.n VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 88-08 FOR THE MONTH OF AUGUST, 1988

,- 0) 1 Rev. 2

.0 of 1 8809140150 000031 PDR ADOCK 05000271 R

PNV g.2, tfl

= -.

OPERATING DATA REPORT DOCKET NO.

50-271_____

DATE 880910 COMPLETED BY G.A.

Wallin TELEPHONE (802)257-7711 OPERATING STATUS 1.

Unit Name Vermont Yankee NOTES:

2.

Reporting Period:

August i

3.

Licensed Thermal Power (MNt):

1593 4.

Nameplate Rating (Gross MWe):

540

)

5.

Design Electrical Rating (Net MWe): 514(oc) 504(cc) 6.

Maximum Dependable capocity(Grc is MWe): 535 l

7.

Masimum Dependable Capacity (Net MWe):

504 8.

If changes occur n capacity ratings (Items Number 3 through 7)since

)

last report, give reasons N/A j

,i 1

9.

Power level to which restrfcted, i f any(Net MWe):

~N/A i

10.

Reasons for restrictioto, if any:

NA I

i This Month Yr-to-Date Cumulative 11.

Hours In Roporting Period 744.00 5855.00

)

12.

Number Of Hours Reactor was Critical 666.00 5475.32 110320.68 j

13.

Reactor Reserve Shutdown Hours 0.00 0.00 0.00 i

14.

Mours Generator On-!.ine 640.85 5405.15 _

107674.42 15.

Unit Reserve Shutdown Hours 0.00 0.00 0.00 16.

Gross Therr31 Er orgy Generated (HWH) 990023.50 6397521.0_0 158138232.50 17.

Gross Electrical Energy Generated

_319539.00 2795644.qq 52635588.00 i

18.

Net Electrical EnerJy Generated (MWH)_299579.00 2660830.C0 49955917.00 19.

'Jn i t Service ractor 86.!4 92.32 77.03 seit Availability T&ctor 86.14 92.32 77.03 s.

]

21.

Unit Ca pacity Factor (Using MDC Net) _

78.34 79.89 90.1)1 70.91 l

22.

Unit Capacity Factor (Using DSR Net) 88.4 69.53 i

23.

Unit Forced Outage Rate 13.86 4.68 e777

)

i 24.

Shutdevns scheduled over next 5 months (Type, Dat3~, and Duration of Each): 1989 Refueling Outage scheduled to begin on re'uruary 11, 1989 I

i j

and conclude on April 8, 1989.

25.

If shut down at eno ol' report period, estimated date of startup: N/A 26.

Units In Test Status (r 1 r

  • .n comT?rcial operation): N/A Forecast Achieved INITIAL CR1.ICM,

'Y

)

INITIAL ELEC-irY j

COMMERCIAL a

f7DPr 0411.01 TS 0 411 'dev. 2 age 1 or 1 l

't No. 13.rO1.19F i

--+e

-.w-w or y

-,-g 9.r9,.,

--c


,yw,-,-

y

,y

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee DATE 880910 20MPLETED BY G.A.

Wallin TELEPHONE (802)237-7711 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE PAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

482 17.

484

~

2.

482 18.

488 3.

481 19, 491 4.

~180 20, 490 5.

479 21, 488

' ~ -

6.

480 22.

492 l

(

7.

480 23.

490 8.

483 24.

145 3

9.

482 25.

0 10.

478 26.

0 11.

476 27.

0 l

12.

478 28.

35

"~

~

13.

480 29.

366 i

J 14.

117 30.

432 15.

478 31.

461 16, 485 INSTRUCTIONS:

on th - format, l'st the average daily unit power level in MWe-Net for es day in the reporting month.

Compute to the nearest whole escavatt.

VYDPr 0411.02 DP 0411 Rev. 2 l

Page 1 of 1 RT No. 13.rO1.18V 1

J UNIT $NUTDOWNS AND POWER REDUCTIONS DOCKET No 50-271 REPORT MONTH AUGUST UNIT NAME Yermont Yankee DATE 890910 COMPLETED BT G.A. Wallin TELEPHONE ( 8 0 2 p 257 -7711 1

2 Method of License Syst.es Component I Cause and Corre : ive No.

unto Type Duration Reason Shutting Down Event Code Code Action to (hours)

Reactor 3

Reporth 4

5 Prevent Recurrenc.-

48-14 880814 5

0.00 N

4 N/A 38 CONROD Power reduction for a Control Rod Power Pattern Adjustment Reduction 86-15 480824 5

0.00 s,n*

4 N/A Rn ComRoD Control Rod esercasing and a Rod Power Pettern Exchange.

Reduction 48-16 a&us24 r

50.22 A

3 N/A Cr VALVE 4 increase in pramary system leakage caused by a packing lesk of RHR46A valve.

Valv+ was repacked.

