />0.00156 weeks <br />3.580505e-4 months <br />, the Unit's output was IM v'ad to a ncninal value of 90% cutput to repair a seal on the 'A' Cboling Tower Punp.
July 24 The Unit remained at 90% output.
July 25 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />, the
'A' Cooling 7bwer Punp was returned to service and power was asv-alated to a ntninal value of 100%
output.
July 26 The Unit operated at a ntninal value of 100% output.
through July 31 I
r 8908100433 000731 g
ADOCK050g34
,g PDR R
[
,6 OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
08/04/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JULY 1988
- 3. LICENSED THERMAL POWER (MW:):
2660
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5111.0 107399.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
744.0 3606.0 62790.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
744.0 3539.2 61193.4
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1941312.0 9010080.0 145927399.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
622450.0 2926059.0 46791779.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
586000.0 2741707.0 43667400.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 69.2 59.3
- 20. UNIT AVAIIABILITY FACTOR:(PERCENI) 100.0 69.2 59.3
- 22. UNIT CAPACITY FACTOR (DER): PCT 94.3 64.2 51.8
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 2.8 18.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE.DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY
_ N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
AVERAGE DAll UNIT ?OWER LEVEL DOCKET No.
30-33' UNIT - 37?S Uni: 41 DATE August 8, 1988 1
COMPLETED SY M*A. Winger nLEPHONE (412) 393-7621 l
MOMy JULY 1988 DAY AVERAGE DAILY POWER LEVE1.
DAY AVIRAGE DAILY POWER LEVEL i
1MWe,Neti
( MW,.N 821 779
,7 813 779 2
gg 804 715 3
g, 804 779 4
3 788 5
792 33 6
800 g
800 796 761 7
3 g
792 766 3
9 788 791 3
10 788 796 3
668 796 gg 792 788 1,.
23 796 783 13 779 792 g4 g
792 788 g3 3,
16 783 i
INSTRUCTIONS I
On this formai.hst the nerage daily unit power ine!:n uwe. Net far exh day in the reputting month.Coinnute eo Ihe nearest whole mepwas1.
i tW77)
-- ~
p_-.
UNif SHUIDOWNS AND POWER REDUCTIONS IMKKEi NO.
50-11/e UNIT NAME BVPS Unit #1 IDAIE - August 8, 1988 M.A.
Winger JULY 1988 COMrtEIEll aY REPOR T MONIH IEl ErtlONE (412)-393-7621 m
la cm
- me o 0,
- C.
Licensee Cause & Corrective 0
c No.
Date 3UE Event e
8 5E Action to R
- 5 I
f.E "
Report #
- E a0 Prevent Recurrence H
u
- mg yU 0
e 18 880718 F
0 A
5 N/A IIF PUMPXX Output reduced to 857. to repair a seal on the
'A' Cooling Tower Pump.
19 880723 F
0 A
5 N/A HF PUMPXX Oatput reduced to 907. to repair a seal on the
'A' Cooling Tower Pump.
I I
h 2
3 4
f f =.ed Reas.**
Hethod:
I.stulws G - Inseens si.ms S Siterdes cJ A Fileipnweet failmee(I aplassel g _n,,,,,, g I.
recpasase.m..a Iyasa e
8 Maisesenesace.e Tess 2-Manual scram I non Shuss I.w I eireis<c 0 PeI%
3-AueamatIc $ctam I Scu' R4*."8 8 I I N I I ele iNI 8R3 (.
13 Stryulasew) Stesseicti ese 4-Coatineed Fros'Fraetous Month Ol s.' I I 8hereatens isaiseaset A 1hesese lianuseatinise S-Be#wetion 3 Adeemsnisssasi.e 9-Other 5
- t. (Ipceae meal I se..e ll splassel I stuhes I - Luer %.us.c t*8/773 li thlece il spla I e
NARRATIVE SLPHARY OF ENIHLY OPERATING EXPERIDiCE UNIT II JULY 1988 July 1 The Unit operated at a ncminal value of 100% cutput.
thIrugh June 15 June 16 At 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />, the Unit's output was r M M to 85% to increase condenser vacuum.
At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, a power escalation was initiated ard at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br /> the Unit ~eturned to 100% output.
July 17 The Unit operated at a nceinal value of 100% output.
through July 26 July 27 At 1441 hours0.0167 days <br />0.4 hours <br />0.00238 weeks <br />5.483005e-4 months <br />, the Unit tripped inadvertently on 2 of 4 power range rate signals while troubleshooting a red control problen.
