Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155J092 + (02:04:48, 11 December 2024)
- ML20155J091 + (02:04:48, 11 December 2024)
- 3F1198-02, Forwards Response to GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment + (02:04:49, 11 December 2024)
- ML20155J088 + (02:04:50, 11 December 2024)
- ML20155J087 + (02:04:50, 11 December 2024)
- ML20155J085 + (02:04:51, 11 December 2024)
- ML20155J084 + (02:04:52, 11 December 2024)
- IR 05000413/1988020 + (02:04:53, 11 December 2024)
- ML20155J081 + (02:04:53, 11 December 2024)
- 05000454/LER-1988-007-10, :on 880919,loss of Shutdown Cooling During Reactor Cavity Level Lowering Evolution Occurred.Caused by Failure to Comprehend Fluid Restriction When Upper Assembly Full Seated.Training Sessions Initiated + (02:04:56, 11 December 2024)
- ML20155J075 + (02:04:57, 11 December 2024)
- ML20155J074 + (02:04:58, 11 December 2024)
- IR 05000259/1988010 + (02:05:12, 11 December 2024)
- ML20155J069 + (02:05:13, 11 December 2024)
- IR 05000445/1988066 + (02:05:14, 11 December 2024)
- ML20155J068 + (02:05:14, 11 December 2024)
- PY-CEI-NRR-0926, Responds to NRC Re Violations Noted in Insp Rept 50-440/88-12.Corrective Actions:Personnel Involved Counseled on Need for Procedural Compliance.Requalification Training on Current Events Being Taught + (02:05:15, 11 December 2024)
- ML20155J059 + (02:05:16, 11 December 2024)
- 05000277/LER-1988-022-01, :on 880919,concluded That Adequate Cell Switch Linkage Engagement Not Verified in Past & Possibility Exists That During Seismic Event,Addl Breakers May Have Failed. Caused by Inadequate Design of Control Linkage + (02:05:18, 11 December 2024)
- ML20155J051 + (02:05:19, 11 December 2024)
- ML20155J047 + (02:05:20, 11 December 2024)
- ML20155J049 + (02:05:20, 11 December 2024)
- 05000382/LER-1988-022, :on 880523,identified Failure to Perform Dye Penetrant Testing on Five Socket Welds as Potentially Reportable.Caused by Failure to Follow Procedures.Applicable Welding Procedures Will Be Revised + (02:05:26, 11 December 2024)
- ML20155J041 + (02:05:27, 11 December 2024)
- ML20155J035 + (02:05:28, 11 December 2024)
- ML20155J032 + (02:05:29, 11 December 2024)
- 05000454/LER-1988-008-07, :on 880921,radiation Monitor Detected Alert Radiation Condition During Movement of Reactor Vessel Upper Internals Assembly.Caused by Raising Reactor Vessel Upper Internals Assembly.Procedure Will Be Revised + (02:05:30, 11 December 2024)
- ML20155J028 + (02:05:32, 11 December 2024)
- ML20155J026 + (02:05:32, 11 December 2024)
- IR 05000321/1987031 + (02:05:33, 11 December 2024)
- ML20155J025 + (02:05:33, 11 December 2024)
- ML20155J023 + (02:05:34, 11 December 2024)
- ML20155J022 + (02:05:35, 11 December 2024)
- 05000293/LER-1998-023, :on 981005,incorrect Wiring Mods Affected RBCCW Train B Alternate Shutdown Panel.Caused by Error Made During Preparation of Electrical Connection Drawing to Implement Plant Design.Blown Fuse Replaced.With + (02:05:37, 11 December 2024)
- ML20155J019 + (02:05:38, 11 December 2024)
- ML20155J016 + (02:05:39, 11 December 2024)
- ML20155J017 + (02:05:39, 11 December 2024)
- ML20155J013 + (02:05:40, 11 December 2024)
- ML20155J010 + (02:05:41, 11 December 2024)
- ML20155J007 + (02:05:42, 11 December 2024)
- ML20155J004 + (02:05:43, 11 December 2024)
- ML20155J005 + (02:05:43, 11 December 2024)
- IR 05000348/1988018 + (02:05:47, 11 December 2024)
- ML20155J002 + (02:05:48, 11 December 2024)
- ML20155J000 + (02:05:49, 11 December 2024)
- ML20155H994 + (02:05:50, 11 December 2024)
- ML20155H999 + (02:05:50, 11 December 2024)
- ML20155H992 + (02:05:51, 11 December 2024)
- ML20155H987 + (02:05:52, 11 December 2024)
- ML20155H986 + (02:05:52, 11 December 2024)
- ML20155H984 + (02:05:53, 11 December 2024)