Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F1198-13, LAR 221,rev 2 to License DPR-72,revising Improved Tech Spec (ITS) 5.7.2 by Changing Type of Structural Integrity Assessment Required from Probabilistic to Deterministic.Rev of LAR 221 Due to Latest Guidance in Draft RG DG-1074 + (23:16:22, 10 December 2024)
- ML20195H649 + (23:16:22, 10 December 2024)
- ML20195H647 + (23:16:24, 10 December 2024)
- ML20195H645 + (23:16:25, 10 December 2024)
- ML20195H646 + (23:16:25, 10 December 2024)
- ML20195H642 + (23:16:26, 10 December 2024)
- ML20195H644 + (23:16:26, 10 December 2024)
- IR 05000445/1998007 + (23:16:28, 10 December 2024)
- ML20195H637 + (23:16:30, 10 December 2024)
- ML20195H638 + (23:16:30, 10 December 2024)
- ML20195H636 + (23:16:31, 10 December 2024)
- BSEP-88-0006, Responds to Violations Noted in Insp Repts 50-324/87-39 & 50-325/87-38.Corrective Actions:Periodic Test Procedure 08.2.2b Revised & Approved & Appropriate Plant Administrative Procedure Will Be Implemented + (23:16:32, 10 December 2024)
- ML20195H634 + (23:16:32, 10 December 2024)
- NRC-98-0182, Informs That J Cangealose,License OP-30804-1,is Now in Position with Util That No Longer Requires Operator License, Per 10CFR50.74 + (23:16:33, 10 December 2024)
- ML20195H631 + (23:16:33, 10 December 2024)
- IR 05000457/1988007 + (23:16:34, 10 December 2024)
- BECO-88-160, Advises That Secondary Containment Leak Rate Test Satisfactorily Performed on 880921.Test Verified Secondary Containment Integrity,As Defined by Tech Spec 4.7.C.1.C, Prior to RFO 7 CRD Venting + (23:16:35, 10 December 2024)
- ML20195H623 + (23:16:35, 10 December 2024)
- ML20195H622 + (23:16:36, 10 December 2024)
- ML20195H621 + (23:16:36, 10 December 2024)
- ML20195H620 + (23:16:37, 10 December 2024)
- ML20195H616 + (23:16:38, 10 December 2024)
- ML20195H618 + (23:16:38, 10 December 2024)
- ML20195H615 + (23:16:39, 10 December 2024)
- ML20195H614 + (23:16:39, 10 December 2024)
- ML20195H613 + (23:16:40, 10 December 2024)
- ML20195H609 + (23:16:41, 10 December 2024)
- ML20195H611 + (23:16:41, 10 December 2024)
- ML20195H607 + (23:16:42, 10 December 2024)
- ML20195H606 + (23:16:43, 10 December 2024)
- ML20195H604 + (23:16:44, 10 December 2024)
- ML20195H605 + (23:16:44, 10 December 2024)
- 05000133/LER-1988-002-02, :on 880521,gas Treatment Sys Actuated.Caused by Degradation of Resistor in 66 Ft Elevation Isolation Monitor Due to Aging.Resistor Replaced & Isolation Monitors Not Required Will Be Layed Up for Safstor Period + (23:17:28, 10 December 2024)
- ML20195H601 + (23:17:29, 10 December 2024)
- ML20195H599 + (23:17:29, 10 December 2024)
- LD-88-132, Forwards Advanced Reactor Severe Accident Program Topic Paper Set 6, Development of Severe Accident Mgt Program, for Review + (23:17:30, 10 December 2024)
- ML20195H594 + (23:17:31, 10 December 2024)
- ML20195H596 + (23:17:31, 10 December 2024)
- ML20195H593 + (23:17:32, 10 December 2024)
- ML20195H592 + (23:17:33, 10 December 2024)
- ML20195H590 + (23:17:35, 10 December 2024)
- ML20195H591 + (23:17:35, 10 December 2024)
- ML20195H587 + (23:17:36, 10 December 2024)
- ML20195H586 + (23:17:37, 10 December 2024)
- 3F0188-11, Responds to Violations Noted in Insp Rept 50-302/87-39. Corrective Actions:Future Solidified Waste Shipments Will Not Be Made Until Cause of Violation Determined & Corrected + (23:17:38, 10 December 2024)
- ML20195H585 + (23:17:38, 10 December 2024)
- ML20195H583 + (23:17:39, 10 December 2024)
- TAC:64245 + (23:17:39, 10 December 2024)
- ML20195H582 + (23:17:41, 10 December 2024)
- ML20195H579 + (23:17:42, 10 December 2024)
- ML20195H581 + (23:17:42, 10 December 2024)
- ML20195H576 + (23:17:43, 10 December 2024)