Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20154S238 + (03:48:02, 11 December 2024)
- ML20154S237 + (03:48:03, 11 December 2024)
- IR 05000333/1988013 + (03:48:04, 11 December 2024)
- ML20154S230 + (03:48:05, 11 December 2024)
- ML20154S231 + (03:48:05, 11 December 2024)
- ML20154S228 + (03:48:06, 11 December 2024)
- ULNRC-03908, Forwards Response to NRC RAI Re Proposed Amend to License NPF-30,converting to Improved Tech Specs.Proposed Sections 3.1,3.2,3.4,3.5 & 5.0 Also Encl + (03:48:07, 11 December 2024)
- ML20154S225 + (03:48:07, 11 December 2024)
- RA98-817, Provides 10CFR70.50 Written Rept as follow-up to C-E 980925 Initial Rept to NRC Operations Ctr Re Yellowish Residue Noticed on Asphalt Driveway Between Bldg 230 & Bldg 240 on 980924.No Mfg Equipment Failed or Malfunctioned + (03:48:09, 11 December 2024)
- ML20154S223 + (03:48:10, 11 December 2024)
- ML20154S220 + (03:48:10, 11 December 2024)
- IR 05000327/1988022 + (03:48:11, 11 December 2024)
- ML20154S219 + (03:48:11, 11 December 2024)
- ML20154S214 + (03:48:12, 11 December 2024)
- ML20154S213 + (03:48:12, 11 December 2024)
- ML20154S210 + (03:48:13, 11 December 2024)
- ML20154S208 + (03:48:14, 11 December 2024)
- ML20154S209 + (03:48:14, 11 December 2024)
- ML20154S205 + (03:48:15, 11 December 2024)
- ML20154S206 + (03:48:15, 11 December 2024)
- ML20154S199 + (03:48:16, 11 December 2024)
- ML20154S202 + (03:48:16, 11 December 2024)
- ML20154S198 + (03:48:17, 11 December 2024)
- ML20154S197 + (03:48:20, 11 December 2024)
- 05000333/LER-1986-001, :on 860302,at 100% Power,Flow Bias Functional Test Discovered Not Performed Since 850609.Caused by Inadvertent Schedule Ommission While Shifting Between Run & Not Run Mode Testing.Audit Performed + (03:48:22, 11 December 2024)
- ML20154S194 + (03:48:24, 11 December 2024)
- IR 05000266/1988011 + (03:48:25, 11 December 2024)
- ML20154S192 + (03:48:25, 11 December 2024)
- 05000528/LER-1985-056, :on 850802,containment Spray Sys Intentionally Isolated After Spurious Actuations.Caused by Corroded Contacts on Main Control Board Manual Initiation Switch. Switch Replaced + (03:48:27, 11 December 2024)
- ML20154S188 + (03:48:29, 11 December 2024)
- W3P88-1261, Forwards Rev 6 to Pump & Valve Inservice Test Plan, Consisting of Five Addl Relief Requests & Enhancements & Additions to Plan.Summary of Changes to Plan Also Encl.Fee Paid + (03:48:30, 11 December 2024)
- 05000272/LER-1986-006, :on 860220,reactor Trip Occurred When Steam Generator Water Level Signal Drifted Closed.Caused by Broken Wire to Solenoid Valve Damaged During Installation. Connections on All Subj Valves Replaced + (03:48:32, 11 December 2024)
- ML20154S184 + (03:48:33, 11 December 2024)
- ML20154S185 + (03:48:33, 11 December 2024)
- ML20154S183 + (03:48:34, 11 December 2024)
- ML20154S182 + (03:48:34, 11 December 2024)
- ML20154S181 + (03:48:35, 11 December 2024)
- IR 05000266/1988010 + (03:48:36, 11 December 2024)
- ML20154S174 + (03:48:38, 11 December 2024)
- ML20154S178 + (03:48:38, 11 December 2024)
- ML20154S173 + (03:48:39, 11 December 2024)
- NPL-98-0772, Informs NRC of ISI Activities Planned for Point Beach Nuclear Plant Unit 2.Copy of ASME Section XI Exams for Pbnp Unit 2 Refueling Outage 23 Scheduled for 981204-990210 Encl.Exam in Containment Will Be Performed During Outage + (03:48:40, 11 December 2024)
- ML20154S165 + (03:48:42, 11 December 2024)
- ML20154S162 + (03:48:43, 11 December 2024)
- ML20154S164 + (03:48:43, 11 December 2024)
- ML20154S160 + (03:48:54, 11 December 2024)
- ML20154S158 + (03:48:55, 11 December 2024)
- ML20154S157 + (03:48:55, 11 December 2024)
- ML20154S156 + (03:48:56, 11 December 2024)
- ML20154S152 + (03:48:57, 11 December 2024)
- ML20154S153 + (03:48:57, 11 December 2024)
- ML20154S150 + (03:48:58, 11 December 2024)