Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154B884 + (06:34:42, 11 December 2024)
- ML20154B887 + (06:34:42, 11 December 2024)
- ML20154B883 + (06:34:43, 11 December 2024)
- IR 05000498/1988039 + (06:34:44, 11 December 2024)
- ML20154B882 + (06:34:44, 11 December 2024)
- ML20154B879 + (06:34:45, 11 December 2024)
- IR 05000424/1988014 + (06:34:46, 11 December 2024)
- ML20154B878 + (06:34:46, 11 December 2024)
- ML20154B874 + (06:34:47, 11 December 2024)
- B12985, Proposed Tech Specs Re Containment Isolation Valves + (06:34:48, 11 December 2024)
- ML20154B870 + (06:34:49, 11 December 2024)
- ML20154B872 + (06:34:49, 11 December 2024)
- ML20154B869 + (06:34:50, 11 December 2024)
- ML20154B868 + (06:34:51, 11 December 2024)
- ML20154B866 + (06:34:51, 11 December 2024)
- ML20154B864 + (06:34:52, 11 December 2024)
- ML20154B865 + (06:34:52, 11 December 2024)
- ML20154B862 + (06:34:53, 11 December 2024)
- ML20154B863 + (06:34:53, 11 December 2024)
- ML20154B861 + (06:34:54, 11 December 2024)
- ML20154B858 + (06:34:55, 11 December 2024)
- ML20154B859 + (06:34:55, 11 December 2024)
- ML20154B857 + (06:34:56, 11 December 2024)
- 3F0988-02, Forwards Info in Response to NRC Bulletin 85-005 Requiring That All Piping Supplies,Inc. & West Jersey Mfg Co. Supplied Matls Be Identified & Determination Made as to Suitability for Intended or Actual Applications + (06:34:57, 11 December 2024)
- ML20154B852 + (06:34:57, 11 December 2024)
- ML20154B851 + (06:34:58, 11 December 2024)
- ML20154B847 + (06:35:04, 11 December 2024)
- ML20154B848 + (06:35:04, 11 December 2024)
- ML20154B846 + (06:35:05, 11 December 2024)
- ML20154B844 + (06:35:06, 11 December 2024)
- ML20154B845 + (06:35:06, 11 December 2024)
- ML20154B841 + (06:35:07, 11 December 2024)
- U-601263, Forwards Schedules Reflecting Exam Dates to Support Initial Licensing & Upgrade Exams in Response to Generic Ltr 88-13, Operator Licensing Exams. Schedule for Requalification Exams Also Encl + (06:35:08, 11 December 2024)
- IR 05000027/1986001 + (06:35:08, 11 December 2024)
- ML20154B837 + (06:35:10, 11 December 2024)
- ML20154B836 + (06:35:11, 11 December 2024)
- IR 05000333/1998005 + (06:35:21, 11 December 2024)
- B13007, Proposed Tech Spec Changes Stating That Penalty for Undetected Fouling of Feedwater Venturis of 0.1% Is Added to Flow Measurement Uncertainty Values If Venturis Not Cleaned at Least Once Per 18 Months + (06:35:22, 11 December 2024)
- ML20154B831 + (06:35:23, 11 December 2024)
- ML20154B830 + (06:35:23, 11 December 2024)
- ML20154B829 + (06:35:24, 11 December 2024)
- ML20154B828 + (06:35:25, 11 December 2024)
- ML20154B827 + (06:35:25, 11 December 2024)
- PY-CEI-NRR-0440, Forwards Suppl to Info Provided in 860212 & 28 Ltrs Re Seismic Event Evaluation,Including Natural Frequency of Seismic Instrumentation Mounting Arrangement & Strong Motion Data from Aftershock + (06:35:26, 11 December 2024)
- U-601265, Ro:On 880901,HPCS Initiated & Injected Water Into Reactor for 28 During Maint Surveillance Activities on Reactor Water Level Transmitter.Injection Valve & HPCS Pump Secured. Notification of Unusual Event Lasted Approx 10 Minutes + (06:35:27, 11 December 2024)
- ML20154B822 + (06:35:28, 11 December 2024)
- ML20154B821 + (06:35:28, 11 December 2024)
- ML20154B819 + (06:35:29, 11 December 2024)
- ML20154B820 + (06:35:29, 11 December 2024)
- ML20154B817 + (06:35:33, 11 December 2024)
- 05000213/LER-1998-008, :on 980721,determined That Main Stack Radiation Monitor RMS-14B Samples Were Not Analyzed to Required Detection Level.Caused by Inadequate Design.Immediately Controlled Temp of Radiation Monitor Room.With + (06:35:35, 11 December 2024)
- ML20154B815 + (06:35:36, 11 December 2024)