Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20195K327 + (22:47:59, 10 December 2024)
- ML20195K323 + (22:48:00, 10 December 2024)
- ML20195K322 + (22:48:01, 10 December 2024)
- ML20195K320 + (22:48:01, 10 December 2024)
- 05000302/LER-1988-025, :on 881101,failure of Reactor Protection Sys Channel B to Meet All Acceptance Criteria of Surveillance Procedure Unrecognized Since 880929.Caused by Personnel Error.Personnel Counselled + (22:48:03, 10 December 2024)
- ML20195K318 + (22:48:04, 10 December 2024)
- ML20195K317 + (22:48:05, 10 December 2024)
- ML20195K315 + (22:48:06, 10 December 2024)
- ML20195K316 + (22:48:06, 10 December 2024)
- ML20195K313 + (22:48:07, 10 December 2024)
- ML20195K307 + (22:48:08, 10 December 2024)
- ML20195K312 + (22:48:08, 10 December 2024)
- ML20195K302 + (22:48:09, 10 December 2024)
- ML20195K301 + (22:48:10, 10 December 2024)
- ML20195K300 + (22:48:10, 10 December 2024)
- ML20195K297 + (22:48:11, 10 December 2024)
- ML20195K295 + (22:48:12, 10 December 2024)
- ML20195K294 + (22:48:13, 10 December 2024)
- ML20195K293 + (22:48:13, 10 December 2024)
- ML20195K292 + (22:48:14, 10 December 2024)
- 05000366/LER-1988-016, :on 880523,seven Snubbers Inadvertently Not Incorporated Into Procedure During Previous Procedure Revs. Caused by Procedure Inadequacy.Temporary Procedure Change Developed & Personnel Counseled + (22:48:15, 10 December 2024)
- JPN-88-002, Comment Supporting Proposed Rule 10CFR50 Re Proposed Policy Statement on Integrated Schedules for Implementation of Plant Mods.Concerns Re Schedule as License Amend Expressed + (22:48:16, 10 December 2024)
- ML20195K289 + (22:48:17, 10 December 2024)
- ML20195K287 + (22:48:18, 10 December 2024)
- ML20195K285 + (22:48:18, 10 December 2024)
- ML20195K284 + (22:48:19, 10 December 2024)
- ML20195K282 + (22:48:20, 10 December 2024)
- ML20195K283 + (22:48:20, 10 December 2024)
- ML20195K281 + (22:48:21, 10 December 2024)
- 05000265/LER-1988-014, :on 880420,due to ALARA Concerns,Facility Supplied Solidification Contractor W/Cold Sample for Decon as Representative Sample.Caused by Mgt Deficiency.New Station Procedures Will Be Developed + (22:48:23, 10 December 2024)
- ML20195K277 + (22:48:24, 10 December 2024)
- ML20195K276 + (22:48:24, 10 December 2024)
- ML20195K275 + (22:48:25, 10 December 2024)
- IR 05000370/1987035 + (22:48:26, 10 December 2024)
- ML20195K270 + (22:48:26, 10 December 2024)
- ML20195K268 + (22:48:27, 10 December 2024)
- ML20195K265 + (22:48:27, 10 December 2024)
- ML20195K263 + (22:48:29, 10 December 2024)
- ML20195K262 + (22:48:30, 10 December 2024)
- 05000293/LER-1999-003, :on 990516,discovered That LLRT Results Exceeded Allowable TS Leakage Rates.Cause Indeterminate. Affected Valves Were Disassembled & Inspected & Damaged or Worn Parts Were Reworked or Replaced.With + (22:48:31, 10 December 2024)
- ML20195K259 + (22:48:33, 10 December 2024)
- ML20195K258 + (22:48:33, 10 December 2024)
- ML20195K256 + (22:48:34, 10 December 2024)
- ML20195K254 + (22:48:37, 10 December 2024)
- NG-99-0835, Monthly Operating Rept for May 1999 for Daec.With + (22:48:38, 10 December 2024)
- ML20195K249 + (22:48:38, 10 December 2024)
- ML20195K248 + (22:48:39, 10 December 2024)
- ML20195K247 + (22:48:40, 10 December 2024)
- ML20195K246 + (22:48:41, 10 December 2024)
- ML20195K245 + (22:48:41, 10 December 2024)
- 05000265/LER-1988-012, :on 880524,existing Pipe Supports on Line 2-1265-2 Do Not Meet Design Requirements.Caused by Improper Design Analysis During Earlier Mod of Line.Supports Modified to Bring Line within FSAR Allowables + (22:48:43, 10 December 2024)