ML20155B802
| ML20155B802 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/10/1988 |
| From: | Cockfield D PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8806130354 | |
| Download: ML20155B802 (1) | |
Text
SAFEGUARDS JNF.ORMAT.10N s
l<
~
~
e Portland General ElectricCompany t
I~
David W. Cockfield Vice President, Nuclear June 10, 1988 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555
Dear Sir:
Security Force Training and Qualification Plan Revision 6 In accordance with the provisions of Part 50.54(p) of Title 10 of the code of Federal Regulations [10 CFR 50.54(p)) changes to the Security Force Training and Qualification Plan (PGE-1024) for the Trojan Nuclear Plant have been implemented. Our evaluation has determined that these changes do not decrease the safeguards effectiveness of the Security Program. is a detailed description of the changes, along with a discus-sion of the reasons for making the changes.
Also enclosed are four copies of Attachment 2 which contains replacement pages for the Plan. Two sotr of replacement pages are also being forwarded to the Regional Administrator, Region V.
Attachments 1 and 2 contain Safeguards Information of a type specified in 10 CFR 73.21.
Sincerely.
Attachments c:
Mr. John B. Martin (2)
Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. William Dixon State of Oregon
)[
Department of Energy I
l Mr. R. C. Barr (w/o Attachment 2)
NRC Resident Inspector Trojan Nuclear Plant SAFEGUARDS INFORMATION
!$0'*$$$$$ $$88$@y uncussirico watra stranATto rncu cx:ccunnos F
. J M.. _,..
a Own 97204
_ _ _ _ _ _ _ _ _ _ _ - _ _ _ -.