ML20155J084

From kanterella
Jump to navigation Jump to search
Advises That Response to Severity Level IV Violation Noted in Insp Repts 50-413/88-27 & 50-414/88-27,transmitted by J Grace ,Will Be Sent Before 881028.Violation Re Failure to Follow Radiological Control Procedures
ML20155J084
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/14/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810250196
Download: ML20155J084 (1)


Text

.

Il I

Duke Ibuer Company

}{st & Tecur Vice President

' Pit Bax33198 Nuclear Production Charlone. NC 28242 (704)373 4531 DUKEPOWER October 14,.1988 U. S. Nuclear Regulatory Comission Washington, D. C.

20555 Attention: Document Control Desk

Subject:

Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-4.3 and 50-414 NRC Inspection Reports Nos. 50-413, -414/88-27 Reply to a Notice of Violation Gentlemen:

Duke Power Company's response to Severity level IV violation No. 50-413

-414/88-27-01, which was transmitted by J. Nelson Grace's (NRC) letter dated September 16, 1988, has been delayed. The response to this violation concerning fai. lure to follow radiological control proc.edures will be sent before October 28, i

1988.

Very truly yours, sb

'/Ut i

Hal B. Tucker

)

PGL/

i xc H. L. Ernst, Acting Regional Administrator i

U. S. Nuc1 car Regulatory Comission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

).

Mr. W. T. Orders d

NRC Resident Inspector Catawba Nuclear Station i

8910250196 891014

/ O PDR ADOCK 05000413 o

PDC

. __._- _