ML20195H637
| ML20195H637 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/11/1988 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-88030, NUDOCS 8801200294 | |
| Download: ML20195H637 (1) | |
Text
_
l
-==
rm Log # TXX-88030 r
Fi1e # 10130
.r
=
1R 85-18 IR 85-15 7UELECTRIC Ref. # 10CFR2.201 William G.rc mil Erecwin ikr in udent January 11, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-415 AND 50-446 INSPECTION REPORT NOS. 50-445/85-18 AND 50-446/85-15 REVISED RESPONSE FOR NOTICE OF VIOLATION (NOV) 445/8518-V-15 (ITEM C)
REF:
TV Electric Letter TXX-6692 from W. G. Counsil to the NRC dated August 31, 1987 Gentlemen:
Our referenced letter stated that we would provide an updated response to NOV 445/8518-V-15 by January 15, 1988. Our investigation of methods for evaluating fire effects on instrument tubing is not yet complete. We are currently attempting to ascertain the expected maximum temperature in affected areas during fire conditions. We are also pursuing a design modification which will eliminate the zinc embrittlement hazard for a substantial number of instruments.
Accordingly, our date for submission of an updated response to NOV 445/8518-V-15, is hereby revised to ha no later than May 30, 1988.
Very truly yours, 8'Adf-W. G. Counsil RSB/grr c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) 8801200294 880111 PDR ADOCK 05000445 G