&&-17 440827 r

$2.9)

A 1

N/A Cr V A L.' EX Unacceptable primary system leakags caused by packing leakage of RERIS

&nd 88 valves.

Valves were repacked.

88-14 880830 S

0.00 H

4 N/A kB CONROD Power redu7tton for & Control Rod Power Pattern Adjustment Reduction 1 r: Forced 2 Raassa:

3 Method:

e Exhibit G-Instructions S: Scheduled A-Equipment railure (Explain) 1s Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licenseo C-Refueller 3-Automatic Scram Event Report (6ER) File D-Regulateay Restriction 4-Other (Explain)

(NUREG 0161)

E-Operator Training and L conse Emanination F-Admiristrative 5 Enhabit I - Same Source VfDPr 0411.03 G-Ope r a' ien a l scror (Emplain)

M-(Emplaint Control Rod Pattern Exchange DF 0411 Rev. 2 Page 1 of 1 RT No.

13.F01.18W

DOCKET NO. 50-271 UNIT _ Vermont Yankee DATE_880910 COMPLETED BY G.A.

Wallin TELEPHONE _(802)257-7711 REPORT MONTH August

SUMMARY

OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 83.5% of rated thermal power for the month.

Gross electrical generation was 319,539 MWHe or 79.5% design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:

At the beginning of the reporting period the plant vaa operating at 99.7%

of rated tnermal power.

880814 At 0110 hours0.00127 days <br />0.0306 hours <br />1.818783e-4 weeks <br />4.1855e-5 months <br />, reduced power to 75% to perform a rod pattern adjustment. (See Unit Shutdowns and Power Reductions) 880814 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br />, completed the rod pattern adjustment and began a return to full power.

080824 At 0330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br />, initiated a power reduction to minimum recirculation flow to perform control rod exercising,a rod pattern exchange and investigate the cause of drywell leakage.

880824 At 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br />, initiated control rod exercising.

(See Unit Shutdowns and Power Reductions) 080824 At 0605 hours0.007 days <br />0.168 hours <br />0.001 weeks <br />2.302025e-4 months <br />, completed control rod exercising, and initiated a rod pattern exchange.

(See Unit Shutdowns and Power Reductions) 880824 At 0715 hours0.00828 days <br />0.199 hours <br />0.00118 weeks <br />2.720575e-4 months <br />, completed the rod pattern exchange.

880824 At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, manually shutting down to make repairs on the RHR46A valve which we.s causing primary system leakage.

(See Unit shutdowns and Power Reductions) 880824 At 1146 hours0.0133 days <br />0.318 hours <br />0.00189 weeks <br />4.36053e-4 months <br />, turbine-generator removed from the grid, t

880824 At 1405 hours0.0163 days <br />0.39 hours <br />0.00232 weeks <br />5.346025e-4 months <br />, the reactor was sub-critical.

880826 At 1608 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.11844e-4 months <br />, the reactor was critical and a return to full power 1

was initiated.

1 880827 At 0415 hours0.0048 days <br />0.115 hours <br />6.861772e-4 weeks <br />1.579075e-4 months <br />, the reactor was sub-critical to repair unacceptable primary system leaks originating from the RHRl8 and 88 valves.

(See Unit shutdowns and Power Reductions) 880828 At 0718 hnurs, the reactor was critical and a return to full posee was initiated.

080820 At 1855 hours0.0215 days <br />0.515 hours <br />0.00307 weeks <br />7.058275e-4 months <br />, the turbine-generator was phased to the grid.

880830 At 1710 hours0.0198 days <br />0.475 hours <br />0.00283 weeks <br />6.50655e-4 months <br />, reduced power to 62% to perform 3 rod pattern adjustment.

(See Unit Shutdowns and Power Reduce. ions) 880830 At 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br />, completed the rod pattern adjustment and began a return to full power.

l At the end of the reporting period the plant was operating at_99.8% of l

rated thermal power.

VYDPF 0411.04 DP 0411 Rev. 2

-l Page 1 of 1 RT No. 13.F01.18X

.o.s ff VERMONT YANKEE NUCLEAR POWER CORPOR ATION P. O. BOX 157 GOVERNOR IIUh"r ROAD VERNUN, VERMONT 05354 September 10, 1988 VYV 88-189 U.S.

Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C.

20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of August, 1988.

Very truly yours, VERMONT YINKEE NUCLEAR POWER CORP.

$t w f ', )

l Warren Murpby Vice President a Managet of Operat ns l

cc:

1) USNRC l

Region I 475 Allendhle Road King of Prussia, PA 19406

2) USNRC Resident Inspector, VYNPS DE 0411 Rev. 2 Page 1 of 1 l