- ML20195D053 + (00:19:32, 11 December 2024)
- ML20195D054 + (00:19:32, 11 December 2024)
- ML20195D050 + (00:19:33, 11 December 2024)
- ML20195D051 + (00:19:33, 11 December 2024)
- ML20195D048 + (00:19:34, 11 December 2024)
- ML20195D047 + (00:19:34, 11 December 2024)
- ML20195D045 + (00:19:35, 11 December 2024)
- B17535, Forwards Monthly Operating Rept for Oct 1998 for Mnps,Unit 2.Revised MOR for Aug 1998,encl.No New Requlatory Commitments Are Contained in Ltr + (00:19:36, 11 December 2024)
- W3P88-1254, Forwards Public Version of Objectives for Emergency Preparedness Exercise Scheduled for 881012 + (00:19:36, 11 December 2024)
- IR 05000483/1986013 + (00:19:37, 11 December 2024)
- ML20195D040 + (00:19:37, 11 December 2024)
- ML20195D038 + (00:19:38, 11 December 2024)
- ML20195D037 + (00:19:39, 11 December 2024)
- 05000301/LER-1986-001-01, :on 860429,during Routine Test of Reactor Trip a Logic Circuits,Technician Inadvertently Tripped Reactor Trip Breaker B After Closing Bypass Breaker A.Caused by Personnel Error.Test Procedure Revised + (00:19:41, 11 December 2024)
- IR 05000267/1987029 + (00:19:42, 11 December 2024)
- ML20195D032 + (00:19:42, 11 December 2024)
- ML20195D030 + (00:19:43, 11 December 2024)
- ML20195D031 + (00:19:43, 11 December 2024)
- ML20195D029 + (00:19:44, 11 December 2024)
- ML20195D028 + (00:19:45, 11 December 2024)
- ML20195D027 + (00:19:45, 11 December 2024)
- A07538, Forwards Addl Info Re Corrective Actions Taken & Plans for Further Corrective Action Re Items Identified During Insp of Plant Emergency Operating Procedures (Eop).Revs Made to EOPs Eliminate Number of Deficiencies Identified + (00:19:46, 11 December 2024)
- ML20195D023 + (00:19:46, 11 December 2024)
- ML20195D022 + (00:19:49, 11 December 2024)
- ML20195D021 + (00:19:49, 11 December 2024)
- ML20195D020 + (00:19:50, 11 December 2024)
- ML20195D018 + (00:19:51, 11 December 2024)
- PNO-III-86-050, on 860528,at 90% Power,Unit Tripped Following Main Turbine Trip on Overspeed.Caused by Small Leakage in Pressurizer Spray Valve & Letdown Valve.Failure of intermediate-range Detector Under Investigation + (00:19:51, 11 December 2024)
- ML20195D016 + (00:19:52, 11 December 2024)
- 05000251/LER-1986-010-01, :on 860425,during Performance of Periodic Test Load on 4A 4-kV Bus,Breaker 4AA20 Failed to Close.Caused by Breaker Position Switch 52HH Not Being Actuated.Position Switch Replaced W/Redesigned Actuator & Guide + (00:19:57, 11 December 2024)
- ML20195D011 + (00:19:58, 11 December 2024)
- LIC-98-0149, Forwards 120-day Response to NRC GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Construction & Protective Coating Deficiencies & Foreign Matl in Containment + (00:19:59, 11 December 2024)
- ML20195D007 + (00:20:00, 11 December 2024)
- 05000354/LER-1988-025, :on 880930,both Control Room Emergency Filtration Units Determined Inoperable Due to Surveillance Procedure Not Meeting Requirement of Tech Spec 4.7.2.e.3. Procedure Revised + (00:20:04, 11 December 2024)
- 05000304/LER-1985-028, :Not Used + (00:20:06, 11 December 2024)
- ML20195D002 + (00:20:07, 11 December 2024)
- ML20195C999 + (00:20:08, 11 December 2024)
- ML20195D000 + (00:20:08, 11 December 2024)
- ML20195C998 + (00:20:09, 11 December 2024)
- 05000285/LER-1998-012, :on 980828,inappropriate Approval of Change to H Generation Design Basis Wwas Noted.Caused by Failure to Assess Impact of Proposed USAR Changes.Reviewed & Updated Design Analysis as Needed.With + (00:20:11, 11 December 2024)
- ML20195C996 + (00:20:12, 11 December 2024)
- ML20195C995 + (00:20:13, 11 December 2024)
- ML20195C994 + (00:20:13, 11 December 2024)
- ML20195C991 + (00:20:14, 11 December 2024)
- ML20195C989 + (00:20:14, 11 December 2024)
- IR 05000352/1988013 + (00:20:16, 11 December 2024)
- ML20195C984 + (00:20:17, 11 December 2024)
- L-99-090, Forwards Summary Review Completed to Verify Adequacy of Design Basis Accident Thermal Overpressure Protection for BVPS Unit 2 Containment Penetrations,Per Request + (00:20:17, 11 December 2024)
- ML20195C982 + (00:20:18, 11 December 2024)
- ML20195C979 + (00:20:19, 11 December 2024)
- ML20195C977 + (00:20:20, 11 December 2024)
- 05000298/LER-1988-026, :on 880930,momentary Undervoltage Condition on Emergency Transformer Sensed,Resulting in Auto Startup of Diesel Generators 1 & 2.Cause Unknown.Engineering Evaluation to Be Completed & Necessary Mods Made Prior to Startup + (00:20:21, 11 December 2024)