July 28 The reactor was taken critical at 0936 hours0.0108 days <br />0.26 hours <br />0.00155 weeks <br />3.56148e-4 months <br /> and the Unit was synchronized at 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br />. SihWy power cutpIt was escalated.
July 29 At 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />, the Unit's output returned to 100%.
July 30 The Unit operated at a ncminal value of 100% output.
through July 31 i
l
}
OPERATING DATA REPORT DOCKET NO.:
50-412 REPORT DATE:
08/04/88 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393-7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: JULY 1988
- 3. LICENSED THERMAL POWER (MWt):
2660
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
885
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
833
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
744.0 5111.0 6182.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
725.1 4672.1 5637.6
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS GENERATOR WAS ON LINE:
719.9 4638.0 5587.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MWH):
1881079.0 12012947.0 14398584.0
- 17. GROSS ELECT. ENERGY GEN. (MW) :
594000.0 3872900.0 4655100.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
561406.0 3661567.0 4399671.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 96.8 90.7 90.4
- 20. UNIT AVAIIABILITY FACTCR:(PERCENT) 96.8 90.7 90.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 90.3 85.7 85.1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 3.2 2.6 4.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PEPIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
AVERACE DALLY U. NIT ?OWER LIVEL 00CXIT NO.
50-412 UNIT BVPS Unit 2 DATE August 8, 1988 COMPLITTD SY M.A. Winger TELEPHONE (412) 393-7621 JULY 1988 MONTM DAY AVERAGE DAILY POWER LIVEL DAY AVDtAGE DAILY POWER LIVEL I MWe-Net)
IMWo Net) 777 806 g7 801 gg 785 3
798 39 789 4
793 20
.785 793 789 g
gg 789 793 6
789 789 7
3 789 798 3
3 789 789 9
,j 709 790 10 26 785 471 gg g
793 84 3
4 752 13 798 781 9
30 789 793 g3 3,
740 le IN31RUCT10NS On this format.hst the actne daily unit ;iiwar ir d in MWe. Net far each day in the repinting inienth. i'.inpute to the nearest whvie mapwatt.
01171 1
(
l
?
e UNif SHUIDOWNS AND POWER REDUCTIONS DOCKEi NO. 50-412 UNIT NAME.BVPS Unit 2 DATE August 8, 1988 JULY 1988 COMPLETEp gy M.A. WinRer REPORT MONIH ygg_tyggoNE 14L2)-393 M l
es s.
en w te O
'8 0*
0 0t Licensee Cause & Corrective c
o glo.
Date y$
7Ul Event Ie 5E Action to R
$5 I
f$"
Report #
=E aO Prevent Recurrence e
o a
gag gu 3
o sa 11 880716 F
0 A
5 N/A HC llTEXCII Unit's output was reduced to 857. to improve condenser vacuum.
12 880727 F
24.1 A
3 2-88-009 RB CONROD The Unit tripped inadvertently while troubleshooting a rod control problem.
J i
2 3,,, g,,,g.
4 I' I " ed Reas.m :
g.33,teet G inseem siims i
5 Lhrda cJ A-F,mposer,e r,eg,ecgg p,s.g g,,,,,,, g g,, p,,,,,e,.m ne Dasa s
g B Mahe e Tena m,,ai seram I noss sleeces8.w I e c m <c ORef%
3-Ansteestic Scram I scene Nrg..se eI i H B l ele iNI1R8 G H Regeelaeae) Resseksk" 4-Cent tassed Free' Prevtous floath tile'l I I (Jgereas., Teaineeng A Ikenw I masseseashe
$.g f.cgg.,
1 Adwee6sseme6.e
,_og i,,,
5
- l. Ugar:4se.nealies..eilaplassel I shaleis 1 Ssaw %=u.c l'8/77) 18 Delees Il ggdaent e
$YL
'Af M
Te:epher.a (41:; 09:4000 fn* '*g*,',0,*
August 8, 1988 Shlppingport, PA 15077-0004 Beaver Valley Power Station Unit 1 - Locket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthlv Ooeratirn Reoort i
U. S. Nuclear Regulatory h i m ion Document Control Desk Washington, D. C.
20555 Gentlemen:
In accordance with Appeniix A,
Technical Specifications, the Monthly Operatirg Report is subnitted for Unit 1 ard Unit 2 for the Inonth of July, 1988.
Very truly yours, J
. D. Sieber Vice President Nuclear Group 1md Enclosures cc: NRC Regional Office King of Prussia, PA
\\