._. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l Dubs Mer Company Hu R in ***
p0 ac,3);95 h e (% sident Charlotte, N C 2h242 Nxlear frods !'on (701p73 4331 DUKEPOWER August 25, 1988 f
U.S. Nuclear Regulatory Commission Document Control Desk I
Washington, D.C.
20555
Subject:
McGuire Nuclear Station Unit 2 Docket No. 50-370 4
McGuire 2/ Cycle 5 Reload-Peaking Factor Limit Report 1
Centlement i
no McGuire Unit 2 end of cycle 4 refueling outage has been completed with cycle 5 I
startup (initial criticality) achieved on July 26, 1988.
nis reload was accomplished under the provisions of 10CFR 50.59.
I Pursuant to Technical Specification 6.9.1.9 attached is the Peaking Factor Limit L
Report for McCuire Unit 2/ Cycle 5.
This repcrt provides the W(Z) functions that are to be used for RAOC operation during cycle 5.
Note that no Base Load operatson analysis was performed for this eyeg, and therefore the W(Z) functions for Base Ioad operation and the value for APL are not being provided. For RAOC d
operation, a set of data covering three specific burnup steps is provided which permits the determination of W(Z) at any cycle burnup through the use of three i
point interpolation.
Figures 1-3 are the W(Z) functions appropriate for RAOC operation.
The appropriate W(Z) function is used to confirm that the heat flux hot channel factor, Fq(s), will be limited to the values specified in the l
Technical Specifiestions.
Very truly yours, i
.Js Hal B. Tucker l
PmN/108/muf f
Attachment l
t 9070479 800825 ADOCK 05000370 p
l P
PNV
[
g l
, Document Control Desk August 25, 1988 Page 2 xc Dr. J. Nelson Crace, Regional Administrator U.S. Nuclear hegulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, CA 30323 Mr. Darl llood, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission a
Washington, D.C.
20555 Mr. W.T. Orders NRC Resident Inspector McGuire Nuclear Station 1
I l
l t
t L
4
f PEAKING FACTOR LIMIT REPORT POR MCCUIRE UNIT 2 CYCLE,5 RAOC OPERATION This Peaking Factor Limit Report is provided in accordance with Paragraph 6.9.1.9 of the McGuire Unit 2 Technical Specifications.
The McGuire Unit 2 Cycle S elevation dependent V(z) values for RAOC operation at beginning,saiddle, and near end of-life are shown in Figures 1 through 3, respectively. This information is sufficient to determine V(z) versus core height for Cycle 5 burtups in the range of 0 L*D/MTV to 13500 $*D/MTV through the use of three point interpolation.
V(z) values for PAOC operation were calculated using the method described in Part B of Reference 1.
The appropriate V(z) function is used to confirm that the heat flux hot channel factor, Fq(z), vill be limited to the Technical Specification values of:
[K(z)) for P > 0.50 and Fq(z) $
Fq(z) $ 4.64
[K(:)) for P $ 0.50 The appropriate elevation dependent V(z) values, when applied to a power distribution measured under equilibriu:n conditions, demonstrates that the initial conditions assumed in the 1DCA are met, along with the ECCS acceptance criteria of 10CFR50.46.
(1) VCAP.10216 P.A. Relaxation of Constant Axial Control - Fq Surveillance Technical Specification
HEIGHT SQL (F7.)
wt2)
- O.00000 1.0000
- O.20000 1.00C0
- O.40000 1.0000
- 0.60000 5.0000 j,$$
- O.80000 1.0000 1.0000 1.0000
'I 1.2000 1.0000 t.4000 1.0000 t.6000 1.0000 1,50 1.8000 1.5000 2.0000 1.4757 2.2000 1.4509 2.4000 t.4257 i
I 2.6000 1.3891
^'
{,fj 2.8000 1.3732 I
3.0000 1.3575 3.2000 1.3468 3.4000 1.3328 1,40 3.6000 1.3187 M-3.8000 1.3068 I
4.0000 1.2876 4
4.2000 1.3866
' ' y' l l 4.4000 1.2732 l
1.1$
4.6000 1.2583 4.8000 1.2418 L
I 5.0000 9.2239 1
5.2000 t.2052 l
5.4000 5.1881
~~-
5.6000 1.1781 l.%
5.800o 1.t000 m
6.0000 1.1889 N
6.2000 1.1992 wm
!l l L
l 6.4000 1.2070 1.2$
6.6000 1.2127 6.8000 1.2165 7.0000 1.2179 7.2000 1.2169 l
/,i,
- 7.4000 1.2127 3
7.6000 1.2053 1.20 7.8CCO 1.1975 8.0000 1.1890
,0 8.2000 1.1787 u,
l k l *,
- 8.4000 1.1694 1.1$
8.6000 1.1587 3
j
'f' l
8.8000 1.1447 d
9.0000 1.1389 i,,
9.2000 1.1430 9.4000 5.1513 i
i i 1.10 9.6 coo 1.1580 i i j
9.8000 1.1626 10.000 1.1674 i,
4 4
10.200
.1687 i
i 4
10.400 5 >000 i
i,
i 10.600 1.COOO 1.06 10.000 1.0000 j
i,
55.000 1.0000
- i 11.200 1.0000 l,
i,
15.400 1.000o
- 5.600 t.0000 1.00 0
2 4
6 8
10 12 11.800 1.0000 COPI HEIGHT (FEU)
' 2 o*
TOP BOTTOM FIGURE 1 MCGUIRE UNIT 2 CYCLE 5 RAOC W(Z) AT 150 MWD /MTU TOP AND BOTTOM 15% EXCLUDED AS PER TECH $PE0 4.2.2J.O
HEIGHT WOL (F7.)
