ML20155J075

From kanterella
Jump to navigation Jump to search
Forwards 10CFR50.59 SE for Period Jan 1997 - May 1998. Summary of SE for Changes,Tests & Experiments Contained in Attachment.Summaries of Commitment Changes Made in Accordance with Guidelines of NEI 95-07 Attached Also
ML20155J075
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/03/1998
From: Hughey W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155J079 List:
References
GNRO-98-00088, GNRO-98-88, NUDOCS 9811120016
Download: ML20155J075 (2)


Text

__

l Entirgy operstions,Inc.

h PO. Boi, 756 Port Ot; son. MS 39150 Tel 601437-6470 W.K.Hughey Quector Nuclear Safety & Regulatory Affars November 3, 1998 U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Report of 10CFR50.59 Safety Evaluationsend Commitment Changes-

- January 1,1997 through May 31,1998.

GNRO-98/00088 Gentlemen:

In accordance with the requirements of 10CFR50.59(b), Entergy Operations, Inc. is reporting those changes, tests, and experiments, performed at Grand Gulf Nuclear Station during the period of January 1,1997 through May 31,1998. A summary of the safety evaluation for the changes, tests, and experiments is contained in the attachment. Also

/

attached are the summaries of commitment changes made in accordance with the guidelines of NEl 95-07 for the same period. If further information is required, please

/

contact this office.

Yours truly, l

f04 WKH/ACG ams attachment: %. Table of Contents of 10CFR50.59 Safety Evaluations and Commitment Change Evaluation Summaries cc:

(See Next Page) 9811120016 9d1103 i?

gDR ADOCK 05000416 l

PDR G9810281

.s

\\

GNRO-98/00088 Page 2 of 2 ~

l cc:

Ms. J. L. Dixon-Herrity, GGNS Senior Resident (w/a)

Mr. L. J. Smith (Wise Carter) (w/a)

Mr. N. S. Reynolds (w/a)

J Mr. H. L. Thomas (w/o)

Mr. E. W. Merschoff (w/a)

Regional Administrator l

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 i

G9810281 -

w a.

..