Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155G036 + (02:22:09, 11 December 2024)
- BECO-88-142, Forwards Revised Emergency Plan,Evacuation Time Estimates & Emergency Plan Implementing Procedures Effective 881001. Changes Made to Emergency Plan to Reflect Restructured Emergency Response Organization & Upgraded Facilities + (02:22:10, 11 December 2024)
- ML20155G030 + (02:22:10, 11 December 2024)
- ML20155G029 + (02:22:11, 11 December 2024)
- 05000322/LER-1988-014, :on 880907,reactor Trip & ESF Actuation Occurred During Drywell Bypass Leakage Test.Caused by Test & Calibr Modules Not Properly Bypassed.Procedure Change Notice Re Hold Off Tags Submitted + (02:22:13, 11 December 2024)
- ML20155G024 + (02:22:14, 11 December 2024)
- ML20155G020 + (02:22:19, 11 December 2024)
- ML20155G018 + (02:22:20, 11 December 2024)
- 05000346/LER-1988-009, :on 880404,inoperable Fire Barrier Existed W/No Detection on Either Side & Continuous Fire Watch Not in Place.Caused by Personnel Error During Initial Fire Watch Evaluation.Continuous Fire Watch Posted + (02:22:22, 11 December 2024)
- ML20155G016 + (02:22:23, 11 December 2024)
- ML20155G013 + (02:22:24, 11 December 2024)
- ML20155G014 + (02:22:24, 11 December 2024)
- ML20155G012 + (02:22:25, 11 December 2024)
- 05000260/LER-1988-007-03, :on 880904,start of Reactor Protection Sys (RPS) Generator Set 2A Resulted in Loss of Power to RPS Bus 2A.Caused by Personnel Error.Half Scram & Isolations Reset & Sys Returned to Normal + (02:22:28, 11 December 2024)
- AECM-86-0104, Forwards Nuclear Mutual Ltd Certificate of Insurance + (02:22:29, 11 December 2024)
- ML20155G008 + (02:22:29, 11 December 2024)
- ML20155G006 + (02:22:30, 11 December 2024)
- ML20155G000 + (02:22:34, 11 December 2024)
- 05000320/LER-1988-009, :on 880513,flushing Operation Performed Using Borated Water Storage Tank/Fuel Transfer Canal Fill Sys. Caused by Personnel Error.Flushing Activity Terminated & Control Room Notified + (02:22:36, 11 December 2024)
- ML20155F998 + (02:22:38, 11 December 2024)
- CY-98-183, Forwards Revised License Amend 193 TS Pages to Correct Amend Number on Pages Not Changed by Amend 193.No Commitments Contained within Ltr + (02:22:39, 11 December 2024)
- ML20155F996 + (02:22:39, 11 December 2024)
- PNO-I-86-033, on 860423,during Restart from Steam Generator Tube Insp Outage,Reactor Tripped from 8% Power on High RCS Pressure.Caused by Main Feedwater Transient in Which turbine-driven Pump Decreased Speed + (02:22:40, 11 December 2024)
- ML20155F992 + (02:22:41, 11 December 2024)
- ML20155F994 + (02:22:41, 11 December 2024)
- ML20155F985 + (02:22:42, 11 December 2024)
- ML20155F983 + (02:22:43, 11 December 2024)
- ML20155F981 + (02:22:44, 11 December 2024)
- NUREG/CR-4214, Comments on Quantification of Public Health Risks.Nrc Should Be Encouraged to Use Health Effects Models Noted in NUREG/CR-4214 & SECY-86-8 in Preparation of Environ Assessment & Pra.Addl Comments Provided + (02:22:45, 11 December 2024)
- ML20155F977 + (02:22:45, 11 December 2024)
- ML20155F975 + (02:22:46, 11 December 2024)
- CY-98-140, Provides Commitment to Maintain Water Chemistry Requirements in HNP Technical Requirements Manual + (02:22:47, 11 December 2024)
- ML20155F974 + (02:22:47, 11 December 2024)
- CY-98-199, Forwards Listing of Corrections Made & Revised Pages for Proposed License Amend 193.Ltr Also Transmits Repaginated Pages for TS Index & Section 1,per Request of NRC Project Manager + (02:22:49, 11 December 2024)
- ML20155F960 + (02:22:49, 11 December 2024)
- ML20155F955 + (02:22:50, 11 December 2024)
- ML20155F957 + (02:22:50, 11 December 2024)
- 05000440/LER-1988-034, :on 880903,unexpected Automatic Start of Div 1 Diesel Generator Bldg Ventilation Sys Occurred.Caused by Failure of 125/24-volt Dc Converter in Control Circuitry. Converter Replaced & Retests Satisfactorily Performed + (02:22:55, 11 December 2024)
- PY-CEI-NRR-0920, Forwards LERs 88-033-00 & 88-034-00 + (02:22:56, 11 December 2024)
- ML20155F953 + (02:22:56, 11 December 2024)
- 3F1098-15, Rev 0 to LAR 245 to License DPR-72,to Change Methodology for Sf Pool B Criticality Analysis.Change Is Necessary Due to Boraflex Degradation in Sf Pool B.Proposed Revs to USAR, TS & Holtec Rept,Encl + (02:22:57, 11 December 2024)
- ML20155F949 + (02:22:58, 11 December 2024)
- ML20155F944 + (02:22:59, 11 December 2024)
- ML20155F947 + (02:22:59, 11 December 2024)
- ML20155F940 + (02:23:00, 11 December 2024)
- ML20155F938 + (02:23:04, 11 December 2024)
- B17489, Forwards Request for Addl Info Re Post Accident Access to Vital Areas for Unit 3.No Commitments Contained in Ltr + (02:23:05, 11 December 2024)
- ML20155F936 + (02:23:05, 11 December 2024)
- ML20155F933 + (02:23:06, 11 December 2024)
- ML20155F934 + (02:23:06, 11 December 2024)
- ML20155F931 + (02:23:07, 11 December 2024)