Forwards Inservice Insp Rept Trojan Unit 1 Nuclear Generating Plant for First Period Second Interval NDE ASME Section XI Required Exams, Vol 1-4
ML20195K268
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/30/1988
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20195K271 List:
References
NUDOCS 8812050176
Download: ML20195K268 (2)


Text

,.

?

~.

mfM Portland Gmefd Elechic Cmpany g

David W. Cockfield Vice President. Nuclear November 30, 1988 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission ATTN!

Document Control Desk Washington DC 20555 Dear Sir Inservice Inspection Sumary Report Title 10. Code of Federal Regulations, part 50.55a, paragraph g (Inservice Inspection Reports) requires the submittal of a summary Inservice Inspec-tion Report per the American Society of Mechanical Engineers (ASME) Boiler and pressure Vossel Code,Section II examinations, tests, replacements and repairs conducted since the preceding su mary report.

The summary report is to be submitted within 90 days of the completion of the Inservice Inspection conducted during the refueling outage.

On October 14, 1988, portland General Electric (pCE) reported that the Inservice Inspection Sumary Report for the Trojac Nuclear plant would be late due to a delay in completing the Owners Report for Inservice Inspections (NIS-1 Forms), and owners Report for Repair and Replacements (NIS-2 Forms).

In addition, pCE reported that an action plan had been developed to support completion of the foms by November 30, 1988 provided the Authorised Nuclear Inservice Inspector (ANII) concerns could be resolved.

Attached is the Trojan Nuclear plant Inservice Inspection Sumary Report for the period of August 10, 1987 to July 8, 1988. The report consists of a four-volume sot which includes the Inservice Inspection Report (NIS-1 Forms) and the Repair and Replacement Report (NIS-2 Foms).

Approximately 40 percent of the NIS-2 Foms that are scheduled to be submitted have been completed by pCE and accepted by the ANII.

The remaining NIS-2 Foms are scheduled to be submitted to the ANII for acceptance by December 23, 1988.

It is anticipated that the ANII will sk l

/

set:csoin s113o A

{DR AOccK 05000344 hk N

r DL

/

i na

- ic

i co.

Portland GeneralBechicCormany Document Control Desk November 30. 1988 Pane 2 f

6 complete the review of the remaining 60 percent of the NIS-2 Forms and accept the forma during January. 1989. Therefore, a supplemental submittal will be made on February 1. 1989 and will include the NIS-2 Fot1as that have j

been accepted by the ANII.

Sincerely, e

l s,

dd l

l l

t l

Attachment c:

Mr. John B. Martin j

Regional Administrator. Region V U.S. Nuclear Regulatory Commission j

Mr. William T. Dixon, w/o attachmonts State of Oregon Department of Energy f

Mr. R. C. Barr, w/o attachmen'.s I

NRC Resident Inspector t