Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155B830 + (03:20:03, 11 December 2024)
- L-88-249, Forwards Meeting Agenda,Summary of Meeting Agreements & Viewgraphs Re 880218 Meeting W/Nrc in Rockville,Md Re Status of Physical Security Improvements at Plant.W/O Agenda. Encls 2 & 3 Withheld (Ref 10CFR2.790) + (03:20:04, 11 December 2024)
- IR 05000353/1988200 + (03:20:13, 11 December 2024)
- ML20155B825 + (03:20:14, 11 December 2024)
- ML20155B823 + (03:20:15, 11 December 2024)
- ML20155B824 + (03:20:15, 11 December 2024)
- ML20155B820 + (03:20:16, 11 December 2024)
- ML20155B819 + (03:20:17, 11 December 2024)
- ML20155B818 + (03:20:18, 11 December 2024)
- ML20155B817 + (03:20:18, 11 December 2024)
- ML20155B812 + (03:20:19, 11 December 2024)
- ML20155B813 + (03:20:19, 11 December 2024)
- ML20155B811 + (03:20:20, 11 December 2024)
- ML20155B809 + (03:20:21, 11 December 2024)
- ML20155B810 + (03:20:21, 11 December 2024)
- ML20155B807 + (03:20:22, 11 December 2024)
- ML20155B802 + (03:20:23, 11 December 2024)
- ML20155B804 + (03:20:23, 11 December 2024)
- 05000295/LER-1986-012-01, :on 860311,reactor Tripped from 100% Power. Caused by Open Reactor Trip Breaker During Performance of Test While Interlock Cell Switch Closed & Training Inadequate.Reactor Trip Breaker Removed + (03:20:25, 11 December 2024)
- ML20155B799 + (03:20:26, 11 December 2024)
- ML20155B798 + (03:20:27, 11 December 2024)
- ML20155B797 + (03:20:27, 11 December 2024)
- ML20155B795 + (03:20:28, 11 December 2024)
- ML20155B789 + (03:20:30, 11 December 2024)
- ML20155B788 + (03:20:30, 11 December 2024)
- ML20155B787 + (03:20:31, 11 December 2024)
- ML20155B786 + (03:20:32, 11 December 2024)
- ML20155B782 + (03:20:32, 11 December 2024)
- ML20155B781 + (03:20:33, 11 December 2024)
- ML20155B774 + (03:20:34, 11 December 2024)
- ML20155B777 + (03:20:34, 11 December 2024)
- ML20155B772 + (03:20:35, 11 December 2024)
- ML20155B771 + (03:20:36, 11 December 2024)
- 05000361/LER-1998-021, :on 980903,train B Ecw Chiller Failed to Start Using CR Start Push Button.Caused by Incorrect Wiring of Switch by Personnel.Wiring Was Corrected & Chiller Was Declared Operable on 980926 + (03:20:38, 11 December 2024)
- ML20155B763 + (03:20:44, 11 December 2024)
- 05000361/LER-1998-020, :on 980806,determined That Ecw Sys Was Inoperable.Caused by Faulty Temp Control Unit.Temp Control Unit Was Replaced & Chiller Performed Satisfactorily + (03:20:46, 11 December 2024)
- ML20155B759 + (03:20:47, 11 December 2024)
- ML20155B757 + (03:20:48, 11 December 2024)
- ML20155B755 + (03:20:48, 11 December 2024)
- ML20155B752 + (03:20:49, 11 December 2024)
- ML20155B753 + (03:20:49, 11 December 2024)
- NRC-88-0225, Application for Amend to License NPF-43,modifying Tech Spec 3/4.7.1.5 Re UHS for Emergency Equipment Cooling Water & Svc Water Sys.Fee Paid + (03:20:50, 11 December 2024)
- ML20155B748 + (03:20:51, 11 December 2024)
- ML20155B749 + (03:20:51, 11 December 2024)
- ML20155B746 + (03:20:52, 11 December 2024)
- ML20155B740 + (03:20:53, 11 December 2024)
- ML20155B739 + (03:20:54, 11 December 2024)
- ST-HL-AE-2796, Clarifies Misunderstanding Re Operational Readiness Review Observation 10 on Possible Friction Between Operations & Training Staff at Plants.Concept of Rotating Plant Personnel Into Different Assignments Embodied in Nuclear Group Polic + (03:20:55, 11 December 2024)
- ML20155B736 + (03:20:56, 11 December 2024)
- ML20155B734 + (03:20:57, 11 December 2024)
- ML20155B732 + (03:20:58, 11 December 2024)