B.
OPERATING DATA REPORT DOCKET NO.
050-454 UNIT:
Byron One DATE:
05/10/88 COMPILED BY:
D. J. Spitzer TELEPHONE:
(815)234-5441 x2023 OPERATING STATUS 1.
Reporting Period: April 1988. Gross Hours:
719 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED 3.
Power Level to Which Restricted (If Any): 1097 (Mwe-net) 4.
Reasons for Restriction (If Any):
Steam Generator Split Flow (23MW)
THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report deriod Hrs.
719 2903 22992 6.
Rx Critical Hours 368.7 2552.7 17864.7 7.
Rx Reserve Shutdown Hours 0
0 37.8 8.
Hours Generator on Line 359.1 2543.1 17504.1 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (HWH) 934505 7826762 51422612
- 11. Gross Elec. Energy (MWH) 310196 2592971 17218748
- 12. Net Elec. Energy (MWH) 283917 2443456 16182933
- 13. Reactor Service Factor 51.3 87.9 77.7
- 14. Reactor Availability Factor 51.3 87.9 77.9 1
- 15. Unit Service Factor 50.0 87.6 76.1
- 16. Unit Availability Factor 50.0 87.6 76.1
- 17. Unit Capacity Factor (MDC net)
N/A N/A N/A
- 18. Unit Capacity Factor (DER net) 35.2 75.1 62.8
- 19. Unit Forced Outage Hrs.
65.3 65.3 977.4
- 20. Unit Forced Outage Rate 15.4 2.5 5.3
- 21. Shutdowns Scheduled Over Next 6 Months: 09/03/88
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(0625M/0062M-4) 8806290301 880610 PDR ADOCK 05000454 R
PDR l
Report Period April, 1988 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 1)
A Date Typg_. HQnIs ERASDB Method _LER Number _ SystCm__ ComDQnent.
Cause & CoIIgrJ;ive Action to Prevent Recun.nce 4.
04/03/88 S
294.6 A
1 SG Outage for Snubber Inspection and ID Steam Generator Leak Repair.
5.
04/18/88 F
65.3 A
3 6-88-002-00 Rx Trip On Power Range Flux Rate HIgh.
6.
04/23/88 B
5 Re-Adjust Power Range N.I.
"High Flux Rx Trip" Setpoints.
ceaoco*********
O Sunnary occomo*********
TYPE Eeason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H-S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reducad Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
B.
'OPERAT2NG DATA REPORI DCCKET NO.:
050-455 UNIT:
Byron Two DATE:
05/10/88 COMPILED BY:
D. J.
Spitzer TELEPHONE:
(815)234-5441 x2023 OPERATING STATUS 1.
Reporting Period: April 1988.
Gross Hours:
719 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross; Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (HWe-net): NOT DETERMINED 3.
Power Level to Which Restricted (If Any):
1055 (MWe-net) 4.
Reasons for Restriction (If Any):
Steam Generator Split Flow. (65 MW)
THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
719 2903 6096 6.
Rx Critical Hours 719 2888.6 5217.8 7.
Rx Reserve Shutdown Hours 0
0 0
8.
Hours Generator on Line 719 2690.2 4970.6 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH) 2215387 7660533 14132697
- 11. Gross Elec. Energy (MWH) 765010 2561438 4665749
- 12. Het Elec. Energy (MWH) 723376 2410588 4381489
- 13. Reactor Service Factor 100 99.5 85.6
- 14. Reactor Availability Factor 100 99.5 85.6
- 15. Unit Service Factor 100 92.7 81.5
- 16. Unit Availability Factor 100 92.7 81.5
- 17. Unit Capacity Factor (MDC net)
N/A N/A N/A
- 18. Unit Capacity Factor (DER net) 89.7 74.1 64.2
- 19. Unit Forced Outage Hrs.
0 25.2 312.2
- 20. Unit Forced Outage Rate 0
1.0 6.0
- 21. Shutdowns Scheduled Over Next 6 Months:
- 22. If Shutdown at End of Report Period, Estimated Date of Startup:
- 23. Units in 1est Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(0625M/0062M-10)
Raport Period April, 1988 UNIT SHUTDOWNS / REDUCTIONS BYRON (UNIT 2)
_Eh_
Date Iype liours Reason Method LER NumDRI System Component Cause & Corrective Action to Prevent Recurrence 7.
04/08/88 S A
5 FW 2C FW Pp 2C Feedwater Pump Low Pressure Governor Valve ocoo***********
Summary ooce***********
TYPE Eeason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Othe r (LER) File (NUREG-0161) i I
(0625M/0062M-12)
- -