Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20153F804 + (07:29:02, 11 December 2024)
- ML20153F801 + (07:29:03, 11 December 2024)
- ML20153F800 + (07:29:03, 11 December 2024)
- ML20153F798 + (07:29:04, 11 December 2024)
- ML20153F799 + (07:29:04, 11 December 2024)
- ML20153F796 + (07:29:05, 11 December 2024)
- ML20153F795 + (07:29:06, 11 December 2024)
- ML20153F794 + (07:29:06, 11 December 2024)
- ML20153F792 + (07:29:07, 11 December 2024)
- ML20153F791 + (07:29:07, 11 December 2024)
- ML20153F790 + (07:29:08, 11 December 2024)
- ML20153F789 + (07:29:08, 11 December 2024)
- ML20153F788 + (07:29:10, 11 December 2024)
- ML20153F787 + (07:29:11, 11 December 2024)
- ML20153F786 + (07:29:11, 11 December 2024)
- ML20153F785 + (07:29:12, 11 December 2024)
- ML20153F784 + (07:29:13, 11 December 2024)
- ML20153F783 + (07:29:14, 11 December 2024)
- ML20153F782 + (07:29:14, 11 December 2024)
- ML20153F778 + (07:29:15, 11 December 2024)
- AECM-88-0099, Special Rept 88-002/0:on 880405,diesel Generator Shutdown During Monthly Functional Surveillance Due to High Lube. Caused by Failed Power Elements in Temp Control Valve.Power Elements Replaced & Generator Tested & Returned to Svc + (07:29:16, 11 December 2024)
- ML20153F775 + (07:29:16, 11 December 2024)
- ML20153F772 + (07:29:17, 11 December 2024)
- ML20153F771 + (07:29:18, 11 December 2024)
- ML20153F769 + (07:29:18, 11 December 2024)
- ML20153F767 + (07:29:19, 11 December 2024)
- ML20153F766 + (07:29:20, 11 December 2024)
- ML20153F763 + (07:29:24, 11 December 2024)
- ML20153F761 + (07:29:25, 11 December 2024)
- ML20153F760 + (07:29:25, 11 December 2024)
- IR 05000382/1982014 + (07:29:26, 11 December 2024)
- SNRC-1497, Lists Actions Taken in Response to NRC Bulletin 88-007, Power Oscillations in Bwrs. Personnel in Ofc of Training Informed of Need to Incorporate Procedure Changes Into Reactor Operator & Shift Technical Advisor Training + (07:29:26, 11 December 2024)
- ML20153F756 + (07:29:27, 11 December 2024)
- ML20153F755 + (07:29:28, 11 December 2024)
- RBG-44624, Provides Notification of RBS Plans to Install Mod Which Replaces Existing Emergency Response Info Sys (Eris) Computer Sys with New Substantially Improved state-of-art Computer Sys + (07:29:28, 11 December 2024)
- ML20153F750 + (07:29:29, 11 December 2024)
- ML20153F748 + (07:29:33, 11 December 2024)
- 05000458/LER-1986-007, :on 860115,automatic Reactor Scram Occurred on High Water Level While Attempting to Line Up Feedwater Train B.Caused by Feedwater B Regulator Valve Open W/Controller Indicating Zero Demand + (07:29:38, 11 December 2024)
- ML20153F745 + (07:29:39, 11 December 2024)
- ML20153F746 + (07:29:39, 11 December 2024)
- ML20153F744 + (07:29:40, 11 December 2024)
- ML20153F743 + (07:29:41, 11 December 2024)
- 05000341/LER-1988-029, :on 880802,24 Hydraulic Control Unit Scram Inlet & Oulet Valves Opened Due to Deenergization of Associated Stated Valves.Caused by Improper Termination of Cable.Reactor Protection Sys Logic Reset + (07:29:44, 11 December 2024)
- L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure + (07:29:45, 11 December 2024)
- ML20153F739 + (07:29:46, 11 December 2024)
- CY-98-151, Responds to NRC Re Violations Noted in Insp Rept 50-213/98-03.Corrective Actions:Root Cause Team Has Determined That Shift Managers Initial Reportability Decision Was Not Correct + (07:29:49, 11 December 2024)
- ML20153F735 + (07:29:50, 11 December 2024)
- ML20153F734 + (07:29:51, 11 December 2024)
- ML20153F731 + (07:29:52, 11 December 2024)
- ML20153F728 + (07:29:54, 11 December 2024)
- ML20153F729 + (07:29:54, 11 December 2024)