W(Z)
- O.00000 t.0000 e
- 0.20000 1.0000
- 0.40000 t.0000
- O,60000 t.0000 1.30 --
- 0.00000 1.0000 I
g g i
j i
1.0000 1.0000 l
l l l
l 1
1.2000 1.0000 1.4000 1.0000 l g i
- 1. SON 1.0000 4*.'
I 1.8000 1.2872 1
I I
- l g l
2.0000 1.2752 i
a 2.2000 1.2432 1.N j
l 4
I I
2.4000 1.2G12 o
2.4000 1.2387 l
I 2.8000 1.0257 o
l el l
3.0000 1.2143 3.2000 1.2100 e
I i
l l I
4 a
3.4000 1.2156 g l g
g (l
l 3.6000 1.2239 3.8000 1.2212 i'b 4
le l l
'4 l
l I
4.0000 1.2364
^ ?+f[l l
1 l
l
- I 4.2000 1.2396
=
.o a
4.4000 1.2407 le,"
e,'e 1
4.6000 1.2396 e-e 4.8000 1.2362 4. '.
II 5.0000 1.2311
)pg.d j' l j l l
l 5.2000 1.2259 4
5.4000 1.2231 4
I I I I
I I
I 5.6000 1.22:2 r%
l l
1 j
i 5.8000 1.2440 6.0C00 1.2621 eq l
I I
I I
l 6.2000 1.2782 L
%s Sc l
l l
l l
6.4000 1.2916 6.6000 1.3023 I
I I I I
I I
6.0000 1 3099
)
l' I
I i
)
7.0000 1.3143 4
7.2000 1.3153 j
l 7.4000 1.3124 7.6000 1.3054 j
g 7.8000 1.2971 I
l S.0000 1.2876 e.2000 1.2754 j j g
u 8.4000 1.2621 g,jg l l l l 8.0000 1.2522 l l l
l 8.e000 1.24e3 l
I I
9.0000 1.2445 l
l l l l 9.2000 t.2309 9.4000 1.2320
- l 9.6000 1.2233 l
l i I
l l J
j
( l j l
l l
l t j 9.8000 1.2177 10.000 1.2204 i;
),($
l t
i l 1 I
i 10.200 1.2232 10.400 1.0000 j
g j
10.800 1.0000 l
l l
10.000 1.0000 11.000 1.0000 I
I I 11.200 i.0000 i
i I
11.400 1.0000 t i j
i l
i i
]
i 11.600 1.0000 1.CC
.1 0
2 4
6 8
10 12 i t. s 00 1.0000 CORE FEIGHT (FEET)
Top l
BCirioM t
i t
FIGURE 2 i
MCGUIRE UNIT 2 CYCLE 5 RAOC W(Z) AT 60M MWD /MTU TOP AND BOTTOM 15% EXCLUDED AS PER TECH SPE0 4.2.2.2.0 I
t
]
m.,
.m
o
- o HE I GM ECL (F7.)
W(2)
- O,00000 1.0000
- 0.20000 1.0000
- 0.40000 1.0000
- 0.60000 1.0000 1.40
- o.s0000 1.0000 I
1.0000 1.0000 I
I 1.2000 1.0000 1.4000 1.0000 1.6000
- 1. 0CCO h,",^
1.4000 1.2629 L
I 2.0000 1.252'
~
l.M 2.2000 1.24tt i l i
2.4000 t.2336 4
i 2.6000 1.2279 i
2.0000 1.2213 o
3.0000 1.2115 3.2000 1.2092 I
I i
3.4000 1.2232 I.M 3.6000 1.2390 l
i i
i l
3.8000 1.2519 i
Ie 4.0000 1.2629
['T* l 4.2000 1.2714 l j l
4.4000 1.2771 4.6000 1.2000 l i
,4.8000 1,.2004 n
a 1.25
,0000
.27 4
,4 i
7 g
'j,j 5.2000 1.2763 5.4000 1.2826 o'
I i I
5.6000 1.2977 i
, i 1
e S.0000 1.3166 1,,
6.0000 1.3330
^
I I 8 I g j en 6.2000 1.3454
'gg i
i I t l
I 6.4000 1.3550 g i j
6.6000 1.3629 i
IE 6.8000 1.3683 i !
7.0000 1.3697 6
7.2000 1.3C72 l
j 7.4000 1.3609 7 5000 i 3505
'15 l
7.8000 1.3352 i
8.0000 1.3172 i
{
8.2000 1.2979 s.4000 1.2740 I I i
8.6000 1.2542 j
i i i
S.0000 1.2485 l
9.0000 1.2433 j,10 g
9.2000 1.2348 i
f 6
{
l 9.4000 1.2261 9.6000 t.2847 i
9.8000 1.2054
}
l 1
10.200 1.2022 10.000 1.2049 l
i i i
i i i
10.400 1.0000 1.0$
g
, i 10.400 t.0000 l
i I
10.800 1.0000 11.000 1.0000 9
e 11.200 t.0000 I
11.400 1.0000
>l i
11.500 t.0000 1.C0 800
' 00 0
2 4
6 8
10 12
's',00o i
t,0000 CORE EIGHT (TEET)
Top BOTTOM FIGURE 3 MCGUIRE UNIT 2 CYCLE 5 RAOC W(Z) AT 12500 MWD /MTU T0P AND BOTTOM 15% ExCLuftD As PER TECH SPEC 4.212.G
- _.